Att 02_Statement Of Work_260825.pdf

PDF 322 KB Posted

Attached to
Mondeaux Floor Refinishing
Solicitation number
12445526Q0121
Issued by

About this file

Summary: Statement of Work – Maple Floor Sanding and Refinishing

This Statement of Work (SOW) defines the requirements for sanding, repairing, and refinishing approximately 1,500 square feet of existing maple wood flooring at Mondeaux Lodge in Westboro, Wisconsin, encompassing both the Main Lodge and Quarters Building. The contractor shall provide all labor, equipment, tools, and incidental materials necessary to complete the work, with the Government furnishing only specified finishing materials: 1 gallon of Bona Pacific Filler, 4 gallons of Bona NaturalSeal, and 9 gallons of Bona Traffic HD Extra Matte. Work must be scheduled during fall 2026 to accommodate summer occupancy of the quarters building and shall be coordinated with the Government to minimize facility disruption.

The scope encompasses surface preparation, baseboard and trim management (removal and reinstallation required only if necessary), multi-step sanding to bare wood, wood filler application, and application of one coat of sealer followed by two coats of matte finish with light sanding between coats. The finished flooring must achieve uniform appearance with no visible sanding marks, edge transitions, or unfinished margins. The contractor must repair or replace any baseboards or trim damaged during work at no additional cost to the Government and properly dispose of all waste materials in compliance with federal, state, and local regulations. Work completion requires final Government inspection and acceptance, with the contractor responsible for correcting any deficiencies at no additional cost.

View the file

Other files

File Type Posted
Amd_0001-Sol_12445526Q0121.pdf PDF
Moneaux Floor Pictures_260819.docx DOCX document
Exhibit A_Mondeaux Floor Plans_12445526Q0121.pdf PDF
Q and A_12445526Q0121.xlsx XLSX spreadsheet
HOW TO FOLLOW PROJECTS ON SAM FOR EMAIL ALERTS.pdf PDF
Pictures_12445526Q0121.pdf PDF
Att 01_Schedule of Items_260805.docx DOCX document
Att 02_STATEMENT OF WORK_260623.pdf PDF
Sol_12445526Q0121.pdf PDF
Att 03_Wage Rates_260518.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Maple Floor Sanding and Refinishing Mondeaux Lodge – Main Lodge & Quarters Building W7969 Park Rd Westboro, WI 54490

1. Project Overview The purpose of this project is to sand, repair, and refinish existing maple wood flooring at the Mondeaux Lodge, including both the Main Lodge and the Quarters Building. The total project area is approximately 1,500 square feet.

2. Scope of Work The contractor shall provide all labor, equipment, tools, and incidental materials necessary to complete the following:

2.1 Surface preparation

Inspect all flooring surfaces prior to work Remove minor surface contaminants (adhesive, dirt, etc.) as needed.

Set and secure any protruding fasteners.

Protect adjacent surfaces, trim, walls, fixtures, and furnishings.

2.2 Baseboard, Trim, and Floor Edges

Removal of existing baseboards and associated trim is not required, provided the flooring can be properly sanded and refinished to the perimeter without removal.

Contractor shall sand and prepare the flooring as close to the walls, baseboards, and other fixed obstructions as practicable using appropriate edging or other equipment and methods.

The completed floor shall have a uniform and consistent appearance from edge to edge, with no readily visible perimeter band of existing finish, stain, discoloration, or unsanded flooring resulting from the sanding and refinishing process.

Contractor shall protect existing baseboards, trim, walls, and other adjacent surfaces from damage, abrasion, stain, and finish during the work.

Any baseboards or trim damaged by the Contractor during the performance shall be repaired or replaced to match existing at no additional cost to the Government.

If removal of a particular section of baseboard or trim is necessary to achieve the required finish result, the Contractor shall carefully remove and reinstall only the aƯected section(s). Reinstallation shall include fastening, minor repairs, and caulking as necessary to restore the original appearance.

2.3 Sanding

Sand all maple flooring to bare wood using industry-standard multi-step sanding process.

Progress through appropriate grit sequence to achieve a smooth, uniform surface.

Edge sand and detail all perimeter areas and corners.

Remove all sanding dust between passes.

2.4 Repairs and Filling

Apply wood filler (Bona Pacific Filler provided by the Government) to fill gaps, cracks, and minor surface defects.

Allow filler to cure and sand smooth to match surrounding surface.

2.5 Finishing system

Apply finish system using manufacturer-recommended methods and coverage rates:

o One (1) coat of Bona NaturalSeal o Two (2) coats of Bona TraƯic HD Extra Matte

Lightly sand between coats as required for proper adhesion.

Ensure even application with no visible lap marks, streaks, or defects.

2.6 Cleanup

Remove all dust, debris, and materials generated by the work Leave floors clean and ready for use upon cure time completion.

Properly dispose of waste materials oƯ-site in accordance with federal, state, and local regulations.

3. Government-Furnishes Materials (GFM) The Government will provide the following materials:

o 1 gallon Bona Pacific Filler o 4 gallons Bona NaturalSeal o 9 Gallons Bona TraƯic HD Extra Matte

The contractor shall be responsible for all additional materials required to complete the project.

4. Quality Requirements Finished floors shall have a uniform appearance with no visible sanding marks, chatter, swirl marks, or debris in the finish.

Finish shall be free of bubbles, streaks, or uneven sheen.

Work shall meet manufacturer recommendations and industry standards for hardwood floor refinishing.

Flooring shall be sanded and finished to the wall line with no visible edge transitions or unfinished margins.

5. Schedule

Work shall be coordinated with the Government to minimize disruption to facility operations.

Due to occupancy of the quarters building during the summer season, all work shall be scheduled to occur during the fall of 2026, unless otherwise approved by the Government.

Contractor shall provide a proposed schedule prior to starting work Adequate cure time shall be allowed between coats and prior to occupancy per manufacturer recommendations.

6. Access and Site Conditions The Government will provide access to both buildings during agreed-upon work hours.

Contractor shall verify site conditions and measurements prior to performing work.

Utilities (electric power) will be available on site.

7. Safety Requirements Contractor shall comply with all applicable safety regulations.

Maintain a safe work environment and control dust to the greatest extent practicable.

Use appropriate ventilation when applying finishes.

8. Acceptance Work will be considered complete upon final inspection and acceptance by the

Government.

Any deficiencies identified shall be corrected by the contractor at no additional cost to the

Government.

Schedule of Items (SOI) Item No.

Description Unit Qty Cost

Mobilization, site protection, baseboard removal/reinstallation, and preparation of existing maple flooring surfaces at the Mondeaux Lodge Main Lodge and Quarters Building.

LS 1

Sanding, filling, sealing, and application of finish system on approximately 1,500 square feet of existing maple flooring, including all labor, equipment, tools, and incidental materials necessary to complete the work in accordance with the Statement of Work. The Government will provide the following materials only:

1 gallon Bona Pacific Filler, 4 gallons Bona NaturalSeal, and 9 gallons Bona Traffic HD Extra Matte. The contractor shall provide all additional materials required to complete the project.

LS 1

Final cleanup, detailing, and disposal of waste materials generated by the project.

LS 1

TOTAL COST

File details come from the government source that posted it. Updated .