Task Order Two.pdf

PDF 331 KB Posted

Attached to
Kisatchie National Forest Road and Facility Construction
Solicitation number
127K1120R0007
Issued by

View the file

Other files

File Type Posted
Revised page 39.pdf PDF
521-2.726_INSP_200324 (002).pdf PDF
Task Order One (Road 902-2.7 Plans).pdf PDF
Task Order Two (Road K53E-1.0 Plans).pdf PDF
DBWD LA20200051.pdf PDF
Task Order One.pdf PDF
Exhibit A.pdf PDF
Performance Relevancy Questionaire.pdf PDF
Task Order Three.pdf PDF
DBWD LA20200015.pdf PDF
Task Order Five.pdf PDF
Task Order Four.pdf PDF
Solicitation 127K1120R0007.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Order #2 – Statement of Work

OVERVIEW

The Kisatchie National Forest, Kisatchie Ranger District, has a requirement to replace existing culvert(s) with a precast concrete box culvert.

PROJECT LOCATION

The project is located on the Kisatchie Ranger District in Natchitoches Parish, Louisiana on NFSR K53E at milepost 1.0. The project is approximately 50 miles west of Alexandria, Louisiana. Latitude 31.409799, longitude 93.063479.

PRICE RANGE

The Government estimated range is between $250,000 and $500,000. Payment and performance bonds are required.

AGAR 452.211-72 Statement of Work/Specifications. (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to replace this culvert per the construction plans. (Note: 85% plans provided for developing proposal; 100% plans to be provided prior to construction.)

(End of Clause)

AGAR 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this contract.

(End of Clause)

ITEM NO. ITEM DESCRIPTION METHOD UNIT QTY PRICE TOTAL

15101 MOBILIZATION

LUMP

SUM

15201

CONSTRUCTION SURVEY AND

STAKING, METHOD 2, CLASS B

LUMP

SUM

15401 CONTRACTOR TESTING

LUMP

SUM

15713

SOIL EROSION AND POLLUTION

CONTROL

LUMP

SUM

20302

REMOVAL OF EXISTING CULVERTS,

METHOD A

CQ EACH 1

20801 STRUCTURAL EXCAVATION CQ

CUBIC

YARD

20804 CULVERT BEDDING MATERIAL CQ

CUBIC

YARD

20809 BACKFILL

LUMP

SUM

25102 PLACED RIPRAP, CLASS 2 CQ TONS 70

30102

AGGREGATE SURFACING, COARSE

GRADING, METHOD 1

CQ TONS 130

55218A

PRECAST CONCRETE MEMBER, BOX

CULVERT

CQ

LINEAR

FOOT

62504 SEEDING, DRY METHOD

LUMP

SUM

SCHEDULE OF ITEMS: K35E-1.0 BOX CULVERT

TOTAL

Statement of Work.pdf
AGAR 452.211-72 Statement of Work/Specifications. (FEB 1988)
AGAR 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)

Schedule of Items.pdf