This amendment provides questions and answers regarding solicitation number 1305M220QNMAN0179 for FY21 RFQ Nancy Foster Drydock Repairs. The National Oceanic and Atmospheric Administration seeks drydock repairs of the Nancy Foster, including deck coverings, thermal and pipe insulation, doors and door hardware, and electrical system upgrades. Bidders asked for clarification on deck materials, assumptions for insulation amounts and pricing, door schedule specifications, and electrical drawings. Provided responses reference other amendment documents, set assumptions for unspecified items, and attach new electrical drawings to aid estimation of work items.
View the file
Other files
Show 40 more
Latest 50 of 87 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
3. EFFECTIVE DATE
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT/MODIFICATION NO.
07/27/2020 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
NMAN7200-20-01184
6. ISSUED BY CODE AJ930073 7. ADMINISTERED BY (If other than Item 6) CODE
NOAA/ERAD
200 GRANBY STREET
NORFOLK, VA 23510
See Block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
(X) 9 A. AMENDMENT OF SOLICITATION
NO.
1305M220QNMAN0179
9B. DATED (SEE ITEM 11)
06/30/2020
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, x is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, x is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this Amendment is provide the following:
1. Questions and Answers.
2. Provide electrical drawings.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Question 1:
Item 5.4 Deck Covering 634-1B_Deck Coverings state that the underlayment is covered with electrogalvanized sheet metal. Can you please confirm? If the flooring does have sheet metal on the existing flooring, are we to include new sheet metal?
Answer 1:
There is no sheet metal installed over underlayment. They will not be required to include any sheet metal.
Question 2:
Item 5.2 Section 7.1.5 Thermal & Pipe insulation – What is the existing type of thermal insulation (3” foil faced, 3” mylar face, 3” canvas faced, unfaced.)? If the type remains unknown we will account for 32 square feet of 3” foil faced mineral wool What is the size of the piping insulation and does it have a certain type of lagging on it? How much linear feet of piping insulation is needed?
Answer 2:
Use assumption described above. Exact amount of piping will be determined by design in paragraph 7.1.2. Assume budget of $10000 for this aspect of the work item.
Question 3:
Item 5.5 Section 7.5 – Is there a door schedule available with sizes, frame descriptions and hardware specifics? Can we use different brand doors?
Answer 3:
“Missing Refs FY21 DD Rev 1” in Amendment 0003. “Joiner door and window schedule”
Question 4:
For Item 5.5.7.3 – there should be a drawing available titled joiner doors list that shows fire rating, locking function, orientation, venting, etc. Going to need that drawing to bid this item. The company that made the original doors has been bought out by MML Marine.
Answer 4:
“Missing Refs FY21 DD Rev 1” in Amendment 0003. “Joiner door and window schedule”
Question 5:
While reviewing Amendment #3, I came to question number 14 regarding the minimum keel block height. Due to draft restrictions in the river, we are limited in are keel blocking height. I see the main cause for this large keel blocking requirement is due to the transducer maintenance. We have done work in the past with a similar requirement and we can position the vessel in such a way where the transducer maintenance is still performed with the minimum height threshold it needs but the blocking would remain at our maximum of 2’. Is this something that could be feasible?
Answer 5:
No.
Question 6:
Our question is 2.1 NF One-Line Electrical Diagram drawing number NF-320-008 the only drawing available? Can you provide the whole ships electrical power one-line drawing? We are having extreme difficulty in estimating that particular work item.
Answer 6:
See Electrical drawings attached Amendment 0005.
| 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS |
| 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. |
| Question and Answers.pdf |
| Question 1: |
| Answer 1: |
| Question 2: |
| Question 3: |