AMC-505-2 Hydrostatic Pressure Tests.pdf

PDF 24 KB Posted

Attached to
FY21 Henry Bigelow Drydock Repairs
Solicitation number
1305M220QNMAN0190
Issued by

About this file

This document contains a federal specification for hydrostatic pressure testing of pressure vessels and piping systems on NOAA ships. It outlines requirements for conducting hydrostatic pressure tests, including coordinating with the Contracting Officer's Technical Representative, using potable water or fresh water as the test medium, holding the test pressure for ten minutes then additional time as needed for inspection, stamping the test date and pressure on the vessel test plate, and having the COTR witness all tests and relief valve settings. The related federal contract opportunity is for drydock repairs to the NOAA ship Henry Bigelow in fiscal year 2021, including any necessary hydrostatic pressure testing in accordance with the specification.

View the file

Other files

File Type Posted
Amendment 0003.pdf PDF
(134)Knuckle Boom Crane_Part2.pdf PDF
(134)Knuckle Boom Crane_Part1.pdf PDF
Bigelow Trawl Winch Drawings.pdf PDF
VideoXpert.pdf PDF
HB FY21 Dry Dock Repair Spec_Rev 1.pdf PDF
(012)Centerboard_Rev1.pdf PDF
HB 124931 Cover.pdf PDF
HB310 FRV40 225 041 010 Generator 3 Phase Synchronous.pdf PDF
HB-085 FA02 General Arrangements.pdf PDF
HB-568 (FRV40-225-008-010) Bow Thruster.pdf PDF
HB-300 FE01 Power One Line.pdf PDF
HB-085 FA04 Docking Drawing.pdf PDF
HB-461 FE93 Transducer Arrangement and Installation(1).pdf PDF
VideoXpert Professional v 3 7 Product Specification.pdf PDF
HB167 FH62 STRL Doors Hatches Manholes Scuttles.pdf PDF
HB-512-5010 Assy Unit 5010 HVAC A_D.pdf PDF
AMC 0001F General Requirements for Contract Repair Work on NOAA Ships.pdf PDF
AMC-0001F General Requirements for Contract Repair Work on NOAA Ships.pdf PDF
HB-100 FH68 BERP _ WERP Key Plan and Details.pdf PDF
Appleton Drawing AMD-2129 REV 0 Jib Pin Assembly.pdf PDF
HB FY20 Liferaft Certificates.pdf PDF
Naval Ships Technical Manual 081 Waterborne Underwater Hull Cleaning of Navy Ships.pdf PDF
HB-160 FH19 Centerboard Bottom Void Scantlings(1).pdf PDF
HB 124622 Sleeve Doubler 3inch NPS.pdf PDF
HB-085 FA01 Outboard Profile.pdf PDF
CC-7137_Plan_001.pdf PDF
Amendment 0002.pdf PDF
Air Box and Generator Pictures (1).pdf PDF
P 1097 19 Henry B. Bigelow LeBus Sleeves.pdf PDF
HB 124930 Casing.pdf PDF
Aft Deck Hatch.pdf PDF
Airmar B17-HP Temp Sensor.pdf PDF
HB-160 FH19 Centerboard Bottom Void Scantlings.pdf PDF
HB-461 FE93 Transducer Arrangement and Installation.pdf PDF
HB-461-002 EM2040 Installation Cable Run Sheets.pdf PDF
Standard - MIL-STD-2199A Glass Reinforced Plastic Covering for Propeller Shafts.pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
(005)Line Shaft and Thrust Bearing Manual.pdf PDF
AMC-300-1 Overhaul of Electrical Rotating Machinery.pdf PDF
Amendment 0001.pdf PDF
(006)SternTubeBearing and Shaft Seal Resubmittal.pdf PDF
Furuno FE800 Installation Manual.pdf PDF
HB-461-001 EM2040 MkII 0.4x0.7 Installation.pdf PDF
Airmar Owners Guide _ Installation Instructions - SS577- 33-495-01.pdf PDF
Radial-Rubber-Tile-RBT-Submittal.pdf PDF
MOC-573-2 Overhaul-Repair of Hydraulic Cylinders.pdf PDF
S6900 General Requirement for Electrical-Electronic Items.pdf PDF
MOC-631-3B Underwater Body Ablative Coating System.pdf PDF
(139)Cathelco Antifouling System.pdf PDF
Show 40 more

