Solicitation No: 12445121R0016 / FAC 2021-05 effective March 10, 2021 Project Name: GWJ Bolar Mountain WW Plant Replacement

Table of Contents

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

B.1 SCHEDULE OF ITEMS (CONTINUED)

B.1 SCHEDULE OF ITEMS (CONTINUED)

B.2 SCHEDULE NOTES

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

C.2 PROJECT LOCATON

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

C.4 TECHNICAL SPECIFICATIONS

C.5 CLAUSES

SECTION D--PACKAGING AND MARKING

D-1 PACKING AND MARKING

D-2 PROJECT LABELING FOR OFFICIAL COORESPONDENCE

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 CLAUSES

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

J.1 ATTACHMENTS

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND

OTHER STATEMENTS OF OFFERORS OR RESPONDENTS

K.1 PROVISIONS

SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

L.1 PROVISIONS

SECTION M--EVALUATION FACTORS FOR AWARD

M.1 PROVISIONS

M.2 PROPOSAL EVALUATION

M.3 TECHNICAL EVALUATION FACTORS

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

Base Proposal - Sugar Ridge Campground, Wastewater Treatment System, and Drip Field

ITEM

DESCRIPTION

METHOD

OF MEAS UNIT

QUAN

TITY

UNIT TOTAL AMOUNT

NO. PRICE

0001 Base Proposal (Wastewater Treatment System, Drip Field, and Sugar Ridge CG Force Main Connection)

10250-1 Construction Staking LSQ Lump Sum 1 $ XXXXX $

11900-1 Mobilization LSQ Lump Sum 1 $ XXXXX $

15100 Temporary Traffic Control LSQ Lump Sum 1 $ XXXXX $

23701-1 Sediment and Erosion Control Measures

LSQ Lump Sum 1 $ XXXXX $

221300-4 10,000 Gallon Concrete Septic Tank with Effluent Filter

AQ Each 1 $ $

221300-5 10,000 Gallon Concrete Equalization Tank with Duplex Pumps

AQ Each 1 $ $

221300-6 7,700 Gallon Concrete Recirculation Tanks with Pumps

AQ Each 2 $ $

221300-7 10,000 Gallon Concrete Dosing Tank with Duplex Pumps

AQ Each 2 $ $

221300-9 Sewerline (Pressurized) – 2-Inch PVC, Schedule 40 with Glued Joints

AQ Linear Feet 200 $ $

221300-10 Sewerline (Pressurized) – 4-Inch PVC, Schedule 40 with Glued Joints

AQ Linear Feet 10 $ $

221300-11 Pipe Sleeve – 6-Inch PVC, Schedule 40 with Glued Joints

AQ Linear 60 $ $

221300-12

Wastewater Treatment System Including E-Z Mods, Calcite Filter, Carbon Feed

LSQ Lump Sum 1 $ XXXXX $

221300-13

Drip Field Including Supply & Return Lines, Valves, Gauges, Air/Vacuum Breakers, Tree Clearing

LSQ Lump Sum 1 $ XXXXX $

ITEM

DESCRIPTION

METHOD

OF MEAS UNIT

QUAN

TITY

UNIT TOTAL AMOUNT

NO. PRICE

260500-1

Electrical System – Disconnection of Existing Wastewater System and Reconnection and Extension to New Wastewater System

LSQ Lump Sum 1 $ XXXXX $

312000-1 Special Bedding- Imported AQ Cubic Yard 10 $ $

312000-2 Pipe Zone Material - Imported

AQ Cubic Yard 10 $ $

312000-3 Above Pipe Zone Material

- Imported

AQ Cubic Yard 10 $ $

312010-1 Select Borrow - Imported AQ Cubic Yard 10 $ $

321200-1 Hot Asphalt Patching AQ Square Yard 20 $ $

329204 Drip Field Topsoil DQ Cubic Yard 2800 $ $

329206-1 Straw Placement, Seeding, & Fertilizing

LSQ Lump Sum 1 $ XXXXX $

TOTAL CONSTRUCTION BASE $ -

Service Base Proposal - Construction Inspection, O&M Manual, Sampling Plan, and Licensed Operator

221300-16 Construction Oversight, Inspection Report, O& M Manual, and Sampling Plan

LSQ Lump Sum 1 $ XXXXX $

221300-17 Licensed Operator, Site Visits, and Sampling

MO month 12 $ $

TOTAL SERVICE BASE $

TOTAL BASE

B.1 SCHEDULE OF ITEMS (CONTINUED)

