233423 - HVAC Power Ventilators.pdf
PDF 115 KB Posted
- Solicitation number
- 12639525R0015
About this file
This technical specification document outlines requirements for HVAC Power Ventilators for the USDA APHIS PPQ Moore Airfield rehabilitation project located in Edinburg, TX, scheduled for 2025. The document details specifications for two primary ventilation equipment types: ceiling-mounted ventilators and in-line centrifugal fans, with acceptable manufacturers including ACME Engineering, Carnes Company HVAC, Loren Cook Company, New York Blower Company, Penn Ventilation, and Greenheck Fan Corp. Key technical requirements include steel housing with acoustic insulation, centrifugal wheels directly mounted on motor shafts, integral backdraft dampers, and optional accessories like variable-speed motor controllers and vibration isolators.
The specification provides comprehensive installation, startup, and quality control requirements, mandating that a factory-authorized service representative perform startup services, verify proper installation and operation, and train the owner's maintenance personnel. Critical installation aspects include proper mounting (suspended from structure using steel wire or metal straps), electrical and control connections, damper adjustments, and thorough testing to ensure proper motor rotation, fan wheel operation, and overall system performance. The document emphasizes compliance with various standards including NFPA, ASHRAE, AMCA, and NEMA regulations for electrical components, fan performance, and sound ratings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12639525R0015-0005.pdf | ||
| USDAAPHIS_MABCA BID RFI LOG (09.05.25).xlsx | XLSX spreadsheet | |
| 12639525R0015-0004.pdf | ||
| LIMITED WARRANTY AGREEMENT 2020.pdf | ||
| USDAAPHIS_MABCA BID RFI LOG (09.04.25).xlsx | XLSX spreadsheet | |
| Lapolla 10-year warranty.pdf | ||
| 12639525R0015-0003.pdf | ||
| 19-1977-USDA-MoorefieldHanger-AsbRep.pdf | ||
| 102800 - Toilet Bath and Laundry Accessories.pdf | ||
| 233439 - High-Volume_Low-Speed Fans.pdf | ||
| USDA-MoorefieldHanger-Lapolla 10-Year Roof Warranty.pdf | ||
| RFI Log.xlsx | XLSX spreadsheet | |
| 12639525R0015-0002.pdf | ||
| Hangar Renovations Site Visit Attendance.pdf | ||
| Questions_Answers 2025_07_28.docx | DOCX document | |
| 12639525R0015-0001.pdf | ||
| 12639525R0015.pdf | ||
| Atch 1_SOW Hangar Construction.docx | DOCX document | |
| Atch 3_Specifications 2025Jan17.pdf | ||
| Atch 2_Federal Construction Wage Rates_Hidalgo Cty.pdf | ||
| Atch 4_Drawings 2025Jan17.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rehabilitate Aircraft Hangar USDAAPHIS_MAB
USDA APHIS PPQ Moore Airfield 2025
Edinburg, TX 100%
HVAC POWER VENTILATORS 233423 - 1
SECTION 233423 - HVAC POWER VENTILATORS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Ceiling-mounted ventilators.
2. Inline Centrifugal Fans
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings:
1. Include plans, elevations, sections, and attachment details.
2. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.
3. Include diagrams for power, signal, and control wiring.
4. Design Calculations: Calculate requirements for selecting vibration isolators.
1.3 INFORMATIONAL SUBMITTALS
A. Field quality-control reports.
1.4 CLOSEOUT SUBMITTALS
A. Operation and maintenance data.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by an NRTL, and marked for intended location and application.
B. NFPA Compliance: Comply with NFPA 90A for design, fabrication, and installation of unit components.
HVAC POWER VENTILATORS 233423 - 2
C. ASHRAE 62.1 Compliance: Applicable requirements in ASHRAE 62.1, Section 5 - "Systems and Equipment" and Section 7 - "Construction and Startup."
D. ASHRAE/IES 90.1 Compliance: Applicable requirements in ASHRAE/IES 90.1, Section 6 - "Heating, Ventilating, and Air-Conditioning."
2.2 CEILING-MOUNTED VENTILATORS
These units are factory assembled with one or more centrifugal wheels of up to 12 inches (300
mm) wide, directly connected to motor, enclosed in housing, with inlet grille and integral backdraft damper; AMCA rated.
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. ACME Engineering and Manufacturing Company.
2. Carnes Company HVAC.
3. Loren Cook Company.
4. New York Blower Company (The).
5. Penn Ventilation.
6. Greenheck Fan Corp.
B. Housing: Steel, lined with acoustical insulation.
C. Fan Wheel: Centrifugal wheels directly mounted on motor shaft. Fan shrouds, motor, and fan wheel removable for service.
D. Back-draft damper: Integral.
E. Grille: Painted aluminum, louvered grille with flange on intake and thumbscrew or spring retainer attachment to fan housing.
F. Electrical Requirements: Junction box for electrical connection on housing and receptacle for motor plug-in.
G. Accessories:
Accessories listed in subparagraphs below are optional features.
1. Variable-Frequency Motor Controller: Solid-state control to reduce speed from 100 to less than 50 percent.
2. Manual Starter Switch: Single-pole rocker switch assembly with cover and pilot light.
3. Time-Delay Switch: Assembly with single-pole rocker switch, timer, and cover plate.
4. Filter: Washable aluminum to fit between fan and grille.
5. Isolation: Rubber-in-shear vibration isolators.
6. Manufacturer's standard roof jack or wall cap, and transition fittings.
HVAC POWER VENTILATORS 233423 - 3
2.3 IN-LINE CENTRIFUGAL FANS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. ACME Engineering and Manufacturing Company.
