This is a Statement of Intent (SOI) pricing template for federal contract equipment and supplies. The document outlines eight line items required over a 12-month period, with all quantities and payment units specified. Item 1 is miscellaneous equipment on a lump sum (LS) basis. Items 2 through 8 are priced on a monthly (MO) basis for 12-month durations and include: one generator; two 60-ton air conditioning units with heat rated at 480V; cable banded 5-wire in 50-foot lengths; a double-wall fuel tank with 500-550 gallon capacity and pump; a 100-gallon DEF autofill tank; 20-inch by 25-foot A/C ducting; and a 12/3 gauge 25-foot extension cord. The template includes columns for unit costs and total pricing, though no specific prices are populated in this version. The document references a SAM UEI identifier field, indicating this is for federal contracting purposes. A grand total line is provided for aggregate pricing across all line items.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
SAM UEI:
Item Number
Description EST
QTY
Pay Unit
Unit Cost
Total
1 MISC 1 LS
2 Generator 12 MO 3 Two (2) AIR CONDITION 60 TON WITH
HEAT 480V
12 MO
4 CABLE BANDED 5 WIRE 50' 12 MO
5 TANK FUEL DOUBLE WALL 500-550 GAL
W/PUMP
12 MO
6 TANK DEF AUTOFILL 100 GAL 12 MO
7 A/C DUCTING 20" X 25' 12 MO
8 EXTENSION CORD 12/3 25' 12 MO
GRAND
TOTAL
| SAM UEI: |
| Description: |
| EST QTY: |
| Pay Unit: |
| 1: |
| MISC: |
| 1_2: |
| Unit CostLS: |
| TotalLS: |
| 2: |
| Generator: |
| 12: |
| Unit CostMO: |
| TotalMO: |
| 3: |
| 12_2: |
| Unit CostMO_2: |
| TotalMO_2: |
| 4: |
| CABLE BANDED 5 WIRE 50: |
| 12_3: |
| Unit CostMO_3: |
| TotalMO_3: |
| 5: |
| 12_4: |
| Unit CostMO_4: |
| TotalMO_4: |
| 6: |
| 12_5: |
| Unit CostMO_5: |
| TotalMO_5: |
| 7: |
| AC DUCTING 20 X 25: |
| 12_6: |
| Unit CostMO_6: |
| TotalMO_6: |
| 12_7: |
| Unit CostMO_7: |
| TotalMO_7: |
| 8Row1: |
| EXTENSION CORD 123 25Row1: |
| 12Row1: |
| MOGRAND TOTAL: |
| Unit CostGRAND TOTAL: |
| TotalGRAND TOTAL: |