STF WATER SYSTEM PLANS.pdf
PDF 2 MB Posted
- Attached to
- R5 Multi-Forest Critical Water System Federal contract opportunity
- Solicitation number
- 129JGP20R0007
About this file
This document package includes plans and specifications for a construction project on four recreational sites within Stanislaus National Forest. The project involves work at Lake Alpine Recreation Area, Marmot Day Use Area, Sourgrass Day Use Area, and Big Meadows Campground. Scope of work includes relocating a waterline, demolishing bathrooms and installing vault toilets, sealing water tanks, and constructing a well house. The solicitation for fixed-price bids is expected to be posted on March 25, 2020, with bids due approximately 10 days later as amended. Evaluation will prioritize offers from small businesses certified under NAICS code 237110 with average annual receipts under $39.5 million. The Forest Service Pacific Southwest Region will award a contract to perform the specified construction work across the four sites in Calaveras and Tuolumne counties of California.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 7.pdf | ||
| Amendment 6.pdf | ||
| Amendment 5.pdf | ||
| Amendment 4 with Attachments.pdf | ||
| PAL Fire Plan Aug 2012.pdf | ||
| STF Waterline Ph1 Spec.pdf | ||
| DB Wage Det.pdf | ||
| R5 Multi Forest Critcal Water Systtem Repair.pdf | ||
| Amendment 2 with attachments.pdf | ||
| Amendment 3.pdf | ||
| Amendment 1 R5 Multi Forest Critical Water System Repair.doc | DOC document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA
.. DEX MAP - N.T.S.
S.R. 4 to Arnold
USDA
United States Department of Agriculture Forest Service
(ROS) PACIFIC SOUTHWEST IREGION
STANISLAUS NATIONAL FORES'T
ALPINE A1ND CALAVERAS COUNTIES
CALIIFORNIA
STF Water System Improvements - Phase 1 s,, ~ ~ cape_Ho_rn _~ __ - __ _ i S.R. 4 to Ebbetts Pass
Boards Crossing
Cottage Springs
Ganns
Is;~ ©
B19 Meadow
Lake Alpine Bull Run Peak Q
Bea, Valley ,11
Whittakers A Dardanelles T
The Dardanelles Q
Nonh
The Dardanelles Q
West
Donnell Vista f
Peep g
VICINITY MAP
SCALE: N.T.S
MAP DATA: GOOGLE MAPS, DEC 2019
Index of Sheets Sheet No. Sheet Title
1 Title Sheet
2 Notes
3 Site 1 - Plan & Profile
4 Site 1 - Details
5 Site 2 - Plan & Notes
6 Site 3 - Plan & Notes
7 Site 4 - Plan & Notes
8 Site 4 - Foundation Plan
9 Site 4 - Well House Details
10 Site 4 - Well House Details
11 Site 4 - Framing Plan
12 Site 4 - Framing Plan
13 Site 4 - Framing Plan
14 Site 4 - Plumbing Plan
15 Site 4 - Electrical Plan
Know what's below.
Call !before you dig.
TRAVEL DIRECTIONS: Project sites are located off California State Route 4 in Calaveras and Alpine Counties.
See Site pages for detailed directions.
ff.EC.QMMENDED ~Y:
) 2..1111/ f
DATE
SHEET 1 OF '15
ABBREVIATIONS:
AB
AC
CMP
co
COR
CY
LF
SF
STA
SY
TYP
AGGREGATE ROAD BASE
ASPHALT CONCRETE
CORRUGATED METAL PIPE
CONTRACTING OFFICER
CONTRACTING OFFICERS
REPRESENTATIVE
CUBIC YARD
LINEAR FOOT
SQUARE FOOT
STATION
SQUARE YARD
TYPICAL
GENERAL NOTES:
WORK NOTES:
1. ALL FOREST SERVICE ROADS OR INFRASTRUCTURE DAMAGED BY CONTRACTOR DURING CONSTRUCTION SHALL BE REPAIRED BY
CONTRACTOR.
