Questions_Matrix_RFQ 12760421Q0122 - eSafety - 4 - Final.xlsx

XLSX spreadsheet 91 KB Posted

Attached to
2021 eSafety Recompete
Solicitation number
12760421Q0122
Issued by

About this file

This document contains questions and answers related to a solicitation for an integrated Workers' Compensation and Safety and Occupational Health case management software as a service solution. Key details include that the solution should support up to 10,000 new incidents or claims per year with unlimited users, have approximately 2,000 full user licenses and 30 claim administrator licenses. Historical cases to migrate are estimated at 25,000 stored in an existing Origami Risk solution. The Department of Agriculture Forest Service is the contracting agency, with priority given to mandatory and critical requirements.

Questions cover topics such as concurrent user volumes, document volumes and sizes, number of workflows and their complexity, integration requirements, service level agreements, 508 compliance responsibilities, language support needs, test environment access, supported document management systems including SharePoint version and hosting, disaster recovery objectives, fax capabilities, non-employee user access, example exportable visuals, template change frequencies, and an example of a user-defined formula. Responses provide clarification and estimates around many of these areas as needed for proposal preparation.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dynamo

Question #Document ReferencePage NumberSectionVendor QuestionGovernment's ResponseORIG REQUIREMENTWO OSOH NOTES
1SOHWC+RFP+Attachment+X+SOO_v4_05202021355.6 Detailed Offer InstructionsAre Small Business vendors (prime contractors) required to meet subcontracting mandates? Are we required to provide a Subcontractor Management Plan?PPSNo, pg. 35(bottom) - 36, the table Volume 1 Factor 4. State "THIS SECTION DOES NOT APPLY TO SMALL BUSINESS OFFERORS", this factor is for Large Businesses, and refers to Subcontracting Plans, and pg. 43 of the RFP, at the top of the page states, "THIS SECTION DOES NOT APPLY TO SMALL BUSINESS OFFERORS". This section refers to the Subcontracting Plan, and does not apply to small business offerors.
2N/AWhat is expected to be the average concurrent number of users on the system, i.e. within the same hour?HRM: : Up to 50K50,000 IS WAY TOO HIGH. I'D EXPECT NO MORE THAN 5,000 AT THE SAME TIME, BASED ON THE NUMBER OF CASES IN THE SYSTEM AT THE PEAK TIMES OF THE YEAR.
3N/AWhat is the document-management solution in use at FS? Please ballpark the expected number and size of any documents per year.HRM: Unknown
4SOHWC+RFP+Attachment+X+SOO_v4_0520202163.9What is the volume of historical cases which need to be loaded as part of Data Migration, and where are they currently stored? Is the intent to access them or load them into the new solution?HRM: Estimated 25K cases per year. Currently stored in Origami Risk solution. Yes, the intent is to access them or load them into the new solution.SAFETY DOES NOT INTEND TO MIGRATE ANYTHING FROM ESAFETY FOR PRIOR TO CY2022; HR HAS DIFFERENT REQUIREMENTS FOR CASE MANAGEMENT. WE WILL NEED TO BE ABLE TO LOAD CY2022 OSHA 300 LOG DATA; BATCH FILE WOULD BE PREFERRED SO AS TO AVOID A MANUAL PROCESS. NOTE: ACCIDENT, INJURY AND ILLNESS REPORTS TYPICALLY ARE 4,100 INCIDENT REPORTS PER YEAR WITH AN ADDITIONAL 1,600 MOTOR VEHICLE ACCIDENT REPORTS. NO NEED TO UPLOAD HAZARD REPORTS OR SAFETY STORIES.
5SOO+Appendix+C_FS_OSOH_WC_IntegratedProjectRequirements+3May2021+v3"Safety" tabOSOH-78Are you allowed to continue development/testing while ATO evaluation is in progress?CIO Cyber Security: Yes, but without real production data. Dev and test are authorized only with dev/test data.
6SOO+Appendix+C_FS_OSOH_WC_IntegratedProjectRequirements+3May2021+v3"Safety" tabOSOH-6What is the expected timeframe to establish an integration with possible considerations for on-premise infrastructure changes? How long would it take for the Government to connect to a VPN tunnel/PrivateLink?CIO: Unknown. USFS has a complex infrastructure that consists of on-prem (USDA Internal), cloud environments and government owned shared services (in partnership with other government agencies). Multiple tunnel and network firewalls are already in place. The timeline of any integration needs across network (incl firewalls) will depend on complexity of the requirement, data types that are being transferred along with meeting encryption and security boundary requirements. All changes follow strict, auditable change management process. The timeline for establishment of a VPN tunnel will be driven by the requirements and standards in the sentence above, but typically we are able to establish VPN tunnels within 2 months.
