Atch 2 Updated SOI 9-17-27.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
GAOA Sand Pond Trail Boardwalk Replacement Tahoe NF
Solicitation number
127EAX26Q0070
Issued by

About this file

This is a Schedule of Items (SOI) spreadsheet attachment for an RFQ solicitation.

The document is an updated pricing and line-item schedule for the GAOA Sand Pond Trail Boardwalk Replacement project on the Tahoe National Forest. It contains detailed cost breakdowns organized by work categories and deliverables required for the boardwalk replacement project. The schedule lists individual line items with associated quantities, unit costs, and extended prices that bidders must use when submitting their quotations. As specified in Amendment 2 of solicitation 127EAX26Q0070, contractors must submit their quotes using this updated schedule of items; failure to use the current version may result in non-responsive proposals. The spreadsheet format enables standardized pricing comparison across all bids submitted for this small business set-aside solicitation issued by the Department of Agriculture Forest Service.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Sand Pond Boardwalk Replacement- Schedule of Items
BASE ITEMS
Item No.DescriptionQuantitiesMethod of
MeasureTotal
QuantityUnit PriceTotal Price
90701MobilizationCQLump Sum1$ -$ -

91203 Clearing and Grubbing CQ Lump Sum 1 $ - $ -

93801 Boardwalk All Materials and Complete Installation Including Backwalls at Stations 0+00 and 11+83 CQ Lineal Feet 1062 $ - $ -

96202 Bridge All Materials and Complete Intallation CQ Lump Sum 1 $ - $ -

98202 Erosion Control CQ Lump Sum 1 $ - $ -

98301 Removal of Improvements- Existing Bridge, 200 LF Existing Boardwalk and 2 Lumber Debris Piles (10' x 10' x 4' each) CQ Lump Sum 1 $ - $ -

99101Crushed Aggregate Surface Course, Grading B Delivery and Stockpile OnlyCQCubic Yard20$ -$ -
TOTAL BASE ITEMS
OPTION ITEMS
93801ABoardwalk Backwalls at Stations 2+65 and 3+61CQEach2$ -$ -
93801BBoardwalk All Materials and Complete Installation from Stations 2+65 to 3+61CQLineal Feet96$ -$ -
TOTAL OPTION ITEMS
TOTAL BASE + OPTION ITEMS
Contractor
Point of Contact
Email
Phone Number
UEI #
NOTES:

1. Offerors must submit pricing on all items to be considered responsive. Must quote on all items. Round to the nearest cent.

2. Payment for bond premiums in accordance with FAR 52.232-5. Payments under Fixed-Price Construction Contracts shall not be in addition to the contract price but can be included under Mobilization.

3. Quantities are provided for information only and are in-place quantities. No shrinkage or swell factors have been applied. Contractor shall verify quantities.

4. Items labeled as optional are not required to be exercised by the government. If exercised, the contractor will be required to perform the optional work in accordance with the terms and conditions of this contract. If sufficient funds available, the government will exercise the option item(s) at award.

5. Only one option will be awarded, not both.

File details come from the government source that posted it. Updated .