This Performance Work Statement (PWS) details hazardous material sanitization and disposal services for five military containers at Fort Liberty, NC. The U.S. Army's 127th QM Water Purification Company requires a contractor to safely remove, contain, transport, and dispose of approximately 2,000 lbs of hazardous and non-hazardous water purification chemicals from two Tricon containers (8'W x 6'L x 8'H) and three temperature-controlled units (10'W x 10'L x 8'6"H). The contractor must provide all necessary personnel, equipment, and materials to perform the sanitization, including personal protective equipment, disposal containers, transportation vehicles, and containment mats. The work is expected to take approximately four weeks, with disposal to occur at designated facilities in Goldsboro, NC, and El Dorado, AR, in compliance with environmental regulations and applicable Army publications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Military Container (QTY: 5) Hazardous Material Sanitization and Disposal

Part 1

General Information

1. GENERAL: This is a non-personal services contract to provide hazardous materials clear out, cleanup, transport and disposal. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the

Government. The Contractor, in turn, shall be accountable to the Government for contractor or subcontractor personnel.

1.1. Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform hazardous materials clear out, cleanup, and disposal as defined in this Performance Work Statement (PWS), except for those items specified as government furnished property and services. The Contractor shall perform in accordance with (IAW) the terms and conditions of the contract and consistently with the established standards in this PWS and contract.

1.2. Background: The requirement for the services originated from water purification chemicals of the U.S Army unit, 127th QM Water Purification Company, having been stored in military containers that incidentally combined. The combining of the chemicals occurred due to fluctuating temperatures and the containers being disturbed and shifted as they were moved using material handling equipment (MHE).

1.3. Objectives: The basic service objective includes the following:

1.3.1. Provide safe and proper removal of all hazardous and non-hazardous materials from all five containers on-site. The chemical will be appropriately transported and disposed of.

1.3.2. Provide sanitization of the inside and surrounding exterior of all five containers, to include the ground beneath the containers.

1.3.3 Provide transportation to haul off and dispose of the five containers. The containers are deemed unserviceable for continued military operations due to the extensive corrosive effects from the water purification chemicals.

1.3.4 Provide all necessary equipment and materials to properly perform safe collection and disposal of all hazardous materials and the military containers. MHE does not need to be provided by the service provider due to MHE on-site from the customer unit having it available.

1.4. Scope: Service provider will safely remove all hazardous and non-hazardous contents from the inside of the five military containers. These chemicals will be contained and disposed of off-site of the Fort Liberty, NC due to the Installation having insufficient environmental services available. The service provider will dispose of the five unserviceable military containers from the motor pool area. Services include removal and containment of hazardous material stored inside the five military containers, sanitization of the inside and surrounding area of the container, and to dispose of the five military containers off-site. The Contractor shall accomplish the safe and proper removal of all hazardous and non-hazardous material contents and five containers from the motor pool site in accordance with all applicable environmental regulations and laws.

Military container sizes (2 dry and 3 temperatures controlled):

2 x Tricons: 8’W x 6’L x 8’H.

3 x Temperature Controlled Units: 10’W x 10’L x 8’6” H.

Hazardous and Non-hazardous contents: approximate total 2,000 lbs. See Technical Exhibit X for

Materiel Safety Data Sheets (MSDS) for known contents. Contractor should be prepared for contents that do not have MSDS.

1.5. Period of Performance: The services are expected to have a period of approximately four weeks upon receipt of contract. Contractor shall propose a timeline schedule with their submission.

1.6. General Information

1.6.1. Quality Control: Quality Control is the responsibility of the Contractor. The Contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1

Contractor Inspection Requirements).

1.6.1.1. Quality Assurance: The COR will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the COR must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). When an observation indicates defective performance, the COR will require the Contractor or designated on-site representative to initial the observation to acknowledge the defective performance. The acknowledgement of the observation does not necessarily constitute Contractor concurrence with the observation, only that the Contractor has been made aware of the defective performance.

1.6.2. Recognized Federal Holidays: The Contractor shall not be required to perform services on recognized federal holidays. The recognized federal holidays include, but not limited to:

New Year’s Day Labor Day

Martin Luther King Jr.’s Birthday Columbus Day

Washington’s Day Veteran’s Day

Memorial Day Thanksgiving Day

Independence Day Christmas Day

Juneteenth

1.6.2.1. When a holiday occurs on a Saturday, Federal employees are normally granted the previous Friday as the holiday observance. When a holiday occurs on a Sunday, Federal employees are normally granted the following Monday as the holiday. The contractor shall work on the days the Government is scheduled to work.