2. Carnes Company HVAC.
3. Loren Cook Company.
4. New York Blower Company (The).
5. Penn Ventilation.
6. Greenheck Fan Corp.
B. Description: In-line, direct-driven centrifugal fans consisting of housing, wheel, outlet guide vanes, fan shaft, bearings, motor and disconnect switch, drive assembly, mounting brackets, and accessories.
C. Housing: Split, spun aluminum with aluminum straightening vanes, inlet and outlet flanges, and support bracket adaptable to floor, side wall, or ceiling mounting.
D. Direct-Driven Units: Motor mounted in airstream, factory wired to disconnect switch located on outside of fan housing; with wheel, inlet cone, and motor on swing-out service door.
E. Fan Wheels: Aluminum, airfoil blades welded to aluminum hub.
F. Accessories:
Retain accessories in subparagraphs below required for Project.
1. Variable-Speed Controller: Solid-state control to reduce speed from 100 to less than 50 percent.
2. Companion Flanges: For inlet and outlet duct connections.
3. Vibration Isolators:
a. Type: Elastomeric hangers.
b. Static Deflection: 1 inch (25 mm).
2.4 MOTORS
A. Comply with NEMA designation, temperature rating, service factor, and efficiency requirements for motors specified in Section 230500 "Common Work Results for
HVAC."
1. Motor Sizes: Minimum size as indicated. If not indicated, large enough so driven load will not require motor to operate in service factor range above 1.0.
HVAC POWER VENTILATORS 233423 - 4
2.5 SOURCE QUALITY CONTROL
A. Sound-Power Level Ratings: Comply with AMCA 301, "Methods for Calculating Fan Sound Ratings from Laboratory Test Data." Factory test fans according to AMCA 300, "Reverberant Room Method for Sound Testing of Fans." Label fans with the AMCA- Certified Ratings Seal.
B. Fan Performance Ratings: Establish flow rate, pressure, power, air density, speed of rotation, and efficiency by factory tests and ratings according to AMCA 210, "Laboratory Methods of Testing Fans for Rating."
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Install power ventilators level and plumb.
B. Equipment Mounting:
1. Ceiling Units: Suspend units from structure; use steel wire or metal straps.
C. Install units with clearances for service and maintenance.
D. Label units according to requirements specified in Section 230553 "Identification for HVAC Piping and Equipment."
3.2 DUCTWORK CONNECTIONS
A. Drawings indicate general arrangement of ducts and duct accessories. Make final duct connections with flexible connectors. Flexible connectors are specified in Section 233300 "Air Duct Accessories."
3.3 ELECTRICAL CONNECTIONS
A. Connect wiring according to Section 260519 "Low-Voltage Electrical Power Conductors and Cables."
B. Ground equipment according to Section 260526 "Grounding and Bonding for Electrical Systems."
C. Install electrical devices furnished by manufacturer, but not factory mounted, according to NFPA 70 and NECA 1.
HVAC POWER VENTILATORS 233423 - 5
1. Nameplate shall be laminated acrylic or melamine plastic signs with a black background and engraved white letters at least 1/2 inch (13 mm) high.
3.4 CONTROL CONNECTIONS
A. Install control and electrical power wiring to field-mounted control devices.
B. Connect control wiring according to Section 260523 "Control-Voltage Electrical Power Cables."
3.5 STARTUP SERVICE:
A. Engage a factory-authorized service representative to perform startup service.
1. Complete installation and startup checks in accordance with manufacturer's written instructions.
2. Verify that shipping, blocking, and bracing are removed.
3. Verify that unit is secure on mountings and supporting devices and that connections to ducts and electrical components are complete. Verify that proper thermal-overload protection is installed in motors, starters, and disconnect switches.
4. Verify that cleaning and adjusting are complete.
5. For direct-drive fans, verify proper motor rotation direction and verify fan wheel free rotation and smooth bearing operation.
6. Adjust damper linkages for proper damper operation.
7. Verify lubrication for bearings and other moving parts.
8. Verify that manual and automatic volume control and fire and smoke dampers in connected ductwork systems are in fully open position.
9. Disable automatic temperature-control operators, energize motor and confirm proper motor rotation and unit operation, adjust fan to indicated rpm, and measure and record motor voltage and amperage.
10. Shut unit down and reconnect automatic temperature-control operators.
11. Remove and replace malfunctioning units and retest as specified above.
3.6 ADJUSTING
A. Adjust damper linkages for proper damper operation.
B. Lubricate bearings.
C. Comply with requirements in Section 230593 "Testing, Adjusting, and Balancing for
HVAC."
HVAC POWER VENTILATORS 233423 - 6
3.7 CLEANING
A. After completing system installation and testing, adjusting, and balancing and after completing startup service, clean fans internally to remove foreign material and construction dirt and dust.
3.8 FIELD QUALITY CONTROL
A. Perform tests and inspections with the assistance of a factory-authorized service representative.
1. Fan Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation.
2. Test and adjust controls and safeties.
3. Fans and components will be considered defective if they do not pass tests and inspections.
4. Prepare test and inspection reports.
3.9 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain centrifugal fans.