ITEM

DESCRIPTION

METHOD OF

MEAS

UNIT QUANTITY

UNIT TOTAL AMOUNT

NO. PRICE

Option 0001 Cleaning and Video Inspection of Sewer Line, Manholes, Tanks, and Lift Stations

330130-A1

Cleaning and Inspection of Sewer line, Manholes and Inspection of Other Existing Wastewater Infrastructure

LSQ Lump Sum $ XXXXX $ XXXXX $

TOTAL OPTION 0001

B.1 SCHEDULE OF ITEMS (CONTINUED)

ITEM

DESCRIPTION

METHOD OF

MEAS

UNIT QUANTITY

UNIT TOTAL AMOUNT

NO. PRICE

Option 0002 Sugar Ridge Campground Wastewater 10250-B1 Construction Staking LSQ Lump Sum 1 $ XXXXX $

11900-B1 Mobilization LSQ Lump Sum 1 $ XXXXX $

23701-B1 Sediment and Erosion Control Measures

LSQ Lump Sum 1 $ XXXXX $

24102-B1 Removal and Disposal of Existing Structures – Tanks, Boxes, Piping

LSQ Lump Sum 1 $ XXXXX $

221300-B1 1,500 Gallon Top Seam Concrete Septic Tank

AQ Each 3 $ $

221300-B2 1,500 Gallon Top Seam Concrete Septic Tank with Effluent Filter

AQ Each 3 $ $

221300-B3 2,000 Gallon Top Seam Concrete Pump Tank with Duplex Pumps

AQ Each 1 $ $

221300-B8 Sewerline (Gravity) – 4- Inch PVC, Schedule 40 with Glued Joints

AQ LF 1,330 $ $

221300-B9 Sewerline (Pressurized)

– 2-Inch PVC, Schedule 40 with Glued Joints

AQ Linear Feet 1,330 $ $

221300-B14 4-Inch PVC Cleanout Below Grade In Concrete Box

AQ Each 10 $ $

221300-B15 4-Inch Cast-Iron Cleanout

AQ Each 10 $ $

260500-B1

Electrical System – Disconnection of Existing Wastewater System and Reconnection and Extension to New Wastewater System

LSQ Lump Sum 1 $ XXXXX $

312000-B1 Special Bedding- Imported

AQ Cubic Yard 100 $ $

312000-B2 Pipe Zone Material - Imported AQ Cubic Yard 10 $ $

312000-B3 Above Pipe Zone Material - Imported

AQ Cubic Yard 10 $ $

312010-B1 Select Borrow - Imported

AQ Cubic Yard 60 $ $

321200-B1 Hot Asphalt Patching AQ Square Yard

120 $ $

329206-B1 Straw Placement, Seeding, & Fertilizing

LSQ Lump Sum 1 $ XXXXX $

TOTAL OPTION 0002

B.1 SCHEDULE OF ITEMS (CONTINUED)

ITEM

DESCRIPTION

METHOD OF

MEAS UNIT QUANTITY

UNIT TOTAL AMOUNT

NO. PRICE

Option 0003 Campground #1, Picnic Area, and Beach Wastewater 10250-C1 Construction Staking LSQ Lump Sum $ XXXXX $ XXXXX $

11900-C1 Mobilization LSQ Lump Sum $ XXXXX $ XXXXX $

15100-C2 Temporary Traffic Control

LSQ Lump Sum $ XXXXX $ XXXXX $

23701-C2 Sediment and Erosion Control Measures LSQ Lump Sum $ XXXXX $ XXXXX $

24102-C2 Removal and Disposal of Existing Structures – Tanks, Boxes, Piping

LSQ Lump Sum $ XXXXX $ XXXXX $

221300-C1 1,500 Gallon Top Seam Concrete Septic Tank

AQ Each 5 $ $

221300-C2 1,500 Gallon Top Seam Concrete Septic Tank with Effluent Filter

AQ Each 3 $ $

221300-C16 5,000 Gallon Top Seam Concrete Pump Tank with Duplex Pumps

AQ Each 1 $ $

221300-C8 Sewerline (Gravity) – 4- Inch PVC, Schedule 40 with Glued Joints

AQ LF 3,150 $ $

221300-C9 Sewerline (Pressurized)

