C04_Attachment 1 SOI.pdf

PDF 68 KB Posted

Attached to
Temp HVAC for the National Center Applied Plant Protection (NCAPP)
Solicitation number
12639526Q0269
Issued by

About this file

This is a Statement of Intent (SOI) that outlines the requirements for industrial equipment and supplies on a 12-month basis. The solicitation lists eight line items with estimated quantities and pay units, all priced on a monthly (MO) basis except for one lump sum (LS) item.

The required items include: miscellaneous supplies (1 LS unit), a generator (12 MO), two 50-65 ton industrial air conditioners with heat rated at 460V (12 MO), banded 5-wire cable in 50-foot lengths (12 MO), a double-wall fuel tank with 500-550 gallon capacity and pump (12 MO), a 100-gallon DEF autofill tank (12 MO), 20" by 25-foot A/C ducting (12 MO), and a 12/3 gauge extension cord in 25-foot length (12 MO). The unit costs and total contract values have not been populated in this template. A grand total line is included for the complete contract value, which remains to be calculated once pricing is submitted.

View the file

Other files

File Type Posted
C04_Attachment 2 Statement of Work.pdf PDF
C04_12639526Q0269.pdf PDF
C04_Attachment 4 Specification.pdf PDF
C04_Attachment 3 Building SPECS.pdf PDF
C04_Attachment 2 Statement of Work.pdf PDF
C04_12639526Q0269.pdf PDF
C04_Attachment 1 SOI.pdf PDF
C04_12639526Q0269.pdf PDF
C04_Attachment 1 SOI.pdf PDF
C04_Attachment 2 Statement of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI

SAM UEI:

Item Number

Description EST

QTY

Pay Unit

Unit Cost

Total

1 MISC 1 LS

2 Generator 12 MO 3 Two (2) 50-65 Ton Industrial Air

Conditioner With Heat, 460V

12 MO

4 CABLE BANDED 5 WIRE 50' 12 MO

5 TANK FUEL DOUBLE WALL 500-550 GAL

W/PUMP

12 MO

6 TANK DEF AUTOFILL 100 GAL 12 MO

7 A/C DUCTING 20" X 25' 12 MO

8 EXTENSION CORD 12/3 25' 12 MO

GRAND

TOTAL

SAM UEI:
Description:
EST QTY:
Pay Unit:
1:
MISC:
1_2:
Unit CostLS:
TotalLS:
2:
Generator:
12:
Unit CostMO:
TotalMO:
3:
12_2:
Unit CostMO_2:
TotalMO_2:
4:
CABLE BANDED 5 WIRE 50:
12_3:
Unit CostMO_3:
TotalMO_3:
5:
12_4:
Unit CostMO_4:
TotalMO_4:
6:
12_5:
Unit CostMO_5:
TotalMO_5:
7:
AC DUCTING 20 X 25:
12_6:
Unit CostMO_6:
TotalMO_6:
12_7:
Unit CostMO_7:
TotalMO_7:
8Row1:
EXTENSION CORD 123 25Row1:
12Row1:
MOGRAND TOTAL:
Unit CostGRAND TOTAL:
TotalGRAND TOTAL:

File details come from the government source that posted it. Updated .