REVISED BID SHEET.pdf

PDF 143 KB Posted

Attached to
Canaan Mountain Road Repairs
Solicitation number
12445525B0012
Issued by

About this file

This is a Contractor Bid Sheet for the FR13 ERFO Project, detailing a comprehensive infrastructure and site development project. The bid sheet lists 15 line items covering various construction activities including mobilization, soil and erosion control, clearing and grubbing, excavation, embankment, pipe installation, and road reconditioning. Key quantities include 77 cubic yards of excavation and embankment, 2,455 tons of select backfill, 363 cubic yards of riprap placement, and multiple pipe installations ranging from 18-inch to 42-inch in High-Density Polyethylene (HDPE) and Heavy Wall Gauge (HWG) types. The project also includes temporary and permanent turf establishment, geotextile installation, and gabion stone placement, with most measurement methods using Authorized Quantity (A.Q.) or Computed Quantity (C.Q.) approaches.

View the file

Other files

File Type Posted
FR13 RD REPAIR Q AND A 8-21-2025 UPDATED.docx DOCX document
REVISED sheet B-1a plan sheet.pdf PDF
REVISED sheet A-4a plan sheet.pdf PDF
FR13 RD REPAIR Q AND A 8-21-2025 (002).docx DOCX document
Site Visit Location Map FR13 Road Project.pdf PDF
12445525B0012.pdf PDF
2 FR13 S-O-W.docx DOCX document
7 FR13 ERFO 23 Road Project V3 final.pdf PDF
Davis Bacon.pdf PDF
SOI.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit Cost Total Cost 151 MOBILIZATION L.S. All 1

157.06 SOIL AND EROSION CONTROL (Filter Barrier, Fiber rolls)

C.Q. ft 165

157.12(b) Temporary turf establishment, hydraulic method L.S. All 1

157.13(a) Turf Establishment Permanent, hydraulic method L.S. All 1

201.01 CLEARING AND GRUBBING L.S. All 1

204.01 A EXCAVATION AND EMBANKMENT C.Q. CY 77

204.01 B

EXCAVATION AND EMBANKMENT, DITCHES (O.D.

AND L.O.D)

C.Q. LF 200

204.07 SELECT BACKFILL Minor Crushed Aggregate, comp. method 1, 1 1/2" CR

A.Q TON 2455

251.04 (a) Place Riprap, Accept. Meth. A, Class 3 A.Q CY 363

302-A Minor Crushed Aggregate, comp. method 1, AASHTO #1)

A.Q TON 43.0

302-B Minor Crushed Aggregate, comp. method 1, 1 1/2" CR / Select Back Fill

A.Q TON 1331

302-C GABION STONE A.Q TON 133

303 Road reconditioning A.Q MILE 0.75

602 (18) A 18 inch HWG pipe, Type S, Method B A.Q LF 114 602 (24) A 24 inch HWG pipe, Type S, Method B A.Q LF 58 602 (24) B 24 inch HDPE pipe, Type S, Method B A.Q LF 74 602 (30) 30 inch HDPE pipe, Type S, Method B A.Q LF 30 602 (42) 42 inch HDPE pipe, Type S, Method B A.Q LF 58

714.01 NON-WOVEN GEOTEXTILE D.Q. SY 295

Total PW

Contractor Bid Sheet - FR13 ERFO Project

Item No. Description Method Measure Unit Quantity Public Works

File details come from the government source that posted it. Updated .