FR13 RD REPAIR Q AND A 8-21-2025 (002).docx
DOCX document 16 KB Posted
- Attached to
- Canaan Mountain Road Repairs
- Solicitation number
- 12445525B0012
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Questions and Answers (Q&A) file from a site visit for the FR13 Road Repair Project, conducted by the U.S. Department of Agriculture Forest Service on the Monongahela National Forest in West Virginia. The project involves repairing drainage areas damaged by a 2023 flood event, with key details including a 120-day completion timeline, bid submission deadline of September 5, 2025, and specific requirements such as using drip pans for equipment, providing a portable toilet on-site, and using weed-free seed and straw for restoration.
The solicitation is set aside for small businesses and follows Davis-Bacon wage standards, with bids to be emailed to Contracting Officer Michelle Reed (michelle.r.reed@usda.gov) and Contracting Officer's Representative Leo Weese (leo.weese@usda.gov). The project scope includes removing and installing culverts, constructing ditches, grading roads, elevating roadbeds for drainage, and building head walls. The government will provide six Class III barricades and three road closure signs. Contractors must be active in SAM.gov to be eligible, and all bids must be submitted by the specified date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FR13 RD REPAIR Q AND A 8-21-2025 UPDATED.docx | DOCX document | |
| REVISED sheet B-1a plan sheet.pdf | ||
| REVISED BID SHEET.pdf | ||
| REVISED sheet A-4a plan sheet.pdf | ||
| Site Visit Location Map FR13 Road Project.pdf | ||
| 2 FR13 S-O-W.docx | DOCX document | |
| 12445525B0012.pdf | ||
| SOI.pdf | ||
| Davis Bacon.pdf | ||
| 7 FR13 ERFO 23 Road Project V3 final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ERFO FR13 ROAD REPAIR PROJECT
Q AND A
FROM SITE VISIT ON 8/20/2025 AT 10:00 ON SITE ON ROAD FR13
1.) HOW LONG OR TIME OR DAYS TO FINISH THE JOB? AFTER THE AWARD DAY THE CONTRACTOR WILL HAVE 120 DAYS TO COMPLETE THE PROJECT. THE WEATER COULD PLAY A ROLE AS WELL RAIN OR SNOW THIS MAY EXTEND THE CONTRACT SOME AS WELL.
2.) IS THERE AND OTHER WAYS INTO FR13? THERE’S ONLY ONE WAY IN AND ONE WAY OUT AND THIS WILL BE ON THE CANAAN SIDE WHERE THE SITE VISIT TOOK PLACE.
3.) DO WE NEED DRIP PANS FOR EQUIPMENT? YES THIS IS A GOOD IDEA SO WE DO NOT HAVE OIL SPILLS ON FOREST.
4.) WHEN AND WHERE DO WE TURN IN THE BIDS? YOU WILL EMAIL YOUR BIDS TO THE CO (michelle.r.reed@usda.gov) (MICHELLE REED) AND CC TO ME THE COR (leo.weese@usda.gov) (LEO WEESE)BY THE 5TH OF SEPTEMBER 2025.
5.) THE DRAINAGE SUMMARY ON PAGE A-4 IN THE PLANS THE ROCK FOR THE HEAD WALL AND OUTLET PAD ARE INCIDENTAL TO ITEM 602.
6.) THE GOVERNMENT WILL FURNISH 6 CLASS III BARRICADES AND 3 ROAD CLOSED SIGNS TO CLOSE THE ROAD DURING CONSTRUCTION.
7.) ARE THERE BATRHROOMS? NO AND CONTACTOR WILL NEED A PORTAPOTTY ON SITE THIS WILL FALL UNDER ITEM 151.
8.) WHAT TYPE OF SEED WILL WE NEED? WEED FREE SEED AND WEED FREE STRAW.
9.) A COPY OF ALL STONE TICKETS SHALL BE GIVEN TO THE COR.
NOTE:
IN THE PLANS SHEET A-1 AND B-1 HAS CORRECTION PLEASE LOOK AT NEW SHEETS A-1a AND B-1a FOR CORRECTIONS AND UPDATED SHEETS.