Text version
Solicitation 12FPC120Q0039 Attachment 2-6CS409TrafficControl25_58Third Ave Extensions
5. General and specific references All signs, signals, barricades, use of flaggers, and other traffic control and public safety devices shall conform to the general requirements set forth in the Manual of Uniform Traffic Control Devices (MUTCD) and the latest edition of Standard Highway Signs and Standard Alphabets for Highway Signs and/or OSHA Construction Industry Standards {29 CFR Part 1926}, Subpart G, Signs, Signals, and Barricades unless otherwise specified in section 7 of this specification.
6 .. Measurement and payment For items of work for which specific lump sum prices are established in the contract, payment for the work is made at the contract lump sum price. Payment will constitute full compensation for all flaggers, labor, materials, equipment, and all other items necessary and incidental to completion of the work.
Compensation for any item of work described in the contract, but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary.
7. Items of work and construction details
Contractor shall coordinate all traffic control requirements with local authorities.
Payment will be made by lump sum prices established within_contract and will not be made on a prorated basis as project progresses.
A. Appropriate signage and barricades for traffic control shall be installed and maintained, as needed, by the Contractor for the duration of construction.
B. Traffic control shall include vehicular and pedestrian traffic control. Pedestrian safety shall be addressed during all phases of construction. Closures of any walkways may be necessary and shall be enforced by the Contractor in cooperation with the City of West Haven.
C. The Contractor shall be responsible for controlling access to the site. No person shall be granted access to the site without proper PPE (Hardhats, closed toed shoes/workboots, safety vests strongly recommended).
NRCS 3/2018
CTEWPP-FPE
409-2
Solicitation 12FPC120Q0039 Attachment 2-6CS409TrafficControl25_58Third Ave Extensions