2. BORROW SOURCES, IF NEEDED, WILL BE DESIGNATED BY THE FOREST SERVICE DURING CONSTRUCTION.
3. WASTE AREAS WILL BE DESIGNATED BY THE FOREST SERVICE DURING CONSTRUCTION.
4. WATER SOURCES, IF NEEDED, SHALL BE DESIGNATED BY THE FOREST SERVICE DURING CONSTRUCTION.
5. UTILITIES: THERE ARE BURIED UTILITIES WITHIN THE PROJECT AREA. CONTACT 811 PRIOR TO DIGGING. DO NOT BEGIN GROUND
DISTURBING WORK UNTIL A MEETING IS HELD WITH THE FOREST SERVICE TO CONVEY THE LOCATION OF FOREST SERVICE UTILITIES
THAT NEED TO BE PROTECTED.
6. PROVIDE COPIES OF WEIGHT TICKETS FOR MATERIAL DELIVERED TO THE SITE FROM COMMERCIAL SOURCES. AGGREGATE SHALL BE OBTAINED FROM AN APPROVED SOURCE, CERTIFIED WEED FREE AND CERTIFIED TO CONTAIN NO MORE THAN 0.25% ASBESTOS TO BE IN COMPLIANCE WITH CALIFORNIA HEALTH AND SAFETY CODE SECTIONS 93105 AND 93106.
7. ANY DISTURBANCE (SUCH AS BORROW SITES AND STAGING AREAS) SHALL BE RESTORED.
1. THE WORK SHOWN ON THESE PLANS ARE FOR FOUR SITES ON THE CALAVERAS RANGER DISTRICT, STANISLAUS NATIONAL FOREST. THE FOUR SITES ARE:
A. SITE 1: REMOVE EXISTING BIKE PATH AND RELOCATE 4" WATERLINE UNDER BIKE PATH ALIGNMENT, RECONSTRUCT BIKE PATH IN EXISTING ALIGNMENT. ABANDON EXISTING
WATERLINE IN THE LAKE BED IN PLACE.
B. SITE 2: DEMOLISH EXISTING 4 UNIT FLUSH TOILET BATHROOM AND SEWER LIFT STATION, PLACE TWO UNIT PREFABRICATED VAULT TOILET IN EXISTING TOILET FOOTPRINT.
C. SITE 3: (OPTION ITEM) SEAL INTERIOR OF 10,000 GALLON WATER TANK.
D. SITE 4: CONSTRUCT WELL HOUSE AROUND EXISTING WELL, RELOCATE ELECTRICAL PANEL, WATER METER, SHUT OFF VALVES, ETC. PER PLAN, INSTALL FLOAT CONTROL PANEL IN
WELL HOUSE, PLACE WIRING IN EXISTING CONDUIT, INSTALL FLOAT SWITCHES IN 10,000 GALLON CONCRETE WATER TANK. (OPTION ITEM) SEAL INTERIOR OF 10,000 GALLON WATER
TANK.
2. WORK ON SITES 1, 3, AND 4 CANNOT BE PERFORMED BETWEEN MAY 22, 2020 AND SEPTEMBER 7,2020. WORK ON SITE 2 CAN BE PERFORMED DURING THIS TIME, HOWEVER, CONTRACTOR WILL FURNISH AND MAINTAIN TWO PORTABLE TOILETS FOR PUBLIC USE UNTIL SITE 2 WORK IS ACCEPTED BY THE FOREST SERVICE.
3. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE IN ACCORDANCE WITH THE CONTRACT TO THE C.O. FOR APPROVAL PRIOR TO THE START OF WORK.
4. REQUIRED WORK NOT SPECIFIED IN THE SCHEDULE OF ITEMS SHALL BE CONSIDERED SUBSIDIARY TO OTHER PAY ITEMS.
5. BEFORE ANY EXCAVATION ACTIVITIES BEGIN, THE CONTRACTOR SHALL CONTACT A SERVICE TO LOCATE ANY BURIED UTILITIES. USA= 1-800-642-2444, THE NATIONAL 811 NUMBER, OR
THE WEBSITE HTTP://WWW.USANORTH811 .ORG/
6. EQUIPMENT, FOR THIS PROJECT, IF DRIVEN ON STATE OR COUNTY ROADS SHALL BE CURRENTLY LICENSED.
7. ALL WORK SHALL BE IN COMPLIANCE WITH THE BEST MANAGEMENT PRACTICES DESCRIBED IN THE REGION 5 FOREST SERVICE SOIL AND WATER CONSERVATION HANDBOOK, DATED
DECEMBER 2011, AND THE NATIONAL BEST MANAGEMENT PRACTICES FOR WATER QUALITY MANAGEMENT ON NATIONAL FOREST SYSTEM LANDS, DATED APRIL 2012.
