Task Order Four.pdf
PDF 795 KB Posted
- Solicitation number
- 127K1120R0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised page 39.pdf | ||
| 521-2.726_INSP_200324 (002).pdf | ||
| Task Order One (Road 902-2.7 Plans).pdf | ||
| Task Order Two (Road K53E-1.0 Plans).pdf | ||
| DBWD LA20200051.pdf | ||
| Task Order One.pdf | ||
| Exhibit A.pdf | ||
| Performance Relevancy Questionaire.pdf | ||
| Task Order Two.pdf | ||
| Task Order Three.pdf | ||
| DBWD LA20200015.pdf | ||
| Task Order Five.pdf | ||
| Solicitation 127K1120R0007.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Order #4 – Statement of Work
OVERVIEW
The Kisatchie National Forest, Winn Ranger District, has a requirement to renovate the Harvey Gum Springs Horse Trail.
PROJECT LOCATION
The project is located on the Winn Ranger District in Natchitoches Parish, Louisiana off S. Calvin Road (Parish Road 711). The project is approximately 13 miles west of Winnfield, Louisiana. Latitude 31.929001, longitude -
92.790732. Vicinity maps are attached.
PRICE RANGE
The Government estimated range is between $25,000 and $100,000. Payment bond required.
General
The project involves:
Reconstructing line and grade of sections of horse trail, constructing drainage dips, and placing aggregate as staked by the Forest Service.
1. The contractor shall supply all material, labor, tools, equipment, vehicles, supplies, incidentals, supervision and safety measures to complete the project.
2. The contractor shall work to maintain the safety of the public in all operations.
3. Contractor shall perform all work in accordance with FP-14, Forest Service road construction BMP’s, OSHA, and this document.
Existing Conditions
Sections of the trail are unstable due to a combination of heavy use, poor drainage, and erosion.
Products
1. Government furnished products: NONE
2. Contractor furnished products: All in various quantities
1. 610 road base material per specs below:
2. Rip Rap per specs below:
Execution: Contractor coordination.
1. The Contractor shall schedule a pre-construction meeting a minimum of two weeks prior to starting their operations.
2. The Contractor shall provide tentative schedule of operations for review by the Contracting Officer during the pre-construction meeting.
3. The Contractor shall coordinate with the Government to minimize interruptions of Forest Service operations.
4. The Contractor shall maintain traffic control at all operational job-sites in order to maintain the safety of Forest visitors who may be walking, cycling, and/or horseback riding.
5. The Contractor shall coordinate with the Government to have any vehicles moved which may hinder contractor operations.
6. The contractor will remove all debris, rags, waste material; tools etc. from the project site at the end of each workday and properly dispose of offsite.
7. Drainage Dips will be constructed in accordance with the following figure:
8. All aggregate products will be placed as staked on ground by Forest Service.
Figure 1: Vicinity Map
Figure 2: Area Map
GUM SPRINGS HORSE TRAIL REPAIRS SHEDULE OF ITEMS AND BID SHEET
ITEM QTY UNIT DESCRIPTION UNIT COST EXTENDED
COST
1 878 TON CRUSHED AGGREGATE SPOT SURFACING
REPAIR
2 28 EA DRAINAGE DIPS
3 5 TON MACHINE PLACED RIP RAP