REVISED sheet A-4a plan sheet.pdf

PDF 329 KB Posted

Attached to
Canaan Mountain Road Repairs
Solicitation number
12445525B0012
Issued by

About this file

This document is a detailed project summary and schedule of items for the FR13 ERFO Road Project for the United States Department of Agriculture (USDA) Forest Service, specifically for the Monongahela National Forest. The summary includes comprehensive quantitative information for multiple construction and infrastructure elements, such as soil and erosion control, turf establishment, clearing and grubbing, excavation and embankment, road reconditioning, and various pipe installations (including 18-inch, 24-inch, and 42-inch HDPE pipes).

The document provides extensive technical specifications across multiple sections, including summaries for road grading, backfill, rip-rap, armor spec ditch aggregate, and crushed road aggregate. The drainage summary details pipe specifications, including size, thickness, length, and installation characteristics at different stations. Key materials and quantities are meticulously cataloged, with measurements noted in units such as linear feet (LF), cubic yards (CY), and tons (TON). The project appears to involve road infrastructure improvements, drainage system modifications, and potentially road reconstruction within the Monongahela National Forest area.

View the file

Other files

File Type Posted
FR13 RD REPAIR Q AND A 8-21-2025 UPDATED.docx DOCX document
REVISED sheet B-1a plan sheet.pdf PDF
REVISED BID SHEET.pdf PDF
FR13 RD REPAIR Q AND A 8-21-2025 (002).docx DOCX document
Site Visit Location Map FR13 Road Project.pdf PDF
12445525B0012.pdf PDF
2 FR13 S-O-W.docx DOCX document
7 FR13 ERFO 23 Road Project V3 final.pdf PDF
Davis Bacon.pdf PDF
SOI.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .