S01 12FPC120Q0039 Amend1 SF 30.pdf

PDF 103 KB Posted

Attached to
Residential Parcel Demolition and Site Finishing for the State of Connecticut, USDA NRCS.
Solicitation number
12FPC120Q0039
Issued by

View the file

Other files

File Type Posted
S01 12FPC120Q0039 Amend1 Att2-2CS1Clearing58_25ThirdAveExt_REVISED 7_16_2020.pdf PDF
S01 12FPC120Q0039 Amend1 Att1 SOWDemoPrelimRest58_25ThirdAveExt6.2020_REVISED07142020.pdf PDF
S01 12FPC120Q0039 Amend1_Price Schedule_TermsConditionsClauseProvisions_REVISED_07.20.2020.pdf PDF
S01 12FPC120Q0039 Amend1 Att2-11CS426Topsoiling58_25ThirdAveExt_REVISED 7_14_2020.docx.pdf PDF
S01 12FPC120Q0039 Price Schedule_TermsConditionsClauseProvisions.pdf PDF
S01 12FPC120Q0039 Att4CPS342CritAreaPlantImpReq58_25DemoRest.pdf PDF
S01 12FPC120Q0039 Att2-9CS421 Excavation58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att2-5CS406SeedSprigMulching58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att3CPS342CritAreaPlant58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att5-225ThirdAveExtBoundarySurveyMap.pdf PDF
S01 12FPC120Q0039 Att2-12CS494ContrQualCont58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att2-1CS8MobDemo58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att9DavisBaconActWDCT20200010NewHavenCtyCT.pdf PDF
S01 12FPC120Q0039 Att2-3CS403StructureRemoval58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att2-4CS405PollutionControl58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att2-2CS1Clearing58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att7-2HazardBuildMatInvRpt58ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att2-11CS426Topsoiling58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att8QAP58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att7-1HazardBuildMatInvRpt25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att1 SOWDemoPrelimRest58_25ThirdAveExt6.2020.pdf PDF
S01 12FPC120Q0039 Att5-158ThirdAveExtBoundarySurveyMap.pdf PDF
S01 12FPC120Q0039 Att2-6CS409TrafficControl58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att6SEC22a133k3GrdWaterRemediationStds.pdf PDF
S01 12FPC120Q0039 Att2-8CS411 RemovalWater58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 Att2-7CS410WaterforConst58_25ThirdAveExt.pdf PDF
S01 12FPC120Q0039 SF 1442.pdf PDF
S01 12FPC120Q0039 Att2-10CS423Earthfill58_25ThirdAveExt.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12FPC120Q0039

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

NRCS-TX-TEMPLE

TEMPLE TX 76501

101 SOUTH MAIN ST.

USDA-NCRS-TEXAS STATE OFFICE

FPAC-HQ-12FPC1

WASHINGTON DC 20250

1400 INDEPENDENCE AVE SW, RM 6801-S

FPAC BUS CNTR-ACQ DIV-OPS BRANCH-SE

07/20/20200001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/19/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment adds the following REVISIONS, to the Price Schedule, Statement of Work, Construction Specifications 1 and 426, in additions, add the Questions and Answers (Q&A) from the Pre-Bid Teleconference, July 14, 2020, 3:00 pm Eastern and Site Visit Showing July

15, 2020, 10:00 am Eastern to include a list of attendees.

ATTACHMENT(S)

1. Add REVISED Price Schedule, dated July 20, 2020, Add Line Item 003, tree removal,

2. Add REVISED Statement of Word, dated July 14, 2020,

3. Add REVISED Construction Specification 1 - Clearing, dated July 16, 2020, Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12FPC120Q0039/0001

4. Add REVISED Construction Specification 426 -

Topsoiling, dated July 14, 2020

5. Add Questions and Answers (Q&A)

Q. In two of the documents (the Statement of Work and the 426 Specification for topsoil) it calls out needing a minimum of 6¿ topsoil, but in the

Practice Requirements for Critical Area Planting, it says it should be a minimum of 4¿. Which is it?

A: Let¿s go with a 4¿ minimum. Statement of work and specifications have been revised to reflect this correction.

Q: In the Haz-Mat Report for 58 Third Avenue

Extension, the amount of asbestos reported is summarized strangely. How much total asbestos is needing removal from this residence?

A: The report lists asbestos in a joint compound in 7 different locations, 3 locations where there is 3000 s.f. of asbestos containing joint compound, , 3 locations with 120 s.f. of asbestos containing flooring kitchen flooring materials, and 1 attic window for a total of 9360 sq. ft.

plus 1 window needing removal and abatement prior to demo. Tracking manifests will need to be submitted to the COR when this work is completed.

Q: What types of erosion control measures are anticipated on these sites?

A: All catch basins will need drain socks staked in place around them until the construction is over and the street is cleaned. All downgradient areas of the project sites will also need silt fence installed, which is to be removed once vegetation has established. Silt fences around the entire property boundary are not necessary.

