OSP Boiler Plant Fire Escape
Solicitation number
S-29100-00012629
Issued by
Marion County, Oregon

About this file

This Statement of Work document outlines a project for the Oregon Department of Corrections (DOC) to improve safety at the Oregon State Penitentiary (OSP) boiler plant by installing a secondary fire escape from the second-floor control room. The project involves modifying the boiler plant building by installing a metal platform and stairs leading from the control room to the ground outside, replacing an existing wall and window panel with a door to access the new escape route. The scope of work includes site preparation, erosion control, demolition of an existing glass curtain wall, cutting and preparing a new door opening, concrete pad installation, structural steel fabrication and installation, infill of glass curtain wall, door and hardware installation, final grading, debris removal, and restoration of disturbed areas through mulching and seeding.

The document explicitly excludes electrical work, relocation of an existing fuel tank and fence, and relocation of an existing storm drain line from the scope of work. No pricing terms, set-asides, funding requirements, or contract duration details are provided in this document.

View the file

Other files

File Type Posted
12629 OSP Boiler Plant Fire Escape_Plans.pdf PDF
12630_Att B_Technical Specs.pdf PDF
6964 Contract_Executed.pdf PDF
ITB~9.pdf PDF
6964 NOITA.pdf PDF
12629 ADDENDA 2.pdf PDF
12629 Plan Holder list.pdf PDF
12629 ITB_GTC_SGC_SPECS.pdf PDF
12629 ADDENDA 1.pdf PDF
12629 Bid Tab.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

STATEMENT OF WORK

OREGON STATE PENITENTIARY (OSP)

CONTROL ROOM FIRE ESCAPE

BACKGROUND AND PROJECT DESCRIPTION

The DOC wishes to improve safety at the Oregon State Penitentiary (OSP) boiler plant. A recent leak at the OSP boiler plant identified some desired system improvements, including the need for a fire escape from the second-floor control room. The only egress currently available from the control room is via an interior set of stairs. If there is a fire or other emergency inside the boiler plant, it could be necessary to escape via a secondary route.

This project will modify the boiler plant building to allow for a secondary exit. It will consist of a metal platform and stairs leading from the control room to the ground outside the building. The existing wall and window panel will be replaced with a door to access the platform and stairs.

SCOPE OF SERVICES

The awarded contractor shall perform the following work:

Project Scope

- General site preparation and erosion control.

- Demolition of an existing glass curtain wall.

- Cutting in a new door opening.

- Site preparation for new concrete slabs.

- Installation of new concrete pads.

- Structural steel fabrication and installation.

- Prepare new door opening.

- Infill glass curtain wall.

- Install new door and hardware.

- Final grading.

- Remove excess soil and demolition debris.

- Mulching and seeding all disturbed grassy areas.

Work not included in this project

- Electrical work

- Relocation of existing fuel tank and fence.

- Relocation of existing storm drain line routed through the work area.