8. ALL DIMENSIONS ARE IN U.S. FEET.
9. CONTRACTOR IS RESPONSIBLE FOR ALL PROJECT AND SAFETY COMPLIANCE.
United States Department of Agriculture Forest Service
ROS
Pacific Southwest Region
PROJECT NAME
STF Water System Improvements - Phase 1
Stanislaus National Forest
Calveras District
DRAWING TITLE
Notes
DATE
12/17/2019
ARCHIVE NO.
DESIGNER DWG SHEET NO.
BJ
DRAWN G1
LD
CHECKED
TH
SHEET 2 OF 15
PROJECT NO.
LOCATION MAP - NTS
LAT: 38.480894°
LON: -119.998833°
ELEV: 7315 +/-
FG - BIKE PATH=
EG - BIKE PATH
PLACE 227.5 L.F 4" C900 WATERLINE,
MINIMUM COVER= 2', SEE DETAIL
WATERLINE, PLACE 22.5° ELBOW WITH
THRUST BLOCK, EL=5307.7+/-, LOCATION
IS APPROXIMATE, CONTRACTOR TO
POTHOLE AND VERIFY DEPTH AND
LOCATION PRIOR TO PLACING NEW PIPE
United States Department of Agriculture Forest Service
ROS
Pacific Southwest Region
PROJECT NAME
STF Water System Improvements - Phase 1
Stanislaus National Forest
Calaveras
DRAWING TITLE
SITE 1
PLAN & PROFILE
7320 -------____,._--------------~1---------+----------------+-----+-~---------~
1+00 1+25 1+50 1+75 2+00
1 +23.3 - CONNECT TO E 4" ACP
WATERLINE, PLACE 11 .25° ELBOW WITH
THRUST BLOCK, EL=5308.2+/-, LOCATION
IS APPROXIMATE, CONTRACTOR TO
POTHOLE AND VERIFY DEPTH AND
LOCATION PRIOR TO PLACING NEW PIPE
2+25 2+50 3+00 3+25 3+50
2+59.7 E 54" CMP CULVERT,
WATERLINE TO PASS UNDERNEATH,
MAINTAIN 8" CLEAR EDGE TO EDGE,
BACKFILL AND COMPACT TO 95%.
2+56.9 PLACE 1" DRAIN VALVE IN
CONCRETE RISER WITH H20 RATED
LID (JENSEN HTV10-3 OR EQ) TO FG,
PLACE 20 L.F. 1" GALVANIZED PIPE TO
DAYLIGHT.
WATERLINE PROFILE - SCALE: 1"=30'
DATE
12/17/19
ARCHIVE NO.
DESIGNER DWG SHEET NO.
BJ
DRAWN C1
LD
CHECKED
TH
SHEET 3 OF 15
ANCHOR
BOLT
45° BEND 22.5°
BEND
ANCHOR
~-----,------;. BOLT
PROFILE VIEW
THRUST
45° 22.5° 11.25°
11 .25°
BEND
PLAN VIEW
BLOCK BEARING AREA
2 SF
1 SF
1 SF
THRUST BLOCK DETAIL
AC BIKE PATH 2" AC/3"AB,
BACKFILL AB AT EDGE, 2: 1
SLOPE
~'L_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-__J_
PLACE 4" PIPE IN 3" BEDDING
SAND, COVER PIPE 3"
BEDDING SAND, PLACE 1 6"
MIN. NATIVE BACKFILL TO
GRADE, PLACE DETECTA-TAPE
12" ABOVE PIPE
TRENCH SECTION/
AC BIKE PATH DETAIL
United States Department of Agriculture Forest Service
ROS
Pacific Southwest Region
PROJECT NAME
STF Water System Improvements - Phase 1
Stanislaus National Forest
Calaveras
DRAWING TITLE
DATE
12/17/2019
ARCHIVE NO.
DESIGNER
BJ
DRAWN
LD
CHECKED
TH
PROJECT NO.
SITE 1
DETAILS
DWG SHEET NO.
C2
SHEET 4 OF 15
2 PUMP SEWER
LIFT STATION TO
BE REMOVED
a:
b:
C:
d:
e:
f :
g:
N ,, i \, SITE 2 r -, Contractor to demolish existing 290 SF CMU 4 stall bathroom and 2 pump sewer lift station. Work shall include capping underground electrical service in an electrical box 5' from building footprint, removing water meter/shut off and rerouting waterline to existing hydrant, and capping sewer pressure line.
