Task Order Four.pdf

PDF 795 KB Posted

Attached to
Kisatchie National Forest Road and Facility Construction
Solicitation number
127K1120R0007
Issued by

View the file

Other files

File Type Posted
Revised page 39.pdf PDF
521-2.726_INSP_200324 (002).pdf PDF
Task Order One (Road 902-2.7 Plans).pdf PDF
Task Order Two (Road K53E-1.0 Plans).pdf PDF
DBWD LA20200051.pdf PDF
Task Order One.pdf PDF
Exhibit A.pdf PDF
Performance Relevancy Questionaire.pdf PDF
Task Order Two.pdf PDF
Task Order Three.pdf PDF
DBWD LA20200015.pdf PDF
Task Order Five.pdf PDF
Solicitation 127K1120R0007.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Order #4 – Statement of Work

OVERVIEW

The Kisatchie National Forest, Winn Ranger District, has a requirement to renovate the Harvey Gum Springs Horse Trail.

PROJECT LOCATION

The project is located on the Winn Ranger District in Natchitoches Parish, Louisiana off S. Calvin Road (Parish Road 711). The project is approximately 13 miles west of Winnfield, Louisiana. Latitude 31.929001, longitude -

92.790732. Vicinity maps are attached.

PRICE RANGE

The Government estimated range is between $25,000 and $100,000. Payment bond required.

General

The project involves:

Reconstructing line and grade of sections of horse trail, constructing drainage dips, and placing aggregate as staked by the Forest Service.

1. The contractor shall supply all material, labor, tools, equipment, vehicles, supplies, incidentals, supervision and safety measures to complete the project.

2. The contractor shall work to maintain the safety of the public in all operations.

3. Contractor shall perform all work in accordance with FP-14, Forest Service road construction BMP’s, OSHA, and this document.

Existing Conditions

Sections of the trail are unstable due to a combination of heavy use, poor drainage, and erosion.

Products

1. Government furnished products: NONE

2. Contractor furnished products: All in various quantities

1. 610 road base material per specs below:

2. Rip Rap per specs below:

Execution: Contractor coordination.

1. The Contractor shall schedule a pre-construction meeting a minimum of two weeks prior to starting their operations.

2. The Contractor shall provide tentative schedule of operations for review by the Contracting Officer during the pre-construction meeting.

3. The Contractor shall coordinate with the Government to minimize interruptions of Forest Service operations.

4. The Contractor shall maintain traffic control at all operational job-sites in order to maintain the safety of Forest visitors who may be walking, cycling, and/or horseback riding.

5. The Contractor shall coordinate with the Government to have any vehicles moved which may hinder contractor operations.

6. The contractor will remove all debris, rags, waste material; tools etc. from the project site at the end of each workday and properly dispose of offsite.

7. Drainage Dips will be constructed in accordance with the following figure:

8. All aggregate products will be placed as staked on ground by Forest Service.

Figure 1: Vicinity Map

Figure 2: Area Map

GUM SPRINGS HORSE TRAIL REPAIRS SHEDULE OF ITEMS AND BID SHEET

ITEM QTY UNIT DESCRIPTION UNIT COST EXTENDED

COST

1 878 TON CRUSHED AGGREGATE SPOT SURFACING

REPAIR

2 28 EA DRAINAGE DIPS

3 5 TON MACHINE PLACED RIP RAP

TOTAL

Statement of Work Gum Springs Horse trail repairs.pdf