– 2-Inch PVC, Schedule 40 with Glued Joints

AQ Linear Feet 2,730 $ $

221300-C14 4-Inch PVC Cleanout Below Grade In Concrete Box

AQ Each 15 $ $

221300-C15 4-Inch Cast-Iron Cleanout AQ Each 15 $ $

260500-C1

Electrical System – Disconnection of Existing Wastewater System and Reconnection and Extension to New Wastewater System

LSQ Lump Sum $ XXXXX $ XXXXX $

312000-C1 Special Bedding- Imported

AQ Cubic Yard 220 $ $

312000-C2 Pipe Zone Material - Imported AQ Cubic Yard 10 $ $

312000-C3 Above Pipe Zone Material - Imported

AQ Cubic Yard 10 $ $

312010-C1 Select Borrow - Imported AQ Cubic Yard 20 $ $

321200-C1 Hot Asphalt Patching AQ Square

Yard 30 $ $

329206-C1 Straw Placement, Seeding, & Fertilizing

LSQ Lump Sum $ XXXXX $ XXXXX $

TOTAL OPTION 0003

B.1 SCHEDULE OF ITEMS (CONTINUED)

ITEM

DESCRIPTION

METHOD

OF MEAS UNIT QTY

UNIT TOTAL AMOUNT

NO. PRICE

Option 0004 Campgrounds #2 and #3 Wastewater 10250-D1 Construction Staking LSQ Lump Sum $ XXXXX $ XXXXX $

11900-D1 Mobilization LSQ Lump Sum $ XXXXX $ XXXXX $

15100-D1 Temporary Traffic Control LSQ Lump Sum $ XXXXX $ XXXXX $

23701-D1 Sediment and Erosion Control Measures LSQ Lump Sum $ XXXXX $ XXXXX $

24102-D1 Removal and Disposal of Existing Structures – Tanks, Boxes, Piping LSQ Lump Sum $ XXXXX $ XXXXX $

221300-D1 1,500 Gallon Top Seam Concrete Septic Tank

AQ Each 4 $ $

221300-D2 1,500 Gallon Top Seam Concrete Septic Tank with Effluent Filter

AQ Each 2 $ $

221300-D17 2,000 Gallon Top Seam Concrete Pump Tank with Duplex Pumps

AQ Each 1 $ $

221300-D8 Sewerline (Gravity) – 4-Inch PVC, Schedule 40 with Glued Joints

AQ LF 1,400 $ $

221300-D9 Sewerline (Pressurized) – 2-Inch PVC, Schedule 40 with Glued Joints

AQ Linear Feet 6,180 $ $

221300-D11 Pipe Sleeve – 6-Inch PVC, Schedule 40 with Glued Joints

AQ Linear 60 $ $

221300-D14 4-Inch PVC Cleanout Below Grade In Concrete Box

AQ Each 10 $ $

221300-D15 4-Inch Cast-Iron Cleanout AQ Each 10 $ $

221312-D1 RV Dump Station Towers (Two Water and Two Sanitary)

AQ Each 4 $ $

260500-D1

Electrical System – Disconnection of Existing Wastewater System and Reconnection and Extension to New Wastewater System

LSQ Lump Sum $ XXXXX $ XXXXX $

312000-D1 Special Bedding- Imported AQ Cubic Yard 280 $ $

312000-D2 Pipe Zone Material - Imported AQ Cubic Yard 140 $ $

312000-D3 Above Pipe Zone Material - Imported AQ Cubic Yard 40 $ $

312010-D1 Select Borrow - Imported AQ Cubic Yard 140 $ $

321200-D1 Hot Asphalt Patching AQ Square Yard

130 $ $

329206-D1 Straw Placement, Seeding, & Fertilizing LSQ Lump Sum $ XXXXX $ XXXXX $

TOTAL OPTION 0004

B.1 SCHEDULE OF ITEMS (CONTINUED)

ITEM

NO.

DESCRIPTION TOTAL

AMOUNT

0001 0001 Base Proposal (Wastewater Treatment System, Drip Field, and Sugar Ridge CG Force Main Connection) $

0002 221300-16 Construction Oversight, Inspection Report, O& M Manual, and Sampling Plan

0003 221300-17 Licensed Operator, Site Visits, and Sampling $

0004 Option 0001* Cleaning and Video Inspection of Sewer Line $

0005 Option 0002* Sugar Ridge Campground Wastewater $

0006 Option 0003* Campground #1, Picnic Area, and Beach Wastewater

0007 Option 0004* Campgrounds #2 and #3 Wastewater

TOTAL $

* Option may be exercised up to 90 days after contract award

B.2 SCHEDULE NOTES

AQ-Actual Quantity DQ- Design Quantity LSQ-Lump Sum Quantity

Government reserves the right to exercise some/all options within 90 days of award

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

This project includes reconstruction of the wastewater system at the Bolar Mountain Recreation Area.

