Attachment 1 - Schedule of Items REVISED.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Loleta Water System Upgrades
Solicitation number
12445526Q0132
Issued by

About this file

This is a Schedule of Items pricing sheet for the Loleta Water System Improvements project under USDA Forest Service RFQ Solicitation 12445526Q0132. The schedule itemizes 19 line items required for the water system upgrade project, with quantities and pay units specified for each. Lump sum items include mobilization, selective demolition, furnish and install of a new well house with piping and fixtures, well modifications, electrical work allowances (with a $10,000 maximum allowance specified for work to meter), pump yield testing, pressure testing, chlorination, water quality testing, site restoration, and commissioning. Designated quantity items include 60 linear feet of 1-inch HDPE water line, 615 linear feet of 2-inch HDPE water line, and 45 linear feet of 4-inch PVC water line, plus two spigot assemblies and one drain assembly (each priced by unit). Bidders are required to provide unit prices for items with designated quantities and lump sum pricing for remaining line items. This is a small business set-aside acquisition (NAICS 237110, $45M size standard) issued as a combined synopsis/solicitation for commercial items. Quotations are due no later than October 26, 2026, at 1:00 PM Eastern Time and must be submitted electronically to christopher.malley@usda.gov and pps.proposals@usda.gov. An organized site visit was held on September 30, 2026, and questions were due by October 5, 2026, with Amendment 0002 providing responses and extending the submission deadline.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Loleta Water System Improvements
Item NumberDescriptionMeasurement MethodPay UnitQtyUnit PriceTotal
0001MobilizationLSQLS1
0002Selective demolitionLSQLS1
0003Furnish & install new well houseLSQLS1
0004Furnish & install all new water piping & fixtures in new well houseLSQLS1
0005Furnish & install 1” HDPE water lineDQLF60
0006Furnish & install 2” HDPE water lineDQLF615
0007Furnish & install 4” PVC water lineDQLF45
0008Furnish & install valve boxLSQLS1
0009Furnish & install spigot assemblyDQEA2
0010Furnish & install drainDQEA1
0011Well modificationsLSQLS1
0012Electrical work allowance – to meter*LSQLS1$ 10,000.00$ 10,000.00
0013Electrical work – from meterLSQLS1
0014Pump Yield TestLSQLS1
0015Pressure TestingLSQLS1
0016Chlorination of water systemLSQLS1
0017Well water quality testingLSQLS1
0018Site restoration / turf establishmentLSQLS1
0019Commissioning of new workLSQLS1
Total
CY=Cubic Yard DQ=Designated Quantity EA-Each LF=Linear Feet LS=Lump Sum LSQ=Lump Sum Quantity
* The Allowance is not to exceed $10,000.