Text version
(x)
12FPC120Q0039
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
NRCS-TX-TEMPLE
TEMPLE TX 76501
101 SOUTH MAIN ST.
USDA-NCRS-TEXAS STATE OFFICE
FPAC-HQ-12FPC1
WASHINGTON DC 20250
1400 INDEPENDENCE AVE SW, RM 6801-S
FPAC BUS CNTR-ACQ DIV-OPS BRANCH-SE
07/20/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/19/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment adds the following REVISIONS, to the Price Schedule, Statement of Work, Construction Specifications 1 and 426, in additions, add the Questions and Answers (Q&A) from the Pre-Bid Teleconference, July 14, 2020, 3:00 pm Eastern and Site Visit Showing July
15, 2020, 10:00 am Eastern to include a list of attendees.
ATTACHMENT(S)
1. Add REVISED Price Schedule, dated July 20, 2020, Add Line Item 003, tree removal,
2. Add REVISED Statement of Word, dated July 14, 2020,
3. Add REVISED Construction Specification 1 - Clearing, dated July 16, 2020, Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12FPC120Q0039/0001
4. Add REVISED Construction Specification 426 -
Topsoiling, dated July 14, 2020
5. Add Questions and Answers (Q&A)
Q. In two of the documents (the Statement of Work and the 426 Specification for topsoil) it calls out needing a minimum of 6¿ topsoil, but in the
Practice Requirements for Critical Area Planting, it says it should be a minimum of 4¿. Which is it?
A: Let¿s go with a 4¿ minimum. Statement of work and specifications have been revised to reflect this correction.
Q: In the Haz-Mat Report for 58 Third Avenue
Extension, the amount of asbestos reported is summarized strangely. How much total asbestos is needing removal from this residence?
A: The report lists asbestos in a joint compound in 7 different locations, 3 locations where there is 3000 s.f. of asbestos containing joint compound, , 3 locations with 120 s.f. of asbestos containing flooring kitchen flooring materials, and 1 attic window for a total of 9360 sq. ft.
plus 1 window needing removal and abatement prior to demo. Tracking manifests will need to be submitted to the COR when this work is completed.
Q: What types of erosion control measures are anticipated on these sites?
A: All catch basins will need drain socks staked in place around them until the construction is over and the street is cleaned. All downgradient areas of the project sites will also need silt fence installed, which is to be removed once vegetation has established. Silt fences around the entire property boundary are not necessary.
In general, the property frontage at 25 Third
Avenue Extension, and the perimeter of the back yard edge near Old Field Creek on 58 Third Avenue extension will need silt fences.
Q: Is chain link fencing required around the entire perimeter of the properties?
A: According to the West Haven building and zoning department, fencing is required for any
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12FPC120Q0039/0001
holes that are left unattended. Therefore fencing will be required around any excavated basement holes or other trenches or pits left open during times when construction site is unattended.
Q: Can we hydroseed the seed mix?
A: Hydroseeding this seed is not recommended since the seed itself is very tiny. You will likely want to use a handheld grass seed spreader with a hand crank.
Q: Are the utilities to the residences turned off?
A: No. The gas and power is still on at both residences and the water is still on at 58 third avenue extension (we think). Doug Colter, City of West Haven Building Department and Kristin
Walker, NRCS COR, have agreed to work together to get these utilities disconnected within the next few weeks so the residences will be ready to go once a contract is awarded.
6. Clarifications and highlights made during the meeting:
--Contractor must have a class B (minimum) demolition License in order to qualify for this solicitation according to the City of West
Haven¿s regulations
--Contractor must have a current DUNS / Active
SAM registration in order to be considered for this solicitation.
--Danny Mandell introduced himself as the main point of contact for the contracting officer, Julie Simpson, and he will also be the point of contact for any issues with the contract itself.
--Noise ordinance in West Haven stipulates hours of noise generating activities must be limited to between the hours of 7am and 8pm.
--Work schedule is 5 days a week. To work on a
Saturday, the selected contractor must request permission to work on a Saturday in writing to the COR. It may be granted and it may be denied
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12FPC120Q0039/0001
depending on types of activities proposed and availability of inspectors
--Hard hats and work boots shall be worn on the site at all times. Safety signage must be displayed on the site as specified in the solicitation. A COR or Inspector may halt progress if there are safety violations and permission to commence work can only be granted by the Contracting Officer or their appointed representative.
--No hydrants will be available for water for dust control or other purposes during construction. Contractor will be responsible for securing their own source of water daily when needed.
--Be aware of topsoil testing requirements.
NOTE: Thickness of topsoil shall be a minimum of
4¿ and a corrected SOW and 426 Topsoil
Specification with this clarified have been given with this solicitation. Material MUST MEET specification 426 including passing laboratory test values for pollutant levels specified. This is a groundwater class B basin, which will determine pollutant mobility criteria, which could be the more stringent of the testing analyses. No topsoil will be brought on-site without receiving approval from the COR that it meets the specifications in this solicitation package.
--Be aware of tidal influence on groundwater.
Groundwater is shallow and can fill an empty basement hole if tides are not accounted for prior to removal of the basement walls.
--Time modifications need to be requested at least 5 days in advance prior to the expiration of the contract Period of Performance. A time extension may or may not be approved depending on the basis for justification.
--Cost modifications are strongly discouraged and will take a minimum of 14 days to review. A cost modification may or may not be approved depending on the basis for justification and whether or not funds can be made available. Note: cost modifications will only be applicable when the
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
5 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12FPC120Q0039/0001
work involves additional components or complexities that are above and beyond the expectations outlined in the original Scope of
Work.
--There may be monitoring of demolition and basement removal/filling activities by the Office of the State Archaeologist due to potential for
Indian artifacts or remains. If cultural resources are encountered, work is to cease immediately and direction will be given by the respective cultural resource authority.
--An Primary and Alternate safety officer is to be appointed for this site. A first aid kit is mandatory to be on-site and its location identified according to the solicitation guidance. A safety meeting is to be held at the beginning of each week prior to construction activities.
--Kristin Walker will serve as the project COR
(contracting officer¿s representative) and will be the eyes and ears on the project reporting back to the contracting officer if there are any issues encountered. A project inspector will also be assigned who will serve as the daily eyes and ears on the construction site. A combination of one or both may be on-site at any given time during construction activities.
--Payments must be submitted in the IPP.gov platform. Registration into this system early is highly encouraged. All payments and invoices shall be submitted here for review and approval.
The COR has 7 business days to approve or deny a request for payment. The CO has an additional 7 days to make final approval of the payment. It is advised that draft invoices be submitted to
Kristin Walker prior to submittal into the IPP platform to ensure concurrence of the billed amount ahead of time and streamline the payment process.
List of Attendees (Site Visit Showing) July 15, 2020, 58 Third Ave Ext. West Haven, CT
1. Thomas Catucci, Manager, Ludlow Associates, LLC,
2. Strati Patrakis, Estimator, Bestach.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
6 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12FPC120Q0039/0001
Contractor shall acknowledge this amendment in blocks 15a, 15b, and 15c and return one signed copy with your quote submission.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)