In general, the property frontage at 25 Third

Avenue Extension, and the perimeter of the back yard edge near Old Field Creek on 58 Third Avenue extension will need silt fences.

Q: Is chain link fencing required around the entire perimeter of the properties?

A: According to the West Haven building and zoning department, fencing is required for any

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12FPC120Q0039/0001

holes that are left unattended. Therefore fencing will be required around any excavated basement holes or other trenches or pits left open during times when construction site is unattended.

Q: Can we hydroseed the seed mix?

A: Hydroseeding this seed is not recommended since the seed itself is very tiny. You will likely want to use a handheld grass seed spreader with a hand crank.

Q: Are the utilities to the residences turned off?

A: No. The gas and power is still on at both residences and the water is still on at 58 third avenue extension (we think). Doug Colter, City of West Haven Building Department and Kristin

Walker, NRCS COR, have agreed to work together to get these utilities disconnected within the next few weeks so the residences will be ready to go once a contract is awarded.

6. Clarifications and highlights made during the meeting:

--Contractor must have a class B (minimum) demolition License in order to qualify for this solicitation according to the City of West

Haven¿s regulations

--Contractor must have a current DUNS / Active

SAM registration in order to be considered for this solicitation.

--Danny Mandell introduced himself as the main point of contact for the contracting officer, Julie Simpson, and he will also be the point of contact for any issues with the contract itself.

--Noise ordinance in West Haven stipulates hours of noise generating activities must be limited to between the hours of 7am and 8pm.

--Work schedule is 5 days a week. To work on a

Saturday, the selected contractor must request permission to work on a Saturday in writing to the COR. It may be granted and it may be denied

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12FPC120Q0039/0001

depending on types of activities proposed and availability of inspectors

--Hard hats and work boots shall be worn on the site at all times. Safety signage must be displayed on the site as specified in the solicitation. A COR or Inspector may halt progress if there are safety violations and permission to commence work can only be granted by the Contracting Officer or their appointed representative.

--No hydrants will be available for water for dust control or other purposes during construction. Contractor will be responsible for securing their own source of water daily when needed.

--Be aware of topsoil testing requirements.

NOTE: Thickness of topsoil shall be a minimum of

4¿ and a corrected SOW and 426 Topsoil

Specification with this clarified have been given with this solicitation. Material MUST MEET specification 426 including passing laboratory test values for pollutant levels specified. This is a groundwater class B basin, which will determine pollutant mobility criteria, which could be the more stringent of the testing analyses. No topsoil will be brought on-site without receiving approval from the COR that it meets the specifications in this solicitation package.

--Be aware of tidal influence on groundwater.

Groundwater is shallow and can fill an empty basement hole if tides are not accounted for prior to removal of the basement walls.

--Time modifications need to be requested at least 5 days in advance prior to the expiration of the contract Period of Performance. A time extension may or may not be approved depending on the basis for justification.

--Cost modifications are strongly discouraged and will take a minimum of 14 days to review. A cost modification may or may not be approved depending on the basis for justification and whether or not funds can be made available. Note: cost modifications will only be applicable when the

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

5 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12FPC120Q0039/0001

work involves additional components or complexities that are above and beyond the expectations outlined in the original Scope of

Work.

--There may be monitoring of demolition and basement removal/filling activities by the Office of the State Archaeologist due to potential for

Indian artifacts or remains. If cultural resources are encountered, work is to cease immediately and direction will be given by the respective cultural resource authority.

--An Primary and Alternate safety officer is to be appointed for this site. A first aid kit is mandatory to be on-site and its location identified according to the solicitation guidance. A safety meeting is to be held at the beginning of each week prior to construction activities.

--Kristin Walker will serve as the project COR

(contracting officer¿s representative) and will be the eyes and ears on the project reporting back to the contracting officer if there are any issues encountered. A project inspector will also be assigned who will serve as the daily eyes and ears on the construction site. A combination of one or both may be on-site at any given time during construction activities.

--Payments must be submitted in the IPP.gov platform. Registration into this system early is highly encouraged. All payments and invoices shall be submitted here for review and approval.

The COR has 7 business days to approve or deny a request for payment. The CO has an additional 7 days to make final approval of the payment. It is advised that draft invoices be submitted to

Kristin Walker prior to submittal into the IPP platform to ensure concurrence of the billed amount ahead of time and streamline the payment process.

List of Attendees (Site Visit Showing) July 15, 2020, 58 Third Ave Ext. West Haven, CT

1. Thomas Catucci, Manager, Ludlow Associates, LLC,

2. Strati Patrakis, Estimator, Bestach.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

6 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12FPC120Q0039/0001

Contractor shall acknowledge this amendment in blocks 15a, 15b, and 15c and return one signed copy with your quote submission.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)