The work includes the decommissioning of existing wastewater infrastructure as indicated on the Drawings and installation of new gravity sewer, pressurized sewer, concrete septic/settling/equalization/recirculation/pumping/dosing tanks, cleanouts, pumps, electrical, wastewater treatment, and drip field. Work includes repair of asphalt roads, traffic control, compaction testing, field surveying/layout, construction staking, sewer line cleaning and video, clearing and grubbing, demolition and other work as indicated in the Drawings and specifications.

Upon the inspection results of sewerline, manholes, and lift stations the scope of work may be adjusted from total replacement of the wastewater systems in existing recreation facilities to partial replacement of those sections of the existing system that have deficiencies. It is generally unknown what condition the existing sewer line, manhole, and lift station components are in. Scope of work that may be added to repair deficiencies may include, but are not limited to, potholing and small section line repair, cured in place pipe (CIPP), slip lining, pipe bursting, measures to eliminate infiltration and inflow such as manhole or lift station grouting, and lift station refurbishment including lining, new pumps, piping, floats, controls, and electrical. These items will be addressed through modification if and when encountered.

C.2 PROJECT LOCATON

The project is located in the Warm Springs and James River Ranger Districts of the George Washington and Jefferson National Forests, Bath County, Virginia, 24484. From Covington, take 220 North to Highway 39 and turn left on Highway 39 to Highway 600 (Bolars Draft Road) and turn left on Highway

600. Turn right on Twin Ridge Drive which leads to the project site.

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

(f) Between $1,000,000 and $5,000,000.

C.4 TECHNICAL SPECIFICATIONS

The following specifications are included:

010100 SUMMARY OF WORK

010250 CONSTRUCTION STAKING

011250 MEASUREMENT AND PAYMENT

011900 MOBILIZATION

013300 SUBMITTAL PROCEDURES

014100 QUALITY CONTROL

015100 TEMPORARY TRAFFIC CONTROL

015500 GOVERNMENT FURNISHED MATERIAL (GFM)

017320 SELECTIVE DEMOLITION

022070 STONE BASE COURSE

022220 STRUCTURAL EXCAVATION, BACKFILL, AND COMPACTION

023701 SEDIMENT AND EROSION CONTROL MEASURES

024100 WASTE MATERIAL DISPOSAL

024102 REMOVAL AND DISPOSAL OF STRUCTURES AND OBSTRUCTIONS

033000 CAST IN-PLACE CONCRETE

072100 INSULATION

133402 UTILITY BOXES

221300 ONSITE WASTEWATER TREATMENT SYSTEMS

221312 SANITARY DUMP STATION

260500 COMMON WORK RESULTS FOR ELECTRICAL

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

262726 WIRING DEVICES

311000 CLEARING AND GRUBBING

312000 EARTHWORK

312010 SELECT BORROW

321200 HOT-MIX ASPHALT PAVING

321204 CRUSHED AGGREGATE BASE OR SURFACE COURSE

329204 TOPSOIL

329206 SEEDING

C.5 CLAUSES

452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

D-1 PACKING AND MARKING

All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.

D-2 PROJECT LABELING FOR OFFICIAL COORESPONDENCE

The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

52.242-14 Suspension of Work (APR 1984)

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 310 calendar days. The time stated for completion shall include final cleanup of the premises.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 CLAUSES

452.215-73 Post Award Conference (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held within 5 days after the date of contract award. The conference will be held via Microsoft Teams virtual and on-site if required by the COR.

G.1 INVOICES SHALL BE SUBMITTED TO:

The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in the previous communications from USDA and Treasury. All invoices are to be submitted via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm.

The successful offeror shall register at https://www.ipp.gov/vendors/enrollment-vendors.htm if they have not already established an account.

G.2 FOREST SERVICE REPRESENTATIVES:

Jay Tobin will serve as the Contracting Officer on the awarded contract. He shall have full warrant authority over all contract issues. He can be reached at jay.g.tobin@usda.gov.

