12629 ADDENDA 1.pdf
PDF 202 KB Posted
- Attached to
- OSP Boiler Plant Fire Escape
- Solicitation number
- S-29100-00012629
- Issued by
- Marion County, Oregon
About this file
This document is Addendum #1 for Solicitation #S-29100-00012629, issued by the Oregon Department of Corrections Purchasing Section for the OSP Boiler Plant Fire Escape project. The addendum, dated 3/24/2025, provides two key clarifications to the original bid specifications: first, the owner may agree to a cost increase via change order if tariff-related occurrences impact material costs, with proper verification and documentation; second, the contractor will be responsible for X-raying the concrete prior to doorway demolition to determine precise rebar location and identify any electrical wires or conduits within the concrete wall section.
The addendum requires bidders to sign and return the document by the bid closing date and time, with a warning that failure to do so may result in bid rejection. This addendum represents a material change to the Invitation to Bid (ITB) and must be acknowledged formally by potential contractors. The document is marked as "Level 3 - Restricted" and contains contact information for Dustin M. Sculatti in the Purchasing Section, located at 3601 State Street, Suite 280, Salem, OR 97301-5780.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12629 OSP Boiler Plant Fire Escape_Plans.pdf | ||
| 12630_Att B_Technical Specs.pdf | ||
| 6964 Contract_Executed.pdf | ||
| ITB~9.pdf | ||
| 12629 OSP Control Room Fire Escape_SOW .pdf | ||
| 6964 NOITA.pdf | ||
| 12629 ADDENDA 2.pdf | ||
| 12629 Plan Holder list.pdf | ||
| 12629 ITB_GTC_SGC_SPECS.pdf | ||
| 12629 Bid Tab.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Oregon Tina Kotek, Governor
Level 3 - Restricted
Department of Corrections Purchasing Section
3601 State Street, Suite 280 Salem, OR 97301-5780
(503) 510-5285 Dustin.m.sculatti@doc.oregon.gov
3/24/2025
ADDENDUM #1
For # S-29100-00012629
OSP Boiler Plant Fire Escape
Below you will find Revisions, clarifications, deletions and/or additions to the bid specifications. This addendum modifies the related Invitation to Bid only to the extent specifically indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force and effect.
This addendum shall be added to and become part of the original Invitation to Bid.
Item #1: Owner Clarification/Revision: If a tariff related occurrence is imposed during the life of the contract that affects materials costs, the Owner may agree to an increase of cost via change order. Tariff increases must be verified and documented before acceptance.
Item #2: Owner Clarification: Contractor will be responsible for X-raying the concrete prior to demolition for the doorway. This X-ray will help determine the exact rebar location and the presence of electrical wires/conduit in the concrete section of the wall.
Oregon Tina Kotek, Governor
Level 3 - Restricted
Department of Corrections Purchasing Section
3601 State Street, Suite 280 Salem, OR 97301-5780
(503) 510-5285 Dustin.m.sculatti@doc.oregon.gov
This addendum represents a material change to the ITB and is required to be signed and returned by the Bid Closing Date and Time. Failure to do so may result in bid rejection.
Company Name: ________________________________________________________
Authorized Signature: ____________________________________________________
Date: _______________________________________
| 3/24/2025 |
| ADDENDUM #1 |
| For # S-29100-00012629 |
File details come from the government source that posted it. Updated .