Task Order Two.pdf
PDF 331 KB Posted
- Solicitation number
- 127K1120R0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised page 39.pdf | ||
| 521-2.726_INSP_200324 (002).pdf | ||
| Task Order One (Road 902-2.7 Plans).pdf | ||
| Task Order Two (Road K53E-1.0 Plans).pdf | ||
| DBWD LA20200051.pdf | ||
| Task Order One.pdf | ||
| Exhibit A.pdf | ||
| Performance Relevancy Questionaire.pdf | ||
| Task Order Three.pdf | ||
| DBWD LA20200015.pdf | ||
| Task Order Five.pdf | ||
| Task Order Four.pdf | ||
| Solicitation 127K1120R0007.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Order #2 – Statement of Work
OVERVIEW
The Kisatchie National Forest, Kisatchie Ranger District, has a requirement to replace existing culvert(s) with a precast concrete box culvert.
PROJECT LOCATION
The project is located on the Kisatchie Ranger District in Natchitoches Parish, Louisiana on NFSR K53E at milepost 1.0. The project is approximately 50 miles west of Alexandria, Louisiana. Latitude 31.409799, longitude 93.063479.
PRICE RANGE
The Government estimated range is between $250,000 and $500,000. Payment and performance bonds are required.
AGAR 452.211-72 Statement of Work/Specifications. (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to replace this culvert per the construction plans. (Note: 85% plans provided for developing proposal; 100% plans to be provided prior to construction.)
(End of Clause)
AGAR 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this contract.
(End of Clause)
ITEM NO. ITEM DESCRIPTION METHOD UNIT QTY PRICE TOTAL
15101 MOBILIZATION
LUMP
SUM
15201
CONSTRUCTION SURVEY AND
STAKING, METHOD 2, CLASS B
LUMP
SUM
15401 CONTRACTOR TESTING
LUMP
SUM
15713
SOIL EROSION AND POLLUTION
CONTROL
LUMP
SUM
20302
REMOVAL OF EXISTING CULVERTS,
METHOD A
CQ EACH 1
20801 STRUCTURAL EXCAVATION CQ
CUBIC
YARD
20804 CULVERT BEDDING MATERIAL CQ
CUBIC
YARD
20809 BACKFILL
LUMP
SUM
25102 PLACED RIPRAP, CLASS 2 CQ TONS 70
30102
AGGREGATE SURFACING, COARSE
GRADING, METHOD 1
CQ TONS 130
55218A
PRECAST CONCRETE MEMBER, BOX
CULVERT
CQ
LINEAR
FOOT
62504 SEEDING, DRY METHOD
LUMP
SUM
SCHEDULE OF ITEMS: K35E-1.0 BOX CULVERT
TOTAL
| Statement of Work.pdf |
| AGAR 452.211-72 Statement of Work/Specifications. (FEB 1988) |
| AGAR 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988) |
Schedule of Items.pdf
File details come from the government source that posted it. Updated .