A Contracting Officer Representative (COR) shall be appointed upon award. This delegation shall also contain his/her contact information.

https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm mailto:jay.g.tobin@usda.gov

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES

452.237-74 Key Personnel (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel:

§ Board for Waterworks and Wastewater Works Operators and Onsite Sewage System Professionals (WWWOOSSP Board) licensed Onsite Sewage System Installer

§ WWWOOSSP Board licensed Onsite Sewage System Operator § Site Superintendent § General Manager § Project Manager § Project Safety Manager/Officer § Quality Control Manager § Engineering Professionals § Land Surveyor

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52).204-1652 Department of Agriculture Acquisition Regulation (AGAR) Clauses: https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at:

https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm

52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-17 Contractor Employee Whistleblower Rights & Requirements to Inform Employees of

Whistleblower Rights (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-14 Service Contract Reporting Requirements (OCT 2016) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by

Kaspersky Lab and Other Covered Entities (JUL 2018) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or

Equipment (AUG 2020) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (JUN 2020) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.215-2 Audit and Records -- Negotiation (JUN 2020) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-8 Utilization of Small Business Concerns (OCT 2018) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar

52.219-28 Post Award Small Business Program Rerepresentation (NOV 2020) 52.222-3 Convict Labor (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirement (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (AUG 2018) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Pricing

Method) (AUG 2018) 52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-40 Notification of Employee Rights Under National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (OCT 2020) 52.222-54 Employment Eligibility Verification (OCT 2015) 52.222-55 Minimum Wages under Executive Order 13658 (NOV 2020) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2017) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts (SEP

2013) 52.223-3 Hazardous Material Identification and Material Safety Data Alt 1 (FEB 2021) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (AUG

2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991)

52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR

1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)

Alternate I (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)

Alternate I (APR 1984) Alternate II (APR 1984)

52.242-5 Payments to Small Business Subcontractors (JAN 2017) 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUN 2007) 52.244-6 Subcontracts for Commercial Items (NOV 2020) (DEVIATION APR 2020) 52.246-21 Warranty of Construction (MAR 1994) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012)--Alternate I (SEP

1996) 52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Removal of

Improvements) (APR 2012) 52.249-10 Default (Fixed-Price Construction) (APR 1984)

Alternate I (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991) 452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)

52.225-9 Buy American Act-Construction Materials (FEB 2021)

(a) Definitions. As used in this clause-

Commercially available off-the-shelf (COTS) item-

(1) Means any item of supply (including construction material) that is-

(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation

(FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the

Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means-

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if-

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the

United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. (1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

[Contracting Officer to list applicable excepted materials or indicate "none"]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute. (1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the

Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.

However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description Unit of Measure Quantity Price (dollars)* Item1:

Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______

Item2:

Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information.]

52.228-1 Proposal Guarantee (SEP 1996)

(a) Failure to furnish a proposal guarantee in the proper form and amount, by the time set for opening of proposals, may be cause for rejection of the proposal.

(b) The offeror shall furnish a proposal guarantee in the form of a firm commitment, e.g., proposal bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return proposal guarantees, other than proposal bonds –

(1) To unsuccessful offerors as soon as practicable after the opening of proposals, and (2) To the successful offeror upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the proposal as accepted.

(c) The amount of the proposal guarantee shall be 20 percent of the proposal price.

(d) If the successful offeror, upon acceptance of its proposal by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the offeror, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the offeror is liable for any cost of acquiring the work that exceeds the amount of its proposal, and the proposal guarantee is available to offset the difference.

(f)**USDA-FS CSA 11 – Electronic PDF copy of proposal bond to be submitted with the proposal package.

The contractor SHALL ensure that the notary seal is clearly visible on the copy.

52.228-11 Individual Surety - Pledge of Assets (FEB 2021) (DEVIATION APR 2020)

(a) The Contractor shall obtain from each person acting as an individual surety on a performance bond or a payment bond -

(1)A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203-1; and

(2) Standard Form 28, Affidavit of Individual Surety, [except that the words “being duly sworn, depose and say” on the Standard Form 28 are replaced with the word “affirm” and the Standard Form 28 is not required to be sworn and notarized in block 12].

(b)The Contracting Officer may release a portion of the security interest on the individual surety's assets based upon substantial performance of the Contractor's obligations under its performance bond. The security interest in support of a performance bond shall be maintained—

(1) Contracts for the construction, alteration, or repair of any public building or public work of the

Federal Government exceeding $150,000 (40 U.S.C. 3131). Until completion of any warranty period, or for 1 year following final payment, whichever is later.

(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.

(3) Other contracts not subject to the requirements of paragraph (b)(1) of this clause. Until completion of any warranty period, or for 90 days following final payment, whichever is later.