Contractor to install 2 unit prefabricated vault toilet. The building shall:
Withstand 350 psf snow loading.
Have a minimum 7/12 roof pitch Design shall have Horizontal Lap Siding/River Rock exterior textured wall and Cedar Shake textured roof or approved equal.
Have a concrete prefabricated uniform vault with polyethylene vault liner insert, minimum volume of 1,000 gallon per toilet compartment, and a hinged vault cleanout lid able to be locked with a padlock.
All units to come with wastebaskets, chase, and shall include commercial grade lockable doorknobs all keyed the same (Schlage or equal).
Incorporate Sweet Smelling Technology (SST) into the design of the ventilation system.
Final installation includes removing rigging hardware, patching concrete, sealing joints, and completing all preparation necessary for the building to be open for public use.
Location of toilet to be in existing footprint and staked by the COR.
All demolition debris and spoils to be removed from National Forest Lands.
OT
(£) 290 SF CIIU BLOCK R£S1ROOl,I W/
2 PUMP SEWER UFT STATION
LOCATION MAP - NTS
LAT: 38.475173°
LON: -120.006296°
ELEV: 7345 +/-
United States Department of Agriculture Forest Service
ROS
Pacific Southwest Region
PROJECT NAME
STF Water System Improvements - Phase 1
Stanislaus National Forest
Calaveras
DRAWING TITLE
SITE2
PLAN & NOTES
DATE
12/17/2019
ARCHIVE NO.
DESIGNER DWG SHEET NO.
BJ
DRAWN C3
LD
CHECKED
TH
SHEET 5 OF 15
N \ 5 2 \ xsao2 r----.., \ o/1 I/
,/ 'V
Work Notes:
1. Seal water tank per specifications.
(£) 10,()(J() GALLON CONCRETE WAID? TANK
United States Department of Agriculture Forest Service
ROS
Pacific Southwest Region
PROJECT NAME
STF Water System Improvements - Phase 1
Stanislaus National Forest
Calaveras
DRAWING TITLE
SITE3
PLAN & NOTES
DATE
12/17/2019
ARCHIVE NO.
DESIGNER DWG SHEET NO.
BJ
DRAWN C4
LD
CHECKED
TH
SHEET 6 OF 15
(£) Ital. HOUSING (EXTERIOR)
(£) Ital. El.ECTRICAL
Work Notes:
1. Construct well house per following sheets and specifications.
2. Add float switch controls, wiring, and floats per plans and specifications.
3. Place 800 LF 3/4" electrical conduit for float control wiring per detail, this sheet.
4. Seal water tank per specifications.
(£) Ital. HOUSING {INTERIOR)
(£) 10,000 GALLON CONCRETE WAID? TNIK
MOUND TOP OF TRENCH
2" ABOVE (E) GRADE.
PLACE 3/ 4" CONDUIT IN 2"
BEDDING SAND, COVER
CONDUIT WITH 2" BEDDING
SAND, PLACE 16" MIN. NATIVE
BACKFILL TO GRADE, PLACE
DETECTA-TAPE 12" ABOVE
CONDUIT, COMPACT TO 95%
FLOAT CONTROL
CONDUIT DETAIL
APPROXIMATE ROUTE FOR FLOAT CONTROL
CONDUIT, CONTRACTOR TO PARALLEL (E)
SUPPLY WATERLINE AND REPAIR ANY
BREAKS IN WATERLINE DUE TO
CONSTRUCTION
.. .-.-: .. --.... --.. --- 0
Existing water tank.
Floats to be installed in tank.
Existing well.
Wellhouse to be constructed over well.
Electrical panel to be moved inside of well house.
125 250
Feet
United States Department of Agriculture Forest Service
ROS
Pacific Southwest Region
PROJECT NAME
STF Water System Improvements - Phase 1
Stanislaus National Forest
Calaveras
DRAWING TITLE
SITE4
PLAN & NOTES
DATE
12/17/2019
ARCHIVE NO.
DESIGNER DWG SHEET NO.
BJ
DRAWN cs
LD
CHECKED
TH
SHEET 7 OF 15
FOUNDATION NOTES
ft) ANCHOR BOLTS SHALL 8£ AST1I AJ07 ANO SHALL INCLUDE (4) CURING CONRETE: AS A MINIMUM ALL FORMS SHALL 8£ NUTS ANO 2"X2"XJf16• SQUARE PLATE WASHERS. ANCHOR BOLTS l.tFT IN PLACE 24 HOURS UNLESS APPROVED OTHERWISE.
