This document is an email correspondence regarding Standard Penetration Test (SPT) blow count data collected for the Sand Pond Trail Bridge project. Jonathan Berry, PE and Public Services Staff Officer with the Plumas National Forest, reports geotechnical findings from subsurface investigations conducted at the bridge site.

The SPT data was collected at depths of 7 feet below ground surface and deeper using previously established bore holes. At Hole 1, the Drive probe achieved refusal after progressing only half an inch with 90 blows, indicating either very dense soil or obstruction. At Hole 3, two measurements were recorded: 67 blows at the 7.5-8 foot depth interval and 103 blows at the 8.0-8.2 foot depth interval. Advancement beyond 8.2 feet was not possible; a large one-inch gravel clast was retrieved by auger, with uncertainty regarding whether the material represents glacial till or bedrock. The high blow counts and refusal conditions suggest increasingly dense or resistant soil and subsurface conditions at depth.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Shields, Christopher (CTR) - FS, CA

From: Berry, Jonathan - FS, CA Sent: Friday, September 26, 2025 1:27 PM To: Shields, Christopher (CTR) - FS, CA Cc: Rios, Temoc - FS, CA Subject: SPT Blow counts - Sand Pond Trail Bridge

Chris, I used the same holes as before, so I only have SPT data at the 7’ depth and below. For hole 1- the Drive probe only progressed ½” with 90 Blows-Assumed refusal with the equipment I have. Below are the results for hole 3.

Blows 67 103

Depth interval (ft below Ground Surface) 7.5-8 8.0-8.2 Note: At hole 3, did not progress beyond 8.2'. A large clast of gravel (1”) retrieved by auger. Unclear if this is glacial till or bedrock.

Jonathan Berry, PE Public Services Staff Officer

Forest Service Plumas National Forest p: 530-283-7853 c: 530-616-5770 jonathan.berry@usda.gov