Latest 50 of 106 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-505-2

APRIL 1988

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-505-2

HYDROSTATIC PRESSURE TESTS

1. SCOPE. This specification contains the general requirements for performing hydrostatic pressure tests on pressure vessels and piping systems of NOAA ships.

2. REFERENCES.

None

3. REQUIREMENTS.

3.1 Prior to conducting a hydrostatic pressure test, meet with the COTR or other designated NOAA representative and discuss preparations, precautions, and procedures to be followed during the test.

3.2 The test pressure will normally be specified in the detail specification or other procurement document which requires the test. In the event the test pressure is not specified, the test pressure shall be 125 percent of the maximum allowable working pressure of the pressure vessel or system being tested.

3.3 Isolate, disconnect, and blank-off piping, equipment and

other components to avoid contaminating or subjecting them to the test pressure. Isolation shall be by blank flanges or similar means. Valves may be used if suitable for the required test pressure. After completing the test, return the systems, piping and other components to the as-found condition.

3.4 Remove relief valves from the pressure vessel or piping

system prior to the test. Test each relief valve for proper operation and set pressure. Reset to the pressure specified in the detail specification or other procurement document. If the pressure is not specified, reset the relief valves to a pressure equal to 105 percent of the system's or pressure vessel's maximum operating pressure. Install a new seal and metal tag on each relief valve. The tag shall be stamped with the test date and pressure setting. After completing the hydrostatic pressure tests, reinstall the relief valves.

3.5 When testing pressure vessels or piping designed for air or vapor service, provide additional temporary support as needed to support the additional weight of the water during the test.

3.6 Potable water shall be used as the test medium to test

piping and pressure vessels connected to the ship's potable water system. Fresh water shall be used as the test medium for all other pressure vessel and piping system tests. When filling the system or pressure vessel, insure that all air has been vented and that all air pockets have been eliminated before applying the test pressure.

3.7 When testing new welds or flanged joints, do not insulate, paint or otherwise cover the welds or joints until the test has been accepted by the COTR or other designated NOAA representative.

3.8 Test equipment shall contain the following:

3.8.1 A self-actuated and resetting relief valve set at a

pressure no greater than 110 percent of the test pressure.

3.8.2 A master pressure gage having a low range of 0 and a

high range which equals 125-200 percent of the test pressure.

The largest graduation of the master pressure gage shall be no more than 2 percent of the test pressure. The gage shall have been calibrated within the past 12 months and have a label attached which identifies the calibration date and facility. The gage shall be mounted where it can be easily seen by the pump operator and the COTR.

3.8.3 A water pump capable of slowly applying the required

pressure.

3.8.4 An isolation valve located between the pump and the

master pressure gage to allow the pump to be isolated while the gage indicates the pressure in the pressure vessel or system.

3.9 Hold the test pressure for 10 minutes. Then hold the

pressure an additional time as needed by the COTR to conduct an inspection for leaks and excessive stress.

3.10 After the hydrostatic test has been accepted, pump and

dispose of the water used for the test. The Contractor may drain the water to the ship's bilges only if the water will be subsequently pumped from the bilges and disposed of by the Contractor.

3.11 Stamp the date and test pressure on the test plate attached to each pressure vessel. If all available spaces on the test plate have been previously used, install a new test plate with the required test data stamped on it. The new test plate shall have sufficient spaces for at least 4 additional tests to be stamped.

4. QUALITY ASSURANCE.

4.1 The COTR or another designated NOAA representative shall

witness all hydrostatic tests and relief valve settings.

4.2 Provide to the COTR two copies of a test report containing the Contractor's name, test pressure, relief valve setting, and date for each test performed.