1.6.2.2. When an unforeseen installation closure occurs on a regularly scheduled day of work, the

Contractor will have the following options:

1.6.3. Hours of Operation: The Contractor shall be responsible for providing services, between the hours of 9:00 AM – 4:30 PM (EST) Monday through Friday, except federal holidays or when the government facility is closed due to local or national emergencies, administrative closings or similar government directed facility closings. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the government facility is not closed for the above reasons. When hiring personnel, the

Contractor shall keep in mind that the stability and continuity of the workforce are essential to successful performance under this contract. No overtime (OT) or compensatory time (CT) is authorized. Contractor personnel shall not exceed a 40-hour work week; flexible work schedule may be considered.

1.6.4. Place of Performance: The work to be performed under this contract shall be accomplished at Fort Liberty, NC.

1.6.5. Special Qualifications.

1.6.5.1. The Contractor shall be responsible for ensuring all personnel performing work under this contract possess and maintain current certifications as indicated in PWS during the execution of this contract.

1.6.5.2. Contractor personnel performing work under this contract shall be able to read, write, speak, and understand the English language to effectively carry out all contract requirements.

They shall have a command of both the written and spoken English language to properly clearly, and effectively communicate in person or via electronic devices (telephone or Email) with co-workers, customers, and the general public.

1.6.5.3. Contractor personnel performing work under this contract shall be U.S. citizens unless the provisions of Army Regulation 25-2, Information Assurance have been fully completed and approval has been granted by the Government for the non-U.S. citizen to perform the required support.

1.6.5.4. Contractor shall be responsible for ensuring all personnel performing work under this contract possess and maintain current applicable professional certifications during the execution of this contract.

1.6.5.5. Access and General Protection/Security Policy and Procedures: All Contractor personnel performing work under this contract shall comply with applicable installation, facility and area commander installation/facility access, local security policies and security procedures provided by the Security Manager Government representative. Contractor personnel shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services or

Security Office. Contractor personnel shall comply with all personal identity verification requirements as directed by Department of Defense (DoD), HQ Department of Army (DA) or local policies. Sponsoring organizations, activities, and persons will be responsible for monitoring contractor access by submitting a completed and approved DES Form 118 to the

Installation All American VCC, detailing the contracted services to be performed, location of services, and duration of the contract. Contractors requesting access for less than one year may receive an AIE visitor card on a case by case basis, or a temporary vehicle pass for 90 days.

Contractor cards will be issued for periods of one to three years depending on the terms of their contract. AIE card expirations may be updated to reflect a new contract period by submitting an approved DES Form 118 to the All American VCC. Renewed short term passes must be re-processed at the All American VCC. In addition to the changes otherwise authorized by this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor and subcontractor security matters or processes.

1.6.6. Other Qualifications: Contractor shall be qualified to transport Hazmat as required per this

PWS.

1.6.7. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The post award conference may be utilized to ensure contractor understands the requirements. At these meetings the KO and

COR will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.8. Contracting Officer Representative (COR): The COR will be identified by separate letter of appointment. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: Assures that the

Contractor performs the technical requirements of the contract; performs inspections necessary in connection with contract performance; maintains written and oral communications with the

Contractor concerning technical aspects of the contract; monitors Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinates availability of Materiel

Handling Equipment, and provides site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.

1.6.9. Contractor Personnel Appearance and Performance: It is essential that all Contractor personnel meet the highest standards of professionalism and personal integrity. The Contractor shall ensure their personnel do not perform work under the influence of alcohol, illegal prescribed drugs or any other incapacitating agents.

1.6.10. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate

Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-

05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at

OCONUS locations, in accordance with status of forces agreements and other theater regulations.

1.6.11. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity

ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 calendar days of contract award and within ten calendar days of new employees commencing performance with the results reported to the COR NLT 10 calendar days after contract award.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and/or terminate contracts, and to make related determinations and findings on behalf of the

Government. Note: The only individual who can legally bind the Government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.

Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor, as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. CONTRACTOR PERSONNEL. Contractor and subcontractor employees performing working under this contract.

2.1.5. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement (PWS).

2.1.6. DELIVERABLE. Anything that can be physically delivered, but may include non-physical things, such as meeting minutes or reports.

