Amendment 4 with Attachments.pdf
PDF 592 KB Posted
- Attached to
- R5 Multi-Forest Critical Water System Federal contract opportunity
- Solicitation number
- 129JGP20R0007
About this file
This document provides details for a firm fixed price construction contract opportunity with the USDA Forest Service. The solicitation package will be issued on March 25, 2020 and seeks to award a contract within 10 days of the response due date for construction work at four recreational sites located in California. Work includes relocating a waterline, demolishing and replacing bathroom facilities, sealing water tanks, and constructing a well house with associated electrical and control work. The response due date and possible amendments will be specified in the solicitation package. The opportunity is set aside for total small businesses with average annual receipts of no more than $39.5 million. Only offers from firms certified as both total small businesses and meeting the size standard will be considered.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 7.pdf | ||
| Amendment 6.pdf | ||
| Amendment 5.pdf | ||
| R5 Multi Forest Critcal Water Systtem Repair.pdf | ||
| PAL Fire Plan Aug 2012.pdf | ||
| STF Waterline Ph1 Spec.pdf | ||
| DB Wage Det.pdf | ||
| STF WATER SYSTEM PLANS.pdf | ||
| Amendment 2 with attachments.pdf | ||
| Amendment 3.pdf | ||
| Amendment 1 R5 Multi Forest Critical Water System Repair.doc | DOC document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
4 04/22/2020
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service Central California Acquisition Service Area Tahoe National Forest 631 Coyote Street Nevada City, CA 95959
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
129JGP20R0007
9B. DATED (SEE ITEM 11)
02/25/2020
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED
IN ITEM 14. (TO BE FILLED OUT BY THE CONTRACTING OFFICER)
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Amendment 4 responds to 3rd RFI.
See Attachment 1.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
OLAINE MARTINEZ
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
04/22/2020 (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
REQUEST FOR INFORMATION (RFI) FORM
RFI responses will be responded to as necessary in amendment format which will be posted to the solicitation via beta.SAM.
Telephone requests for information will not be accepted or returned.
NOTE: ALL PRE-PROPOSAL INQUIRIES SHALL BE SUBMITTED VIA EMAIL TO
tracy.martinez@usda.gov BY AN EDITABLE USE OF THIS FORM. Please identify, in numerical sequence, each set of inquiries that you send.
Question(s) is/are regarding the solicitation, evaluation factors [ ] Question(s) is/are regarding the statement of work, technical data [X ]
RFI #16 – Site 4, Plan sheet C13, Are they any specific electrical requirements for the controller, protection box, and starter unit to be installed?
No, all work will comply with Specification 16110 – Building Electrical
RFI #17 – Site 4, Plan sheet C13, “Contol Schematic”, Please confirm if the existing well pump is to be replaced by the contractor. If the existing well pump is to remain, can you provide the existing well pump specs?
Existing pump will not be replaced. We are unable to get access to the current pump data at this time.
RFI #18- Site 4, Plan sheet C13, “Control Schematic”, Please confirm that there are NO existing floats/ controls, and that contractor will be providing all new items.
There are no existing controls or floats. When the waterline was constructed an empty 1” electrical conduit was buried between the well and the tank, but we are unable to determine if it is usable.
RFI #19- Site 4, spec 13130, section 1.1, Are they any specifications regarding the interior light fixture required, and the exterior LED light with dusk/dawn timer?
No, all work will comply with Specification 16110 – Building Electrical
RFI #20- Site 4, Plan sheet C7, Floor plan, Please confirm that all existing electrical supply panels, breakers, etc are to be relocated inside of new building and nothing on the exterior.
Main panel will be inside the new well house. A service disconnect will need to be placed on the exterior.
RFI #21- Site 4, General, Please confirm what size electrical services is existing at the site. (amps, volts, phase).
We are unable to get access to the current panel data at this time. The following is a picture of the panel and smartmeter.
(Add more RFI #’s as needed)
| Amendment 4 with Attachments |
| Amendment 4 |
| Amendment 4 with Attachments.pdf |
| Revised RFI set 003 R5 Critical Water System Repair - Response 04-13-20 (003) |
| REQUEST FOR INFORMATION (RFI) FORM |
File details come from the government source that posted it. Updated .