TO 8£ 5Js·,x10· EMBEDDED 7-11~; SPACE 5'-o· o,,c .. MINIMUM ALL EXPOSED SURFACES SHALL 8£ COATED WITH NED TWO BO(TS PER SILL PIECE ANO bNt. BOLT WITHIN 12 OF CORNERS. CURE, KJC COMPLIANT, WAID? B4SE; MEMBRANE CURING
(J) RDNFORCING STm SHALL MEET THE REQUIREMENTS OF
ASTM 615 ANO SHALL 8£ A MINIMUM GIWJE 60. MINIMUM
OWJETER OF BENDS IN RDNFORCING STm SHALL 8£ SIX TIMES THE BAR OWJETER (/4'S=J: l5'si,K1'· SPLICE LENGTH SHALL 8£ A MINIMUM '()f JO SAA DIAM MID StJALJ_
8£ DONE IN ACCORDANCE WITH AC/ J18-95. REBAR EARTH/FORM
CLEARANCE SHALL 8£ J INCHES U.N.O.
(J) RN/SH: INTERIOR FLOOR SLABS SHALL H4VE A SMOOTH
sfm TROWEL RN/SH WITH ALL EXPOSED EDGES TOOLED.
EXPOSED VERTICAL CORNERS ANO HORIZONTAL JOINTS SHALL
8£ CHAMFERED ONE INCH. ALL CONCRETE SHALL 8£ FREE
OF HONEY COMBS, ROCK POCKETS ANO THE UK£
COMPOUND OR EQUAL
(5) COMPACTED BASE TO 8£ CLASS ':4• ROAD BASE COMPACTED
td 95% OF MSHTO T-180 C OR 0.
(6) UFER GROUND TO 8£ 20' OF /4 BARE COPPER WIRE EMBEDDED
IN CONCRETE ANO LACED AROUND REBAR. EXTEND ABOVE SLAB TO
PANEL ANO TERMINATE AT PANEL GROUND BUSS BAR.
(7) BOmJM OF FOOTINGS TO 8£ A MINIMUM OF 12 INCHES BELOW
RN/SH GIWJE AND/OR BELOW FROST UN£
r - - 10'-o"--=4 ,'--2' -6"
' 7 I'
2'-6" A
I
' I'
4• CONCRETE SLAB W//4'S
0 18• O.C. fACH WAY OVER
6• MIN. COMPACTED CLASS A
ROAD BASE {SEE FNO. NOTE 6).
10'-o"
UFER GROUND
(SEE FNO. NOTE 7)
' I'
- 1'-o• TYP. -
' ' I' "
PAH042 HOW DOW
fACH CORNER o 1s· o.c.
WAY •
United States Department of Agriculture Forest Service
ROS
Pacific Southwest Region
PROJECT NAME
STF Water System Improvements - Phase 1
Stanislaus National Forest
Calaveras
DRAWING TITLE
SITE4
FOUNDATION PLAN
DATE
12/17/2019
ARCHIVE NO.
DESIGNER DWG SHEET NO.
BJ
DRAWN C6
LD
CHECKED
TH
SHEET 8 OF 15
KEY NOTES
/A. PORTALS PLUS STNIOARO J'-o• X 2'-6• ROOF HATCH °'v GALVNIIZED MIO PRIMED TO PAINT OR EQUAL INSTALL
MIO RASH AS PER MANUFACTURER.
0 4/4 X 4• AZEK TRIMBOARO OVER I-FLASHING - TYP.
~ 4' AZEK CORNERBOARO - TYP.
0 4'XB' HARDI-PM/EL W/CELMR MILL RN/SH.
24• X 24' GALVNIIZED LOI.MRED VENT.
TRIM OUT AS NEEDED.
ASC KUP RIB OR EQUAL, 24 GAUGE, 16• WIDE: METAi..
ROOF W/OURATECH XL RN/SH OVER JOI ROOF FELT.
COLOR TO BE AS PER FOREST LANDSCAPE ARCHITECT.