2.2. ACRONYMS:

AFARS Army Federal Acquisition Regulation Supplement

AR Army Regulation

CCE Contracting Center of Excellence

CFR Code of Federal Regulations

CMDF Controlled Material Destruction Facility

CONUS Continental United States (excludes Alaska and Hawaii)

COR Contracting Officer Representative

COTS Commercial-Off-the-Shelf

DA Department of the Army

DD250 Department of Defense Form 250 (Receiving Report)

DD254 Department of Defense Form 254

DD1466 Building Pass

DFARS Defense Federal Acquisition Regulation Supplement

DMDC Defense Manpower Data Center

DOD Department of Defense

FAR Federal Acquisition Regulation

HIPAA Health Insurance Portability and Accountability Act of 1996

KO Contracting Officer

OCI Organizational Conflict of Interest

OCONUS Outside Continental United States (includes Alaska and Hawaii)

ODC Other Direct Costs

PIPO Phase-In/Phase- Out

POC Point of Contact

PRS Performance Requirements Summary

PWS Performance Work Statement

QA Quality Assurance

QAP Quality Assurance Program

QASP Quality Assurance Surveillance Plan

QC Quality Control

QCP Quality Control Plan

TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: The Government will provide access to the contractors for the motorpool space where the services are requested to be fulfilled. The Government will provide on-site forklift with operator capabilities on-site in order to move the corroded containers onto the contractor’s mobile platform in order to transport and properly dispose of the containers off-site. The Government forklift will be provided to lift or move the containers as required.

3.2. Facilities: N/A

3.3. Utilities: The Government will provide running water faucet, if one is available at the motorpool site and for the contractors to have full access to the bathrooms available on-site. The

Contractor shall instruct all employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.4. Equipment: The Government will provide ATLAS 10K or Rough Terrain Cargo Handler

(RTCH) with an operator, if required at motor pool only. The MHE will only be operated by licensed military servicemembers that belong to the unit that owns the equipment.

3.5. Materials: The Government will provide no materials in order to fully execute the requested hazardous cleanup services.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 3 of this PWS.

4.2. Materials: The Contractor shall provide explosive, biological, radiological, cylinders, mercury waste materials, and containers large than five gallons in order to meet the requirements under this PWS that must be in compliance with all applicable environmental laws and regulations.

4.3. Equipment: The Contractor shall provide hazardous materials handling Personal Protective

Equipment (PPE), Hazardous Material (HAZMAT) disposal containers, vehicles to transport hazardous, non-hazardous material and unserviceable military containers off-site, and containment mats and sumps to collect all runoff from sanitization efforts necessary to meet the requirements under this PWS.

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1. Basic Services. The Contractor shall provide services for:

5.1.1. Movement onto site of labor, equipment, and material

5.1.2. Disposal of gathered hazardous materials.

5.2. Contractors will properly sanitize, contain, collect, transport, and dispose of hazardous and non-hazardous materials that are stored within five separate military containers to include the five military containers. The gathered HAZMAT will be disposed of off-site according to the regulations.

5.2.1. Movement of labor force, equipment, and materials onto site;

5.2.1.1. Contractors will have permitted entry onto installation and into area where services are required. Required equipment and materials will accompany contractors.

5.2.2. Contractors will collect, contain, and remove hazardous materials from site and deliver all

HAZMAT to disposal site.

5.2.2.1. Contractors will coordinate with the COR to coordinate forklift capabilities in order to move corroded containers onto mobile platform that will deliver all five to a disposal site.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS):

6.1. The Contractor shall abide by all applicable regulations, publications, manuals, and local policies and procedures.

AR 25-2 Information Assurance

AR 530-1 Operations Security (OPSEC)

HAZMAT handling publications – certification, transportation permit etc

PART 7

Technical Exhibits

Technical Exhibit 1: Example or Suggested Hazardous Waste Turn in Locations

- Container disposal facility is located at Foss Recycling (address: 801 N John St, Goldsboro, NC 27530). Contractor must coordinate with facility for disposal.

Alternate container disposal location is authorized.

- The hazardous contents disposal (“labpack”): incinerator located in El Dorado, AR incinerator (address: 309 American Rd, El Dorado, AR 71730). Alternate location is authorized.

Technical Exhibit 2: Pictures of Containers

Technical Exhibit 3: Material Safety Data Sheet (MSDS)