7SOO+Appendix+C_FS_OSOH_WC_IntegratedProjectRequirements+3May2021+v3"Safety" tabOSOH-132 & OSOH-133How many inbound and outbound interfaces are projected for MVP?HRM: All identified as part of the MVP.
8SOO+Appendix+C_FS_OSOH_WC_IntegratedProjectRequirements+3May2021+v3"Safety" & "Workers Comp" tabWhat Priority level is considered MVP? Mandatory and Critical?HRM: Mandatory
9SOO+Appendix+C_FS_OSOH_WC_IntegratedProjectRequirements+3May2021+v3"Safety" tabOSOH-8Who is expected to perform the 508 compliance audits once the "out of the box" solution is configured for use by the Government?OCIO/CIO is expected to perform the 508 compliance audits.
10N/ADoes FS expect the need for internationalization, or support for languages other than English?HRM: No
11SOO+Appendix+C_FS_OSOH_WC_IntegratedProjectRequirements+3May2021+v3"Safety" tabOSOH-6What Document Management solutions needs to be supported? There are references to "Must interface with SharePoint" which version, and hosted where?OSOH: Unknown
CIO: CIO standard document management system is Box. Sharepoint is also used through Office 365 and version is Sharepoint 2019The system must provide standard out of the box capabilities for enterprise integration with document management, workflow management, case management and customer relationship management systems. OSOH-6, MANDATORY
12SOO+Appendix+C_FS_OSOH_WC_IntegratedProjectRequirements+3May2021+v3"Safety" tabOSOH-36
OSOH-37What are the desired SLAs for Disaster Recovery / Recovery Point Objective, or any other SLAs related to the need to "load backup media" and "restore system data"?CIO: Desired restore time should 4-6 hours, but will be based on requirements.OSOH-36/MANDATORY. The system must be able to load backup media. OSOH-37/MANDATORY. The system must be able to restore system data.WHATEVER WORKS FOR CIO FOR DATA INTEGRITY AND BACKUP.
13SOO+Appendix+C_FS_OSOH_WC_IntegratedProjectRequirements+3May2021+v3"Safety" tabOSOH-91How will the system be expected to interact with Faxes?OSOH: PERTAINS TO FAXED IN COPIES OF REPORTS, INCLUDING FROM FIRE CAMPS. This means data should be faxed in and be imported into the solutionWO OSOH 91/CRITICAL. The system must have fax capabilities.PERTAINS TO FAXED IN COPIES OF REPORTS, INCLUDING FROM FIRE CAMPS.
14SOO+Appendix+C_FS_OSOH_WC_IntegratedProjectRequirements+3May2021+v3"Safety" tabOSOH-122.2.1
In what capacity are non-employee users accessing the system? How are they expected to access information from the system?CIO/HRM: Non-employees need to be able to submit reports. They will need to authenticate via some form of 2-factor authentication - eg: Login.govWO OSOH 122.2.1/USER ROLES, ACCESS/MANDATORY. The system must capture basic personal information about non-Employees who access the system.THIS WAS A HOLDOVER FROM ESAFETY; I'M NOT SURE OF WHY THIS IS A REQUIREMENT BUT REALLY APPLIES TO HR CASE MANAGEMENT AND NOT SAFETY MANAGEMENT.
15SOO+Appendix+C_FS_OSOH_WC_IntegratedProjectRequirements+3May2021+v3"Safety" tabOSOH-126.4
Can FS provide an example of a system-generated graphic/visual the user should be able to export?CIO: There should be multiple data exports available pertaining to individual cases, trending case types, yearly case reporting etc. These reports should have graphs and charts found on common industry standard dashboard reports - https://slemma.com/site/resources/database.jpgOSOH 126.4/ARCHIVE, PRINT, EXPORT/ MANDATORY. The system must provide Visual (graphics) export capabilities.LOOKING FOR DATA OUTPUT IN A VISUAL FORMAT (SCREEN CAPTURE, JPEG) FOR RECORDS. NO SPECIFIC EXAMPLE BUT RELATES TO TRENDING, ANALYSIS, AND INDIVIDUAL CASES. WHAT IS INDUSTRY STANDARD?
16SOO+Appendix+C_FS_OSOH_WC_IntegratedProjectRequirements+3May2021+v3"Safety" tabOSOH-51
What's an example of a "user-defined" formula?OSOH: AN EXAMPLE WOULD BE A FOREST SAFETY MANAGER SORTING DATA BY WORKER TYPE (FIREFIGHTER, ENGINEER, REC TECH, ETC.), LOCATION (DISTRICT OR ON/OFF FOREST ON FIRE ASSIGNMENT), DATE RANGE, ETC. FOR TREND ANALYSIS. CIO: There needs to be a single customizable dashboard for each system user, wher they can decide what metrics and associated graphs and charts they select to include on their dashboardWO OSOH 51/DASHBOARD/USEFUL. The system must provide the ability to save user-defined formulas for metrics onto the user's personal dashboard.AN EXAMPLE WOULD BE A FOREST SAFETY MANAGER SORTING DATA BY WORKER TYPE (FIREFIGHTER, ENGINEER, REC TECH, ETC.), LOCATION (DISTRICT OR ON/OFF FOREST ON FIRE ASSIGNMENT), DATE RANGE, ETC. FOR TREND ANALYSIS.