INCLUDES MATCHING RAKE MIO TURNED DOWN RIDGE
FLASHING. INSTALL MIO CAULK NEOPRENE CLOSURE
STRIPS AT EAVES MIO RIDGE FLASHING. INSTALL MID
RASH ROOF AS PER MANUFACTURER.
--------,o~o·--------
PUMP HOUSE HEATER
MOUNT 12• AFF
WELL HEAD
4, CJ.O
CONTROL
PNIEL
E1.0
J'-o· X 6'-s: DBL 18 GAUGE, HONEY COMB CORE, METAi.. DOORS WITH 16 GAUGE FRAME, W/2 EACH
24• X24• SCREENED LOI.MRS; SCHLAG£ A250 ORBIT
LOCKSET MID 8160 DEADBOLT; J PR., 4 1/2• X 4 1/2:
STNILEY FBB179 BUTTS; PEMKO J15N SWEEP, S880
GASKET MIO 272A AJ..UMINUM THRESHOLD; IVES FB458
FLUSH BOLTS. ALL RN/SH TO BE 626.
<ft> 24•x16• J/4 PLYWOOD SHELF MOUNTED 40• AFF.
WITH SINGLE RECEPTACLE MOUNTED 48• AFF FOR
CHLORINE RATIO PUMP TO SET ON.
= 0
LAP SIDING MIO TRIM
~--+ 1• OVER FOUNDATION
• __ , SLOPE TO
ORAJN-TYP~ ;;:::,.._---------------------,~-----
C) rwo:PLAN
United States Department of Agriculture Forest Service
ROS
Pacific Southwest Region
PROJECT NAME
STF Water System Improvements - Phase 1
Stanislaus National Forest
Calaveras
DRAWING TITLE
SITE4
WELL HOUSE DETAILS
DATE
12/17/2019
ARCHIVE NO.
DESIGNER DWG SHEET NO.
BJ
DRAWN C7
LD
CHECKED
TH
SHEET 9 OF 15
I 2X12 FACL4 I
0---_ --i--...
0RIGHT ;LEVATION
II II
REAR E;;'1AT10tf:D
II II
United States Department of Agriculture Forest Service
ROS
Pacific Southwest Region
PROJECT NAME
STF Water System Improvements - Phase 1
Stanislaus National Forest
Calaveras
DRAWING TITLE
SITE4
WELL HOUSE DETAILS
DATE
12/17/2019
ARCHIVE NO.
DESIGNER DWG SHEET NO.
BJ
DRAWN cs
LD
CHECKED
TH
SHEET 10 OF 15
FRAMING NOTES USDA /;:REST SERv1;\
~ ~uts~
(1) LUMBER TO BE OF THE GRADE MID SPECIES SHOWN ON THE LUMBER iiillllli~TOFAG~I
SCHEDULE OR BETTER.
(2) PLYWOOD TO BE OF THE DESIGNATION MID/OR SPNI RATING SHOWN
United States Department of Agriculture
Forest Service
IN THE LUMBER SCHEDULE OR AS NOTED IN THE DRAWINGS. PLYWOOD
SHALL Mm U.S. PRODUCT STNIOARD PS 1-95, OS8 TO Mm PS 2-92. ROS NO PIECE OF ROOF PLYWOOD SHALL BE LESS TIWI 12 INCHES IN THE LEAST DIMENSION. EXPOSED SOFFITS SHALL MATCH SIDING. Pacific Southwest Region
PLYWOOD NA/UNG SHALL BE AS SHOWN IN THE LUMBER SCHEDULE.
(J) FRAIi/NG CONNECTORS MID HARDWARE TO BE AS NOTED IN SIMPSON
STRONG-TIE COMPANY CATALOG C-2006 OR EQUAL. NAILS MID BOLTS
TO BE AS PER THE MANUFACTURERS RECOMMENDATIONS AS SHOWN IN THE
PROJECT NAME
CATALOG. CONNECTORS MID NAILS IN CONTACT WITH P. T. SILLS TO BE HOT STF Water System DIPPED GALVNIIZED OR STAINLESS STEEL
( 4) NAILS FOR STRUCTURAL CONNECTIONS SHALL BE IN ACCORDANCE
Improvements - Phase 1
WITH UBC TABLE 23-11-8-1 UNLESS NOTED OTHERWISE. NAILS SHALL BE
COMMON WIRE NAILS. EXPOSED EXTERIOR NA/UNG SHALL BE HOT DIPPED
GALVNIIZED (ALSO SEE NOTE J ABOVE).
