C04_12C0BA26Q0011 GA20260102.pdf
PDF 2 MB Posted
- Attached to
- USDA-ARS Tifton Roofing Remodel
- Solicitation number
- 12C0BA26Q0011
About this file
This is a General Decision (Wage Determination) document issued by the U.S. Department of Labor, Wage and Hour Division, establishing prevailing wage rates for construction work in Georgia counties of Tift under General Decision Number GA20260102, effective May 18, 2026.
The document establishes hourly wage rates and fringe benefits for multiple construction classifications required for building construction projects in the specified Georgia counties. Key classifications include boilermakers ($34.21 base rate, $23.92 fringe), electricians including alarm installation and low voltage wiring ($29.50 base, $14.88 fringe), power equipment operators for cranes of varying tonnage ($32.00-$34.00 base, $17.70 fringe), pipefitters with HVAC unit installation ($38.98 base, $17.01 fringe), sheet metal workers ($37.75 base, $17.95 fringe), and various other skilled trades including sprinkler fitters, plumbers, painters, operators, laborers, ironworkers, glaziers, and cement masons. Rates are identified by classification code with effective dates ranging from July 2024 through August 2025. The document includes rate identifiers indicating whether rates are union-negotiated, weighted union averages, survey-based, or state-adopted. It also references Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements for federal contractors, and provides instructions for wage determination appeals to the Department of Labor's Wage and Hour Division or Administrative Review Board.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C04_12C0BA26Q0011_Government Response UPDATED 9-25-2026.xlsx | XLSX spreadsheet | |
| C04_12C0BA26Q0011 Government Responses UPDATED 9-24-2026.xlsx | XLSX spreadsheet | |
| C04_12C0BA26Q0011_SF1442.pdf | ||
| C04_12C0BA26Q0011 Government Responses.xlsx | XLSX spreadsheet | |
| C04_12C0BA26Q0011 FINAL RFQ.pdf | ||
| C04_12C0BA26Q0011 Tifton Roffing SOW FINAL.pdf | ||
| C04_12C0BA26Q0011 FINAL RFQ.pdf | ||
| C04_Attachment 2 General Decision No. GA20260060 dated 5-18-2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .