Atch 5A Drawings.pdf
PDF 3 MB Posted
- Solicitation number
- 127EAX26Q0070
- Issued by
-
Department of Agriculture Forest Service
About this file
This file is a set of technical construction drawings and specifications for the Sand Pond Boardwalk project located in the Tahoe National Forest, Yuba River Ranger District, managed by the United States Department of Agriculture Forest Service.
The project involves constructing a new boardwalk with accessible passing spaces and removing existing infrastructure. Key construction elements include a boardwalk structure with 6x6 posts, 4x12 beams, 3x6 decking, and 2x4 curbs, all spaced at 8-foot intervals on center. The deck height shall not exceed 30 inches above existing ground. All timber materials must be Douglas Fir-Larch No. 1 (S4S) for deck planks, posts, and curbs, and No. 2 or better (rough) for beams, with maximum moisture content of 19%. All timber shall be pressure-treated with copper naphthenate in heavy oil per AASHTO M133 and AWPA standards (UC4B category). Field cuts require two applications of copper naphthenate 2% solution, and all fasteners and deck screws must be galvanized or better. The contractor must provide all materials, labor, and equipment, with work confined to 7:00 AM to 6:00 PM Monday through Friday. Construction debris must be properly collected and disposed of off-site, and all equipment must be washed and inspected for cleanliness prior to use. The project schedule includes trail log coordinates, bridge replacement tasks, boardwalk construction phases, gravel section installation, and installation of accessible passing spaces at multiple stations along the trail.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWN
DESIGNER
CHECKED
DATE
PROJECT NO.
DWG SHEET NO.
United States Department of Agriculture Forest Service
9/1 6/2
6 1 5:
JC
LE
ME
NS
C :\U
SE
RS
\JC
LE
ME
NS
\O
NE
DR
IV
E
- U
SD
A\
DE
SK
TO
P\
SA
ND
P
ON
D
9-
-2 6 R
FI
.D
W G;
SAND POND
BOARDWALK
TAHOE NATIONAL
FOREST
YUBA RIVER RANGER DISTRICT
PROJECT TRAIL LOG
AND PHOTOS
3/25/2024
J.CLEMENS
ARCHIVE NO.
ARCHIVE_NUMBER
DRAWING TITLE
C-01
SHEET 4 OF 7
(R5)
PACIFIC SOUTHWEST REGION
TAHOE
ENGINEERING
C. VILLA
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
EXISTING BRIDGE TO BE REMOVED
AutoCAD SHX Text
DESCRIPTION OF WORK LOG
AutoCAD SHX Text
EXISTING LUMBER PILE NO. 2 TO BE REMOVED
AutoCAD SHX Text
EXISTING LUMBER PILE NO. 1 TO BE REMOVED
AutoCAD SHX Text
EXISTING BOARDWALK SECTION (TYP.) TO BE REMOVED
AutoCAD SHX Text
EXISTING TRAIL ALIGNMENT
AutoCAD SHX Text
EXISTING TRAIL ALIGNMENT
CHECKED
DATE
PROJECT NO.
DWG SHEET NO.
United States Department of Agriculture Forest Service
9/1 6/2
6 1 5:
JC
LE
ME
NS
C :\U
SE
RS
\JC
LE
ME
NS
\O
NE
DR
IV
E
- U
SD
A\
DE
SK
TO
P\
SA
ND
P
ON
D
9-
-2 6 R
FI
.D
W G;
SAND POND
BOARDWALK
TAHOE NATIONAL
FOREST
YUBA RIVER RANGER DISTRICT
BOARDWALK DETAILS 1
3/25/2024
ARCHIVE NO.
ARCHIVE_NUMBER
DRAWING TITLE
C-02
SHEET 5 OF 7
(R5)
PACIFIC SOUTHWEST REGION
TAHOE
ENGINEERING
J. CLEMENS
C. VILLA
NOTES:
1. TIMBER TO BE PRESSURE TREATED. SEE BOARDWALK TIMBER NOTES SHEET G-03.
2. MAX HEIGHT OF POSTS SHALL BE DETERMINED IN THE FIELD BY CONTRACTOR TO
KEEP TOP OF DECK NO HIGHER THAN 30" ABOVE THE EXISTING GROUND. CURB
MAY EXTEND ABOVE 30".
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
BOARDWALK PROFILE DETAILS N.T.S..
BOARDWALK SECTION DETAILS N.T.S..
CHECKED
DATE
PROJECT NO.
DWG SHEET NO.
United States Department of Agriculture Forest Service
9/1 6/2
6 1 5:
JC
LE
ME
NS
C :\U
SE
RS
\JC
LE
ME
NS
\O
NE
DR
IV
E
- U
SD
A\
DE
SK
TO
P\
SA
ND
P
ON
D
9-
-2 6 R
FI
.D
W G;
SAND POND
BOARDWALK
TAHOE NATIONAL
FOREST
YUBA RIVER RANGER DISTRICT
BOARDWALK DETAILS 2
3/25/2024
ARCHIVE NO.
ARCHIVE_NUMBER
DRAWING TITLE
C-03
SHEET 6 OF 7
(R5)
PACIFIC SOUTHWEST REGION
NOTE:
ACCESSIBLE PASSING SPACES ARE INCIDENTAL TO PAY ITEM 938
TAHOE
ENGINEERING
J.CLEMENS
C. VILLA
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
ACCESSIBLE PASSING SPACE SECTION DETAILS N.T.S..
AutoCAD SHX Text
BOARDWALK PERSPECTIVE VIEW (N.T.S.) PIERS NOT SHOWN
AutoCAD SHX Text
ACCESSIBLE PASSING SPACE PLAN VIEW N.T.S..
BOARDWALK DECK AND CURB DETAILS (N.T.S.) PIERS NOT SHOWN
CHECKED
DATE
PROJECT NO.
DWG SHEET NO.
United States Department of Agriculture Forest Service
9/1 6/2
6 1 5:
JC
LE
ME
NS
C :\U
SE
RS
\JC
LE
ME
NS
\O
NE
DR
IV
E
- U
SD
A\
DE
SK
TO
P\
SA
ND
P
ON
D
9-
-2 6 R
FI
.D
W G;
(R5)
SAND POND
BOARDWALK
TAHOE NATIONAL
FOREST
YUBA RIVER RANGER DISTRICT
VICINITY MAP &
SCHEDULE OF ITEMS
3/25/2024
TAHOE
ENGINEERING
J. CLEMENS
ARCHIVE NO.
ARCHIVE_NUMBER
DRAWING TITLE
G-02
SHEET 2 OF 7
PACIFIC SOUTHWEST REGION
TO GRAEAGLE
TO SIERRA CITY
TO SIERRAVILLE
SAND POND BOARDWALK
PROJECT SITE
SAND POND BOARDWALK VICINITY MAP
C. VILLA
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
CHECKED
DATE
PROJECT NO.
DWG SHEET NO.
United States Department of Agriculture Forest Service
9/1 6/2
6 1 5:
JC
LE
ME
NS
C :\U
SE
RS
\JC
LE
ME
NS
\O
NE
DR
IV
E
- U
SD
A\
DE
SK
TO
P\
SA
ND
P
ON
D
9-
-2 6 R
FI
.D
W G;
SAND POND
BOARDWALK
TAHOE NATIONAL
FOREST
YUBA RIVER RANGER DISTRICT
SCHEDULE OF ITEMS
AND
GENERAL NOTES
3/25/2024
J. CLEMENS
ARCHIVE NO.
ARCHIVE_NUMBER
DRAWING TITLE
G-03
SHEET 3 OF 7
(R5)
PACIFIC SOUTHWEST REGION
GENERAL NOTES:
1. PERFORM CONSTRUCTION IN CONFORMANCE WITH THE STANDARD SPECIFICATIONS FOR
CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FOREST SERVICE PROJECTS, US
CUSTOMARY UNITS, EXCEPT AS MODIFIED BY SUPPLEMENTAL SPECIFICATIONS AND THE
FOREST SERVICE TRAIL ACCESSIBILITY GUIDELINES (FSTAG) 2013 CLAUSES IN THE CONTRACT
DOCUMENT OR THE PLANS.
2. CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT
3. WATER FOR FIRE PREVENTION & SUPPRESSION REQUIREMENTS UNDER THE CONTRACT, AS
WELL AS FOR USE WITH CONSTRUCTION ACTIVITIES SHALL ABIDE BY CURRENT NMFS WATER
DRAFTING GUIDELINES. WATER CAN BE OBTAINED AT THE BOAT RAMP OF SARDINE LAKE NEAR
THE PROJECT SITE. ALL WITHDRAWALS REQUIRE SCREEN INTAKES WITH A MAXIMUM SCREEN
OPENING OF 3/32 INCHES AND A MAXIMUM VELOCITY OF 0.4 FEET PER SECOND. WATER
WITHDRAWAL FROM ANY OTHER SOURCE SHALL BE APPROVED IN WRITING, PRIOR TO USE, BY
THE CO.
4. PRIOR TO DIGGING, CALL "DIG SAFELY CALIFORNIA" 811. LOCATING AND PROTECTION OF ALL
UTILITIES (PUBLIC & PRIVATE) IS THE RESPONSIBILITY OF THE CONTRACTOR.
5. REMOVE ALL CONSTRUCTION RELATED REFUSE FROM GOVERNMENT LAND PRIOR TO FINAL
ACCEPTANCE.
6. REPAIR ANY DAMAGE DUE TO CONTRACTOR'S OPERATIONS, INSIDE OR OUTSIDE THE PROJECT
BOUNDARY, AT THE CONTRACTOR'S EXPENSE, PRIOR TO FINAL ACCEPTANCE.
7. CONFINE CONSTRUCTION EQUIPMENT TO THE PROJECT AND STAGING AREAS UNLESS
OTHERWISE SHOWN ON THE PLANS OR APPROVED BY THE CO.
8. STORING OF ALL EQUIPMENT ON GOVERNMENT LANDS WILL BE AT THE CONTRACTOR'S RISK
AND AT A LOCATION APPROVED BY THE COR.
9. ALL SLASH, DEBRIS, AND WASTE MATERIAL SHALL BE DISPOSED OF OFF NFS LANDS.
10. THE SUBMITTED TRAFFIC CONTROL PLAN SHALL INCLUDE METHODS TO WARN PUBLIC TRAFFIC
OF ROAD WORK ACTIVITIES. ALL CONSTRUCTION SIGNS SHALL MEET CURRENT MUTCD
REQUIREMENTS.
11. FOREST SERVICE ROADS SHALL NOT BE CLOSED TO TRAFFIC.
12. ALL EQUIPMENT SHALL BE WASHED PRIOR TO USE ON THIS PROJECT AND SHALL BE INSPECTED
PRIOR TO USE TO VERIFY CLEAN AND WEED FREE STATE.
13. THE CONTRACTOR SHALL PERFORM ALL WORK BETWEEN THE HOURS OF 7:00 AM AND 6:00 PM
MONDAY THROUGH FRIDAY. NO WORK SHALL BE PERFORMED ON WEEKENDS OR FEDERAL
HOLIDAYS WITHOUT PRIOR APPROVAL FROM THE CO.
14. FOLLOW BEST MANAGEMENT PRACTICES (BMP) AS LISTED IN THESE PLANS, THE CONTRACT, SPECIFICATIONS AND THE FIRE PLAN.
15. TRAIL WILL BE CLOSED TO PUBLIC DURING CONSTRUCTION HOWEVER CONTRACTOR IS
RESPONSIBLE FOR PUBLIC SAFETY
ABBREVIATIONS:
NFS - NATIONAL FOREST SYSTEM CO - CONTRACTING OFFICER FS - FOREST
SERVICE
FSSS - FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS
TAHOE
ENGINEERING
C. VILLA
BOARDWALK TIMBER NOTES:
1. DECK PLANKS, POSTS, AND CURBS SHALL BE DOUGLAS FIR- LARCH NO. 1, S4S
2. BEAMS SHALL BE DOUGLAS FIR- LARCH NO. 2 OR BETTER, ROUGH.
3. MAXIMUM MOISTURE CONTENT FOR TIMBER SHALL BE 19%.
4. ALL TIMBER ON THE BOARDWALK SHALL BE PRESSURE TREATED WITH COPPER
NAPHTHENATE IN HEAVY OIL, IN ACCORDANCE WITH AASHTO M133, AWPA AND AWPA U1-09.
USE CATEGORY UC4B.
5. TREATED MATERIALS SHALL FOLLOW THE POST TREATMENT REQUIREMENTS SUMMARIZED
IN THE “BEST MANAGEMENT PRACTICES FOR THE USE OF TREATED WOOD IN AQUATIC
ENVIRONMENTS” (WWPI 1196) TO ENSURE ALL SURFACES ARE FREE OF EXCESS
PRESERVATIVE AND CHEMICALS ARE ADEQUATELY FIXATED IN THE WOOD.
6. FIELD CUTS SHALL BE TREATED WITH TWO APPLICATIONS OF COPPER NAPHTHENATE 2%
SOLUTION. APPLY IN SUCH A MANNER THAT THE PRESERVATIVE DOES NOT DRIP OR SPILL
INTO THE ENVIRONMENT.
7. CUT BEAMS SO THEY FIT FLUSH AND TIGHT TO THE ADJOINING MEMBER.
8. ALL FASTENERS AND DECK SCREWS SHALL BE GALVANIZED OR BETTER.
9. FOLLOW THE PROCEDURES OUTLINED IN AWPA STANDARD M4, STANDARD FOR THE CARE
OF PRESERVATIVE-TREATED WOOD PRODUCTS.
10. WHEN FIELD CUTTING, DRILLING OR FABRICATION IS NECESSARY, IT SHOULD BE DONE AWAY
FROM THE WATER OR WETLAND AREA TO THE DEGREE PRACTICAL AND ALL WASTE,
INCLUDING SAWDUST, SHOULD BE COLLECTED AND DISPOSED OF APPROPRIATELY. (SEE
BMP REFERENCED BELOW).
11. ENSURE THAT DEBRIS FROM FIELD FABRICATION IS COLLECTED AND REMOVED. IN MOST
CASES, FABRICATION SHOULD BE DONE AT SPECIFIC CUTTING STATIONS TO CONSOLIDATE
THE COLLECTION OF DEBRIS. THE USE OF A TARP IS SUGGESTED FOR COLLECTING
SAWDUST FROM CIRCULAR SAWS AND CHAINSAWS. PLASTIC TUBS OR SIMILAR CONTAINERS
ARE SUGGESTED FOR COLLECTING DEBRIS CREATED FROM DRILLING HOLES ON SITE. (SEE
BMP REFERENCED BELOW).
12. FOLLOW THE SPECIFIERS GUIDE BEST MANAGEMENT PRACTICES FOR THE USE OF
PRESERVED WOOD IN AQUATIC AND SENSITIVE ENVIRONMENTS TO THE GREATEST EXTENT
POSSIBLE https://preservedwood.org/wp-content/uploads/BMP_Specifiers_Guide.pdf
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
CONTRACTOR RESPONSIBLE FOR ANY UTILITY LINE LOCATES AND ANY DAMAGED DONE TO UTILITY LINES WHEN INSTALLING SIGN POSTS OR ANY OTHER EARTHWORK INVOLVED WITH SIGN INSTALLATION
CHECKED
DATE
PROJECT NO.
DWG SHEET NO.
United States Department of Agriculture Forest Service
9/1 6/2
6 1 5:
JC
LE
ME
NS
C :\U
SE
RS
\JC
LE
ME
NS
\O
NE
DR
IV
E
- U
SD
A\
DE
SK
TO
P\
SA
ND
P
ON
D
9-
-2 6 R
FI
.D
W G;
SAND POND
BOARDWALK
TAHOE NATIONAL
FOREST
YUBA RIVER RANGER DISTRICT
RFI BACKWALL DETAIL
3/25/2024
ARCHIVE NO.
ARCHIVE_NUMBER
DRAWING TITLE
(R5)
PACIFIC SOUTHWEST REGION
TAHOE
ENGINEERING
TNF
C. VILLA
NOTES:
1. DETAIL FOR BACKWALL CONSTRUCTION INFORMATION
ONLY NOT BOARDWALK CONSTRUCTION.
2. CURB NOT SHOWN FOR CLARITY.
3. APPROACH NOT SHOWN FOR CLARITY.
4. CONSTRUCT APPROACH FILL WITH COMPACTED SUITABLE
MATERIAL.
5. ALL TIMBER SHALL CONFORM TO THE SPECIFICATIONS
AND TIMBER NOTES ON SHEET G-03
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
APPROACH AND BACKWALL DETAIL PERSPECTIVE VIEW (N.T.S.) CURB AND PIERS NOT SHOWN
AutoCAD SHX Text
BACKWALL DETAIL NOT TO SCALE
BACKWALL PLAN VIEW (N.T.S.)
| Sheets and Views |
| Sand Pond 9-16-26 RFI-C-01 |
| Sand Pond 9-16-26 RFI-C-02.pdf |
| Sheets and Views |
| Sand Pond 9-16-26 RFI-C-02 |
| Sand Pond 9-16-26 RFI-C-03.pdf |
| Sheets and Views |
| Sand Pond 9-16-26 RFI-C-03 |
| Sand Pond 9-16-26 RFI-G-02.pdf |
| Sheets and Views |
| G-02 |
| Sand Pond 9-16-26 RFI-G-03.pdf |
| Sheets and Views |
| Sand Pond 9-16-26 RFI-G-03 |
| Sand Pond 9-16-26 RFI-RFI-BACKWALL.pdf |
| Sheets and Views |
| Sand Pond 9-16-26 RFI-RFI-BACKWALL |
File details come from the government source that posted it. Updated .