(5) TOP PLATES SHALL BE CONTINUOUS. RAFTERS SHALL BEAR ON TOP Stanislaus National
PLATES WITH STUDS DIRECTLY BELOW. Forest
(6) NOTCHING, cumNG MID BORING OF BEAMS, JOISTS, RAFTERS MID STUDS SHALL BE II/NIii/ZED WHEREVER POSSIBLE MID IS TO BE DONE IN
ACCORDANCE WITH UBC 232O.8.J, 2320.11.9, 2320.11.10 MID 2320.12.4.
Calaveras
LUMBER SCHEDULE
DRAWING TITLE
SITE4
ITEM SIZE SPECIES GRADE FINISH REMARKS FRAMING PLAN
MUD Sill 2X6 ff.RR /J OR BETTER ACQ PRESSURE TREATED AltPA STNIOARD C-2, IIOISTURE CONTENT < 19%
DATE
STUDS 4X6 0 12" O.C. D.RR STUD OR BETTER S4S RAFTERS TO BE CENTERED ON STUDS 12/17/2019
STUDS 2X6 0 16" o.c. D.RR STUD OR BETTER S4S SIDE WALLS
ARCHIVE NO.
RAFTERS 4X12 0 12" O.C. D.RR /1 S4S
TOP PLATES/MISC. 2X6 D.RR /1 S4S DESIGNER DWG SHEET NO.
FACL-1 2X12 CONT. /1 S4S
BJ
D.RR C9
/1
DRAWN
DOOR HEADER 6X6 D.RR S4S INSTALL CROWN SIDE UP
LD
EXTERIOR SHEATHING 1/2" X 8' HARDI-PM/El NAIL W//Bd O 6" O.C. EDGES MID 12" O.C. RELD
CHECKED
ROOF SHEATHING 1-1/8" X 8' PLY. 60/48 EXPOSURE 1 EXTERIOR NAIL W//10d O 6" O.C. EDGES MID 12" O.C. RELD TH
1/2" X 8' NAIL W//Bd O 6" O.C. EDGES MID 12" O.C. RELD SHEET 11 OF 15 INTERIOR PLYWOOD PLY. cox PROJECT NO.
I CIJOIID/NliTE ROUGH-IN /J/1/ENS/ONS """ OOOll l
MID WINDOW MANUFACTURERS.
AT All. 4 CORNERS. INSTALL
LSTA12 STIW'PING TOP
Pl.ATES TOGETHER.
2X6 0 1
•• • : •· ••• I
/j
FRNE FOR
J-0 X 6-8
DOOR
.----~A
4X12 IWTERS ...--=;-~-~--• ~·ac r-t--+--.H2 Tl£ TYP. All. IWTERS
JACK STUD
KING STUD
~STUD
1.-..&.- HARDI-PNIB.. SIDING
...___~A
4X6 STUDS o 12· o.c-+-1--'-'--'
_ mu _DEPTH_ BL<JCK!.NG ~ _
K K K K K K K
0 A - A
NTS
United States Department of Agriculture Forest Service
ROS
Pacific Southwest Region
PROJECT NAME
STF Water System Improvements - Phase 1
Stanislaus National Forest
Calaveras
DRAWING TITLE
SITE4
FRAMING PLAN
DATE
12/17/2019
ARCHIVE NO.
DESIGNER
BJ
DRAWN
LD
CHECKED
TH
DWG SHEET NO.
C10
+------------l SHEET 12 OF 15
TYP.
2x12 FACl-1 TYP. ,,,,..-2x BLOCKING
II
II
II [>LSO TYP. ON 2X RJLL DEPTH Bl.!-_ ---
II
II 4X12 IWTERS 012"0.C.
II
II
- JB"XJO• ROOF
II ~HATCH OPENING~
II
II '+IUJ511 TYP,../
-12·-
II
II
II
II
II
II
II
II
II
II
© TYP. ,!;ORNER
llfTAL ROOF----...
JO LB. FELT PN'ER
ROOF SHEATHING
IWTERS--
1• ROOF OVERHANG--"1111~
2X12 f,01
12• NIGi.ED EA~
RASH/NG WITH 112•
DRIP UP EXTENdlNG
FULL WIDTH OF F~
EXTEND ROOFING FELT
DOWN BEHIND F~
IMDIPl.)NK gUIN(.,_., a---4'/2• AC PL.>1tfJOO
4X6 STUDS
-----~. 12· o.c.