Orig

Vendor Name:Dynamo-Alpha Omega
Date:Wednesday, September 01, 2021
Question #Document ReferencePage NumberSectionVendor QuestionGovernment's Response
1Attachment 151.1 (General Question)How many total users will the system have? When is peak usage with the highest concurrent usage per year?0004 Incident/Claim Reporting (Monthly) 12 MO $ $

-Tier 1 up to 10K New Incidents/claims per Year

- Unlimited Users 0005 Full User Licenses 2000 EA 0006 Claim Administrator Licenses 30

2Attachment 151.1 (General Question)What is expected to be the average concurrent number of users on the system, i.e. within the same hour?
3Attachment 151.1 (General Question)Please ballpark the expected number of cases/records per year? Are any other types of cases to be included, and if so, how many per year?-Tier 1 up to 10K New Incidents/claims per Year
4Is there a need to read data from the Appian Cloud database in order to put data into another reporting system?
5Please ballpark the expected number and size of any documents per year?
6How many application business process workflows do you expect and on a scale of 1 to 10 how complex are those workflows?
7Do you expect that the application will need to integrate with any of the following; 1) existing government databases, 2) integrate with any government web services, 3) publish data to ERP systems, 4) connect to an Active Directory, 5) Robotic Process Automation in the workflow?Part of this is Section 3 #18 of SOO
8What are any SLA's that are dictated?Section 9 Performance Standards
9SOO63.9What is the volume of historical cases which need to be loaded as part of Data Migration, and where are they currently stored? Is the intent to access them or load them into the Apppian based system?
10Integrated Project Requirements"Safety" tabOSOH-78What is the expected duration for the ATO evaluation and approval? Who will be responsible for leading ATO efforts?
11Integrated Project Requirements"Safety" tabOSOH-6What is the expected timeframe to establish an integration with possible considerations for on-premise infrastructure changes? How long would it take for the Government to connect to a VPN tunnel/PrivateLink?
12Integrated Project Requirements"Safety" tabOSOH-132 & OSOH-133How many inbound and outbound interfaces are projected for MVP?
13Integrated Project Requirements"Safety" & "Workers Comp" tabWhat Priority level is considerd MVP? Mandatory and Critical?
14Integrated Project Requirements"Safety" tabOSOH-8Who is expected to perform the 508 compliance audits?Partial answer in sec 3.9 of RFP
15N/ADoes FS expect the need for internationalization, or support for languages other than English?
16N/AWill the developers have access to the Test environments to maximize time in resolving issues and providing end user support?
17Integrated Project Requirements"Safety" tabOSOH-6What Document Management solutions needs to be supported? There are references to "Must interface with SharePoint" which version, and hosted where?
18Integrated Project Requirements"Safety" tabOSOH-36
OSOH-37What are the desired SLAs for Disaster Recovery / Recovery Point Objective, or any other SLAs related to the need to "load backup media" and "restore system data"?
19Integrated Project Requirements"Safety" tabOSOH-91How will the system be expected to interact with Faxes?
20Integrated Project Requirements"Safety" tabOSOH-122.2.1
In what capacity are non-employee users accessing the system? How are they expected to access information from the system?
21Integrated Project Requirements"Safety" tabOSOH-126.4
Can FS provide an example of a system-generated graphic/visual the user should be able to export?
22Integrated Project Requirements"Safety" tabOSOH-168

OSOH-169

With what frequency does FS expect exisiting templates to need changing, or new templates to be added?
23Integrated Project Requirements"Safety" tabOSOH-51
What's an example of a "user-defined" formula?

File details come from the government source that posted it. Updated .