S01 12FPC120Q0039 Att2-9CS421 Excavation58_25ThirdAveExt.pdf

PDF 251 KB Posted

Attached to
Residential Parcel Demolition and Site Finishing for the State of Connecticut, USDA NRCS.
Solicitation number
12FPC120Q0039
Issued by

View the file

Other files

File Type Posted
S01 12FPC120Q0039 Amend1 Att2-2CS1Clearing58_25ThirdAveExt_REVISED 7_16_2020.pdf PDF
S01 12FPC120Q0039 Amend1 Att1 SOWDemoPrelimRest58_25ThirdAveExt6.2020_REVISED07142020.pdf PDF
S01 12FPC120Q0039 Amend1 SF 30.pdf PDF
S01 12FPC120Q0039 Amend1_Price Schedule_TermsConditionsClauseProvisions_REVISED_07.20.2020.pdf PDF
S01 12FPC120Q0039 Amend1 Att2-11CS426Topsoiling58_25ThirdAveExt_REVISED 7_14_2020.docx.pdf PDF
S01 12FPC120Q0039 Price Schedule_TermsConditionsClauseProvisions.pdf PDF
S01 12FPC120Q0039 Att4CPS342CritAreaPlantImpReq58_25DemoRest.pdf PDF
S01 12FPC120Q0039 Att2-5CS406SeedSprigMulching58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att3CPS342CritAreaPlant58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att5-225ThirdAveExtBoundarySurveyMap.pdf PDF
S01 12FPC120Q0039 Att2-12CS494ContrQualCont58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att2-1CS8MobDemo58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att9DavisBaconActWDCT20200010NewHavenCtyCT.pdf PDF
S01 12FPC120Q0039 Att2-3CS403StructureRemoval58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att2-4CS405PollutionControl58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att2-2CS1Clearing58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att7-2HazardBuildMatInvRpt58ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att2-11CS426Topsoiling58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att8QAP58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att7-1HazardBuildMatInvRpt25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att1 SOWDemoPrelimRest58_25ThirdAveExt6.2020.pdf PDF
S01 12FPC120Q0039 Att5-158ThirdAveExtBoundarySurveyMap.pdf PDF
S01 12FPC120Q0039 Att2-6CS409TrafficControl58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att6SEC22a133k3GrdWaterRemediationStds.pdf PDF
S01 12FPC120Q0039 Att2-8CS411 RemovalWater58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att2-7CS410WaterforConst58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 SF 1442.pdf PDF
S01 12FPC120Q0039 Att2-10CS423Earthfill58_25ThirdAveExt.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Specification 421—Excavation

1. Scope The work shall consist of the excavation required by the specifications and disposal of the excavated materials.

2. Classification Excavation is classified as common excavation, rock excavation, or unclassified excavation in accordance with the following definitions.

Common excavation is defined as the excavation of all materials that can be excavated, transported, and unloaded using heavy ripping equipment and wheel tractor-scrapers with pusher tractors or that can be excavated and dumped into place or loaded onto hauling equipment by excavators having a rated capacity of one cubic yard or larger and equipped with attachments (shovel, bucket, backhoe, dragline, or clam shell) appropriate to the material type, character, and nature of the materials.

Rock excavation is defined as the excavation of all hard, compacted, or cemented materials that re-quire blasting or the use of ripping and excavating equipment larger than defined for common excava-tion. The excavation and removal of isolated boulders or rock fragments larger than 1 cubic yard en-countered in materials otherwise conforming to the definition of common excavation shall be classified as rock excavation. The presence of isolated boulders or rock fragments larger than 1 cubic yard is not in itself sufficient cause to change the classification of the surrounding material.

For the purpose of these classifications, the following definitions shall apply:

Heavy ripping equipment is a rear-mounted, heavy duty, single-tooth, ripping attachment mounted on a track type tractor having a power rating of at least 250 flywheel horsepower unless otherwise specified in section 9.

Wheel tractor-scraper is a self-loading (not elevating) and unloading scraper having a struck bowl capacity of at least 12 cubic yards.

Pusher tractor is a track type tractor having a power rating of at least 250 flywheel horsepower equipped with appropriate attachments.

Unclassified excavation is defined as the excavation of all materials encountered, including rock materials, regardless of their nature or the manner in which they are removed.

408–1NRCS -- 7/2020

CT -- West Haven Home Removals

Solicitation 12FPC120Q0039 Attachment 2-9CS421Excavation25_58ThirdAveExtensions

3. Use of excavated material

Method 1—To the extent they are needed, all suitable material from the specified excavations shall be used in the construction of required permanent earthfill or rockfill. The suitability of material for spe-cific purposes is determined by the inspector. The contractor shall not waste or otherwise dispose of suitable excavated material.

