This solicitation package provides details for a firm fixed price construction contract to perform water system improvements at four recreational sites on the Stanislaus National Forest. The projects include relocating a waterline, reconstructing a bike path, demolishing an existing bathroom and installing a prefabricated vault toilet, sealing two water tanks, constructing a well house, and installing electrical and control systems. Responses are due on an unspecified date in March 2020 as stated in the forthcoming solicitation, with award expected within 10 days thereafter. The contract is set aside for total small businesses with average annual receipts not exceeding $39.5 million. The Forest Service seeks responses demonstrating experience with utility installation, paving, prefabricated structure installation, simple construction, and water tank sealing.

View the file

Other files for this federal contract opportunity

Other files attached to R5 Multi-Forest Critical Water System, newest first.
File Type Posted
Amendment 7.pdf PDF
Amendment 5.pdf PDF
Amendment 4 with Attachments.pdf PDF
STF Waterline Ph1 Spec.pdf PDF
DB Wage Det.pdf PDF
STF WATER SYSTEM PLANS.pdf PDF
PAL Fire Plan Aug 2012.pdf PDF
R5 Multi Forest Critcal Water Systtem Repair.pdf PDF
Amendment 2 with attachments.pdf PDF
Amendment 3.pdf PDF
Amendment 1 R5 Multi Forest Critical Water System Repair.doc DOC document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6 05/19/2020

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA Forest Service Central California Acquisition Service Area Tahoe National Forest 631 Coyote Street Nevada City, CA 95959

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

129JGP20R0007

9B. DATED (SEE ITEM 11)

02/25/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED

IN ITEM 14. (TO BE FILLED OUT BY THE CONTRACTING OFFICER)

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Amendment 6 provides Site visit attendees and comments on project. Any additional question’s post Site visit will be accepted until May 21st, 12:00 pm pst. No further questions will be accepted. Please see previous amendments for RFI responses.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

OLAINE MARTINEZ

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

05/19/2020 (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Waterline Improvement Pre-Bid Meeting

Lake Alpine Recreation Area, Big Meadow CG, Calaveras Ranger District, Stanislaus National Forest

Thursday, May 14, 2020, 10 am

ATTENDEES

Tim Hughes USFS timothy.hughes@usda.gov 209-288-6329

Jarrod McCoy KW Emerson jarrod@kwemerson.com 209-286-9010

Cole Lopez MVC Enterprises Inc cole@mvc-inc.com 661-644-6846

David Sanders J4 Strategic j4strategic@gmail.com 209-256-4854

Group met at Site 1 at 10:00. Information provided was:

1. This is a picture of the repair to the crossing under the lake that shows how far out the line is from the existing pathway. It is the best information available on where the line might leave and reconnect to the bike path.

mailto:timothy.hughes@usda.gov mailto:jarrod@kwemerson.com mailto:cole@mvc-inc.com mailto:j4strategic@gmail.com

Site 2: The Forest Service is looking at an alternative installation location for the new bathroom between the parking lot and amphitheater. If approved, revised plans will be issued next week.

This does not change the demolition scope of work at site 2 but potentially provides an easier location for a crane to access.

Site 2: The USFS does not have a preferred vendor for the pre-fabricated vault toilet. CXT, Boom Concrete, and Jensen Precast manufacture units that meet the USFS Specifications.

Site 4: Existing empty electrical conduit can be used for float wiring if it is still intact all the way between the well and water tank. Repairs can be made on that line instead of placing new conduit. Assume it is too compromised and bid trenching for new conduit per plans.

Site 4: An abandoned pipe was observed rising up inside the water tank. If it is not in use, it can be removed for the optional tank sealing bid item

General. Evaluations will be based on submitting adequate responses to all required items in the solicitation. Past performance on utility line placement, paving, installation of prefabricated buildings, construction of simple structures, and water tank sealing should be indicated.