Task Order One.pdf

PDF 285 KB Posted

Attached to
Kisatchie National Forest Road and Facility Construction
Solicitation number
127K1120R0007
Issued by

View the file

Other files

File Type Posted
Revised page 39.pdf PDF
521-2.726_INSP_200324 (002).pdf PDF
Task Order One (Road 902-2.7 Plans).pdf PDF
Task Order Two (Road K53E-1.0 Plans).pdf PDF
DBWD LA20200051.pdf PDF
Exhibit A.pdf PDF
Performance Relevancy Questionaire.pdf PDF
Task Order Two.pdf PDF
Task Order Three.pdf PDF
DBWD LA20200015.pdf PDF
Task Order Five.pdf PDF
Task Order Four.pdf PDF
Solicitation 127K1120R0007.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Order #1 – Statement of Work

OVERVIEW

The Kisatchie National Forest, Caney Ranger District, has a bridge that requires replacement.

PROJECT LOCATION

The project is located on the Caney Ranger District in Claiborne Parish, Louisiana, on NFSR 902 at milepost 2.7.

The site is approximately 75 miles ENE of Shreveport, Louisiana, near Corney Lake Recreation Area. Latitude 31.502906, longitude -92.460041.

PRICE RANGE

The Government estimated range is between $250,000 and $500,000. Payment and performance bonds are required.

AGAR 452.211-72 Statement of Work/Specifications. (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to replace this bridge per the per the construction plans. (Note: 85% plans provided for developing proposal; 100% plans to be provided prior to construction.)

(End of Clause)

AGAR 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this contract.

(End of Clause)

ITEM NO. ITEM DESCRIPTION METHOD UNIT QTY PRICE TOTAL

15101 MOBILIZATION

LUMP

SUM

15201

CONSTRUCTION SURVEY AND STAKING,

METHOD 2, CLASS B

LUMP

SUM

15401 CONTRACTOR TESTING

LUMP

SUM

15713 SOIL EROSION AND POLLUTION CONTROL

LUMP

SUM

20302 REMOVAL OF EXISTING BRIDGE, METHOD A CQ EACH 1

20401

UNCLASSIFIED BORROW, COMPACTION

PLACEMENT 2, TOLERANCE CLASS A

CQ

CUBIC

YARD

20801 STRUCTURAL BACKFILL CQ

CUBIC

YARD

20803 STRUCTURAL EXCAVATION

LUMP

SUM

25102 PLACED RIPRAP, CLASS 2 CQ TONS 115

30102

AGGREGATE SURFACING, COARSE GRADING,

METHOD 1

CQ TONS 105

55101

PRESTRESSED CONCRETE PILE, 14" X 14", IN

PLACE

CQ

LINEAR

FOOT

55201 STRUCTURAL CONCRETE, CLASS A, (AE) CQ

CUBIC

YARD

55218A

PRECAST CONCRETE MEMBER, ABUTMENT

PILE CAP

CQ EACH 2

55218B PRECAST CONCRETE MEMBER, WINGWALL CQ EACH 4

55218C

PRECAST CONCRETE MEMBER, BACKING

PLANK

CQ EACH 2

55301A

PRECAST, PRESTRESSED STRUCTURAL

CONCRETE MEMBER, TXDOT 4SB15, 40' LONG

CQ EACH 2

55301B

PRECAST, PRESTRESSED STRUCTURAL

CONCRETE MEMBER, TXDOT 5SB15, 40' LONG

CQ EACH 2

55401 REINFORCING STEEL, GRADE 60 CQ LBS 960

55601 BRIDGE TRAFFIC BARRIER CURB CQ

LINEAR

FOOT

SCHEDULE OF ITEMS: BRIDGE 902-2.7

TOTAL

Statement of Work.pdf
AGAR 452.211-72 Statement of Work/Specifications. (FEB 1988)
AGAR 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)

SCHEDULE OF ITEMS.pdf