United States Department of Agriculture Forest Service
ROS
Pacific Southwest Region
PROJECT NAME
STF Water System Improvements - Phase 1
Stanislaus National Forest
Calaveras
DRAWING TITLE
SITE4
FRAMING PLAN
DATE
12/17/2019
ARCHIVE NO.
DESIGNER DWG SHEET NO.
BJ
DRAWN C11
LD
CHECKED
TH
SHEET 13 OF 15
1 2• SAMPLING TAP AND VM..VE.
TOP VIEW
WALL
HEATER
SIDE VIEW
SIDE VIEW
N01ES:
1. SAMPLE TAP TO BE INSTALLED BETWEEN WELL
AND WATER METER
2. MAINTAIN MINIMUM SPAQNG BEFORE AND AFTER
METER AS SHOWN.
3. INSTALL IN.ECllON PORT FOR F\JlURE
CHOLORINA 110N
4. INSTALL PRESSURE GAUGE AS SHOWN.
S. INSTALL 1' POSITIVE DISPLACEMENT YATER
METER, RATED FtR USE AT ~30 GPM, ANALOG
STYLE 'JITH MECHANICAL DIGITAL READOUT
<IOI-ELECTRICAL>
6. MAINTAIN CLEARANCE F1U4 VALL I-EATER AS
stlNN.
7. SECURE PIPING AND WATER METER TO WALL
© PLUMBING DETAIL
N1S
United States Department of Agriculture Forest Service
ROS
Pacific Southwest Region
PROJECT NAME
STF Water System Improvements - Phase 1
Stanislaus National Forest
Calaveras
DRAWING TITLE
SITE4
PLUMBING PLAN
DATE
12/17/2019
ARCHIVE NO.
DESIGNER DWG SHEET NO.
BJ
DRAWN C12
LD
CHECKED
TH
SHEET 14 OF 15
(E) SERVICE MAIN BREAKER
II II II
~- EQUIPMENT GROUND BUSS.
CONNECT TO COLD WATER
PIPE AND GROUND
PANEl. BREAKER 100 AMP f4 CU ELEClRICAL PANEL
POWER ONE-LINE SCHEMATIC
1• RSC ON TANK ATTACH\
TO TANK Yt11H UNIS'IRUIT AND
UNIVERSAL PIPE CLAMPS. SEAL
BOLT PENE1RA110NS WATER TIGHT.
SET NEW FLOAT SYt1TCH __
TO CO REQUIREMENTS.
• ANIXlER• TELEPHONE WIRE c!c CABLE FILLED CORE DUCT c!c IN CONDUIT GOPHER
RESISTANT 3 PAIRS WIRING
BURY NEXT TO WATER LINE.
.. . ·------------..... -----------.--........... .. ~•: • ::. :,•i ••· 'J ~ ~ i ~ ._ .. ._ I •• ...... ~~• : :,. -.. •• • _.: •: :• ;.:.: .. •.° ~ ♦- •: • •~• • •· • .... • ..
WATER TANK DETAIL
COMPONENT LAY OUT
NEW STARTER. ~
TYPE "FRN• FUSES SIZE TO MOTOR. --...._
lHERMAL UNl1S SIZE TO MOTOR
L1
M
L _ __.
• ANIXlER• TELEPHONE WIRE c!c CABLE FILLED CORE DUCT c!c IN CONDUIT GOPHER
RESISTANT 3 PAIRS WIRING
BURY EXT TO WATER LINE.
....___ INSTALL NEW FIBERUlE GRADE LE\JEL BOX. SPLICE lB.EPHONE CABLE TO f16 MlW Yt1RE.
L£GENP
CR1: WARRICK LONG
DISTANCE CONlROL RELAY
FS: FLOAT SWITCH
NEW SUBMERSIBLE WELL PUMP
CONTROL SCHEMATIC
United States Department of Agriculture Forest Service
ROS
Pacific Southwest Region
PROJECT NAME
STF Water System Improvements - Phase 1
Stanislaus National Forest
Calaveras
DRAWING TITLE
SITE4
ELECTRICAL PLAN
DATE
12/17/2019
ARCHIVE NO.
DESIGNER DWG SHEET NO.
BJ
DRAWN C13
LD
CHECKED
TH
SHEET 15 OF 15
File details come from the government source that posted it. Updated .