Method 2—Suitable material from the specified excavations may be used in the construction of re-quired earthfill or rockfill. The suitability of material for specific purposes is determined by the inspector.

4. Disposal of waste materials

Method 1—All surplus or unsuitable excavated materials are designated as waste and shall be disposed of at the direction of the sponsor.

Method 2—All surplus or unsuitable excavated materials are designated as waste and shall be disposed of by the contractor at sites of his own choosing away from the site of the work. The disposal shall be in an environmentally acceptable manner that does not violate local rules and regulations.

5. Excavation limits

Excavations shall comply with OSHA Construction Industry Standards (29CFR Part 1926) Subpart P, Excavations, Trenching, and Shoring. All excavations shall be completed and maintained in a safe and stable condition throughout the total construction phase. Structure and trench excavations shall be completed to the specified elevations and to the length and width required to safely install, adjust, and remove any forms, bracing, or supports necessary for the installation of the work. Excavations outside the lines and limits shown on the legal boundary maps are not permitted. Contractor is fully responsible for ensuring there is no damage done to neighbor's property, structural or otherwise.

6. Borrow excavation When the quantities of suitable material obtained from specified excavations are insufficient to con-struct the specified earthfills and earth backfills, additional material shall be obtained from the desig-nated borrow areas. The extent and depth of borrow pits within the limits of the designated borrow areas shall be as specified by the sponsor and approved by the inspector prior to use.

Borrow pits shall be excavated and finally dressed to blend with the existing topography and sloped to prevent ponding and to provide drainage.

7. Overexcavation

Excavation in earth beyond the specified lines and grades shall be corrected by filling the resulting voids with approved, compacted earthfill.

408–2NRCS -- 11/2015

8. Measurement and payment

For items of work for which specific unit prices are established in the contract, the volume of each type and class of excavation within the specified pay limits is measured and computed to the nearest cubic yard by the method of average cross-sectional end areas or by methods outlined in section 9 of this specification. Regardless of quantities excavated, the measurement for payment is made to the specified pay limits except that excavation outside the specified lines and grades directed by the engineer to re-move unsuitable material is included. Excavation required because unsuitable conditions result from the contractor's improper construction operations, as determined by the engineer, is not included for mea-surement and payment.

Method 1—The pay limits shall be by lump sum in the contract price

Method 2—The pay limits shall be defined as follows:

a. The upper limit shall be the original ground surface as it existed before the start of construction operations except that where excavation is performed within areas designated for previous exca-vation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earthfill.

b. The lower and lateral limits shall be the neat lines and grades shown on the drawings.

Method 3 —The pay limits shall be defined as follows:

a. The upper limit shall be the original ground surface as it existed before the start of construction operations except that where excavation is performed within areas designated for previous exca-vation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earthfill.

b. The lower and lateral limits shall be the true surface of the completed excavation as directed by the engineer.

Method 4—The pay limits shall be defined as follows:

a. The upper limit shall be the original ground surface as it existed before the start of construction operations except that where excavation is performed within areas designated for previous exca-vation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earthfill.

b. The lower limit shall be at the bottom surface of the proposed structure.

c. The lateral limits shall be 18 inches outside of the outside surface of the proposed structure or shall be vertical planes 18 inches outside of and parallel to the footings, whichever gives the larger pay quantity, except as provided in d below.

d. For trapezoidal channel linings or similar structures that are to be supported upon the sides of the excavation without intervening forms, the lateral limits shall be at the underside of the proposed lining or structure.

e. For the purposes of the definitions in b, c, and d, above, any specified bedding or drainfill directly beneath or beside the structure will be considered to be a part of the structure.

All methods—The following provisions apply to all methods of measurement and payment.

Payment for each type and class of excavation is made at the contract unit price for that type and class of excavation. Such payment will constitute full compensation for all labor, materials, equipment, and all other items necessary and incidental to the performance of the work except that extra payment for backfilling overexcavation will be made in accordance with the following provisions.

408–3NRCS -- 11/2015

Compensation for any item of work described in the contract, but not listed in the bid schedule is in-cluded in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 9 of this specification.

9. Items of work and construction details

408–4NRCS -- 11/2015

CT -- West Haven Home Removals

Solicitation 12FPC120Q0039 Attachment 2-9CS421Excavation25_58ThirdAveExtensions

Arthur.Ramthun Typewritten Text Item 3 - Use of excavated material shall be by Method 1.

Item 4 - Disposal of waste materials shall be by Method 2. Excavation shall be the minimum needed to remove structures such as basement walls, asphalt driveways, pipelines, or other structures.

Item 8 - Measurement and Payment shall be by method 1 and included in the lump sum contract price.

No separate bid item for excavation will be paid.

File details come from the government source that posted it. Updated .