C04_Attachment 1 - Schedule of Items.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Loleta Water System Upgrades Federal contract opportunity
Solicitation number
12445526Q0132
Issued by
Department of Agriculture Forest Service

About this file

This is a Schedule of Items (pricing template) for the Loleta Water System Improvements project under USDA Forest Service solicitation 12445526Q0132. The schedule lists 19 line items organized as a lump sum quantity (LSQ) or designated quantity (DQ) basis, with quantities and unit pricing to be supplied by bidders. Key work items include mobilization, selective demolition, furnish and installation of a new well house with all piping and fixtures, water line installation in three sizes (1" HDPE, 2" HDPE, and 4" PVC at quantities of 60, 615, and 45 linear feet respectively), valve box and spigot assemblies (2 spigots required), well modifications, electrical work in two phases (to meter and from meter), pump yield and pressure testing, system chlorination and water quality testing, site restoration, and commissioning of new work.

This Request for Quotation (RFQ) is a Total Small Business Set-Aside with a $45 million size standard under NAICS code 237110. An organized site visit is scheduled for September 30, 2026, at 1:00 PM ET at the Loleta Recreation Area. Questions must be submitted by email to christopher.malley@usda.gov by October 5, 2026, at 1:00 PM ET, and quotations are due no later than October 12, 2026, at 1:00 PM ET, submitted electronically to christopher.malley@usda.gov and pps.proposals@usda.gov.

View the file

Other files for this federal contract opportunity

Other files attached to Loleta Water System Upgrades, newest first.
File Type Posted
12445526Q0132 Amendment 0001 - Extension.pdf PDF
PreBid_SignIn.pdf PDF
C04_Attachment 5 - Wage Rate Heavy.pdf PDF
12445526Q0132 - Loleta Water Systems Improvements.pdf PDF
C04_Attachment 3 - Loleta Design Drawings.pdf PDF
C04_Attachment 2 - Loleta Design Specs.pdf PDF
C04_Attachment 1 - Schedule of Items.xlsx XLSX spreadsheet
C04_Attachment 4 - Wage Rate Building.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Loleta Water System Improvements
Item NumberDescriptionMeasurement MethodPay UnitQtyUnit PriceTotal
0001MobilizationLSQLS1
0002Selective demolitionLSQLS1
0003Furnish & install new well houseLSQLS1
0004Furnish & install all new water piping & fixtures in new well houseLSQLS1
0005Furnish & install 1” HDPE water lineDQLF60
0006Furnish & install 2” HDPE water lineDQLF615
0007Furnish & install 4” PVC water lineDQLF45
0008Furnish & install valve boxLSQLS1
0009Furnish & install spigot assemblyDQEA2
0010Furnish & install drainDQEA1
0011Well modificationsLSQLS1
0012Electrical work allowance – to meterLSQLS1
0013Electrical work – from meterLSQLS1
0014Pump Yield TestLSQLS1
0015Pressure TestingLSQLS1
0016Chlorination of water systemLSQLS1
0017Well water quality testingLSQLS1
0018Site restoration / turf establishmentLSQLS1
0019Commissioning of new workLSQLS1
Total
CY=Cubic Yard DQ=Designated Quantity EA-Each LF=Linear Feet LS=Lump Sum LSQ=Lump Sum Quantity

File details come from the government source that posted it. Updated .