(c)A surety's assets pledged in support of a payment bond may be released to a subcontractor or supplier upon Government receipt of a Federal district court judgment, or a sworn statement by the subcontractor or supplier that the claim is correct along with a notarized authorization of the release by the surety stating that it approves of such release. The security interest on the individual surety's assets in support of a payment bond shall be maintained—

(1) Contracts for the construction, alteration, or repair of any public building or public work of the

Federal Government exceeding $150,000 which require performance and payment bonds (40 U.S.C. 3131).

For 1 year following final payment, or until resolution of all pending claims filed against the payment bond during the 1-year period following final payment, whichever is later.

(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.

(3) Other contracts not subject to the requirements of paragraph (c)(1) of this clause. For 90 days following final payment.

(d)The Contracting Officer may allow the Contractor to substitute an individual surety, for a performance or payment bond, after contract award. The Contractor shall comply with the requirements of paragraph (a) of this clause within the timeframe established by the Contracting Officer.

https://www.acquisition.gov/far/part-28#FAR_28_203_1

52.228-15 Performance and Payment Bonds -- Construction (JUN 2020) (DEVIATION APR 2020)

(a)Definitions. As used in this clause -- “Original contract price” means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102-1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:

(1) Performance Bonds (Standard Form 25, EXCEPT THAT A SEAL IS NOT REQUIRED). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bonds (Standard Form 25-A, EXCEPT THAT A SEAL IS NOT REQUIRED). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

(3) Additional bond protection.

(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.

(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.

(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Proposal Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.

(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier’s check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:

U.S. Department of Treasury Financial Management Service Surety Bond Branch 3700 East West Highway, Room 6F01 Hyattsville, MD 20782 Or via the internet at http://www.fms.treas.gov/c570/.

(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.

52.228-17 Individual Surety – Pledge of Assets (Proposal Guarantee) (FEB 2021)

(a)Offerors shall obtain from each person acting as an individual surety on a proposal guarantee—

(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203-1; and

(2) Standard Form 28, Affidavit of Individual Surety.

https://www.acquisition.gov/far/part-28#FAR_28_102_1 http://www.fms.treas.gov/c570/ https://www.acquisition.gov/far/part-28#FAR_28_203_1

(b)The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228-1, Proposal Guarantee, or as otherwise established by the Contracting Officer.

(c)The Contracting Officer may release the security interest on the individual surety's assets in support of a proposal guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) (DEVIATION

APR 2020)

(a)[(1) In accordance with 31 U.S.C. 3903 and 10 U.S.C. 2307, upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract [in accordance with the accelerated payment date established], to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, [with a goal of 15 days] after receipt of a proper invoice and all other required documentation from the small business subcontractor [if a specific payment date is not established by contract.

(2) The Contractor agrees to make such payments to its small business subcontractors without any further consideration from or fees charged to the subcontractor].

(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.

(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.

https://www.acquisition.gov/far/part-52#FAR_52_228_1

52.236-4 Physical Data (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by survey and test pits by the design firm.

(b) Weather conditions at zip code 24484.

(c) Transportation facilities N/A.

52.252-6 Authorized Deviations in Clauses (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.

(b) The use in this solicitation or contract of any Agriculture Acquisition Regulation (48 CFR __4___) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

452.228-71 Insurance Coverage (NOV 1996) Alt 1 (NOV 1996)

Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.

(b) General Liability. The Contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence.

(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.

(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

J.1 ATTACHMENTS

Attachment Number Name Number of Pages 0001 Buy American and Hazardous Materials Certification 2

0002 WDOL VA20210024 4

0003 Bolar Mountain Specifications-Final 144

0004 Bolar Mountain WW Drawings-Final 23

0005 Bolar Mountain Rec Area Drainfield Permit 108 20 0024 9

0006 Experience Questionaire 2

0007 Past Performance Quesionaire 5

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND

OTHER STATEMENTS OF OFFERORS OR RESPONDENTS

K.1 PROVISIONS

52.236-28 Preparation of Proposals – Construction (OCT 1997)

52.204-8 Annual Representations and Certifications (MAR 2020) (DEVIATION JUL 2020)

(a) (1) The North American Industry Classification System (NAICS) code for this acquisition is 237110 - Water and Sewer Line and Related Structures Construction.

(2) The small business size standard is $39.5M.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b) (1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

(i) Paragraph (d) applies.

(ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .