0004 BolarMountainWWDrawings-Final 6 11 21 jpt.pdf

PDF 2 MB Posted

Attached to
Bolar Mountain Recreation Area- Reconstruction of the Wastewater System
Solicitation number
12445121R0016
Issued by

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. DHC20October 16, 2020

10/16/20

B ur le so n E ng in ee rin g, P

LL

C

B ig

S pr in g

D riv e Le xi ng to n, V irg in ia

0-

7-

B ol ar M ou nt ai n

R ec re at io n

A re a

,0

G P

D L ar ge

A O

S S

O V er al l S ite

P la n

1/

D H

C

0'

B a t h C o u nt y

T M

-7

U

S F

S

SUGAR

RIDGE

Campground #1

Campground #2

Campground #3

Existing Treatment Plant

Dump Station at CG #2

Beach

Picnic Area

Beach Restroom

Pump Station

Upper Double Pump Station

Upper Bath

House

RVH

RVH

RVH

RVH

G

G

G

G G

G G

G

G

G

Lower Restroom Picnic Shelter

Dripfield/ Reserve

Proposed Treatment

Area

Campground #3 Pump Station

Central Bath

House

G

CG#1

Dump Station

Shoreline

Lake Moomaw

Nitrogen Management

Area

Twin R idge D riv e

MAG

Fee Booth

CG 1

SH/RR

Campground #3 Pump Station 0

Campground 3 Shower House/Restrooms 5

Campground #2 Shower House/Restroom 37

Campground #2 Dump Station 45

Beach Restrooms 4

Beach Pump Station 2

Campground #1 Shower House/Restrooms 91

Campground #1 Dump Station 90

Sugar Ridge Campground Lower Pump Station 16

Sugar Ridge Campground Upper Pump Station 63

Proposed Equalization Tank 111

Relative Ground Elevations (existing) u rle so n E ng in ee rin g, P

L

LC

B ig S pr in g D ri ve

Le xi ng to n, V irg in ia

0-

7-

B ol ar M ou nt ai n

R ec re at io n

A re a

,0

G P

D L ar ge

A O

S S

S ite

P la n

S ug ar R id ge

A re a

2/

C H

D

0'

0'

B at h C ou n ty T

M : U

S F

S

Beach Restrooms Beach

Pump Station

(Demolish)

Upper Double Pump Stations

(Demolish)

Upper

SH/RR

RVH

RVH

G G

G

G

G

Lower Restroom Picnic Shelter

Proposed Dripfield/ Reserve

Central

SH/RR

G

CG#1

Dump Station

1 3

Picnic Area Restrooms

Twin Ridge Drive

Proposed Treatment

Area

Picnic Shelter Pump Station

(Demolish)

= New Gravity Sewer Main/LineG

RVH = RV Hookup (Host) SH/RR = Shower House/Restrooms

CG 1

SH/RR

Fee Booth

Tw in R idge D rive

MAG

Beach Restroom Tank Area

Picnic Restroom Tank Area

Campground #1 Tank Area

Upper Double Pump Stations

(Demolish)

Sugar Ridge Upper Shower House

G

Sugar Ridge Central SH/RR Tank Area

Old Sewer Manholes (demolish)

G

G

1 New 4"SCH40 Sewer Main Cleanouts every 50' Fall: 1.25" per 10' min

2 Two (2) Septic/Settling Tanks

a. ST#1: 1500 Gallon Concrete (Top Seam) with Inlet and Outlet Side Access Risers

b. ST#2: 1500 Gallon Concrete (Top Seam) with Inlet and Outlet Side Access Risers and Polylok PL-525 Effluent Filter in housing on outlet side of tank.

3 Gravity Line between Septic/Settling Tanks and Pump Tank: 4"SCH40 (fall: 6" per 100' min) Cleanouts every 100'

4 Three (3) Septic/Settling Tanks

a. ST#1: 1500 Gallon Concrete (Top Seam) with Inlet and Outlet Side Access Risers

b. ST#2: 1500 Gallon Concrete (Top Seam) with Inlet and Outlet Side Access Risers

c. ST#3: 1500 Gallon Concrete (Top Seam) with Inlet and Outlet Side Access Risers and Polylok PL-525 Effluent Filter in housing on outlet side of tank.

5 1500 Gallon Concrete (Top Seam) with Inlet and Outlet Side Access Risers and Polylok PL-525 Effluent Filter in housing on outlet side of tank.

6 2000 Gallon Pump Tank Concrete (Top Seam)

a. Inlet and Outlet Side Risers

b. Duplex Effluent Pumps

7 Force Main: 2"SCH40 Force Main (to treatment area equalization pump station)

8 5000 Gallon Pump Tank Concrete (Top Seam)

a. Inlet and Outlet Side Risers

b. Duplex Effluent Pumps

Beach Pump Station Area

G

G

R V

H

Beach Pump Station

(Demolish)

Force Main from CG#3

Pump Station le so n E n gi ne er in g, P

LL

C

B ig

S pr in g

D riv e Le xi n gt on

V irg in ia

0-

-0

B ol ar M ou nt ai n

R ec re at io n

A re a

,0

G P

D L ar ge

A O

S S

S ite

P la n

C am pg ro un ds

3/

D H

C

0'

0'

B at h C ou n ty T

M : U

S F

S

RVH

RVH

G

G

G

G G

CG#3

SH/RR

CG#2

SH/RR

Tw in R idge D rive

Pump Station

1 New 4"SCH40 Sewer Main Cleanouts every 50' Fall: 1.25" per 10' min

2 Three (3) Septic/Settling Tanks

a. ST#1: 1500 Gallon Concrete (Top Seam) with Inlet and Outlet Side Access Risers

b. ST#2: 1500 Gallon Concrete (Top Seam) with Inlet and Outlet Side Access Risers

c. ST#3: 1500 Gallon Concrete (Top Seam) with Inlet and Outlet Side Access Risers and Polylok PL-525 Effluent Filter in housing on outlet side of tank.

3 Gravity Line between Septic/Settling Tanks and Pump Tank: 4"SCH40 (fall: 6" per 100' min)

4 2000 Gallon Pump Tank Concrete (Top Seam)

a. Inlet and Outlet Side Risers

b. Duplex Effluent Pumps

5 Force Main: 2"SCH40 Force Main (to beach pump station). Installed below frost line.

= New Gravity Sewer Main/LineG

RVH = RV Hookup (Host) SH/RR = Shower House/Restrooms

Existing Pump Station

Campground #3 Tank Area

Campground #3 Tank Area MAG

Burleson Engineering, PLLC 1374 Big Spring Drive

Lexington, Virginia 24450 540-817-0350

4/17Bolar Mountain Recreation Area 14,000 GPD Sewage System Treatment/Dripfield Area

MAG

Force Main from

Sugar Ridge

= Reference Tree w/Pink Tape

Fee BoothTwin Ridge Drive

Bolar Loop Trail Sugar Hollow Trail Sign

Drainfield/Reserve Area Surveyed Footprint.

All driplines must be located within the surveyed footprint.

Notes:

1. DO NOT install during wet, icy or snowy weather.

2. Identify all buried utilities prior to any excavation.

3. Read all plans and specifications carefully.

4. Follow installation procedures detailed in EZTreat, pump and Geoflow installation manuals.

5. This drainfield should not be installed unless the plans and specifications have a signed authorization letter or signed permit from the Health Dept.

6. No system component substitutions without approval from the project engineer.

7. A pre-construction conference is required with project engineer prior to installation.

8. If dripfield corner flags/stakes are missing, engineer must re-flag prior to any installation.

9. Dripfield area should be seeded, strawed and fertilized immediately after backfilling, covering and grading.

10. Dripfield footprint marked with pink flags or as indicated.

11. See survey (Hansen, 5/18/20) for dimensions.

44'0 88'

Force Main from

Beach Pump Station

DHC20

192 x 203'

(38,976 LF)

12 Zones, 16 Lines each 3248 LF per zone Geoflow Driplines

Wasteflow PC - 1/2 gph Installed: 3" Deep

Cover: 9" Line Spacing: 24"

On Contour

Lower Field Zone 1

7360 SF

(0.159 GPD/SF)

Lower Field Zone 2

7370 SF

(0.158 GPD/SF)

Lower Field Zone 3

7240 SF

(0.161 GPD/SF)

Lower Field Zone 4

7190 SF

(0.162 GPD/SF)

Lower Field Zone 5

7195 SF

(0.162 GPD/SF)

Lower Field Zone 6

6790 SF

(0.171 GPD/SF)

Upper Field Zone 7

7030 SF

(0.166 GPD/SF)

Upper Field Zone 8

6960 SF

(0.168 GPD/SF)

Upper Field Zone 9

6700 SF

(0.174 GPD/SF)

Upper Field Zone 10

6560 SF

(0.178 GPD/SF)

Upper Field Zone 11

7830 SF

(0.149 GPD/SF)

Upper Field Zone 12

7510 SF

(0.155 GPD/SF)

2 3 4 5 6

Notes:

1. Due to long driplines, end loops are not used in this dripfield.

2. Do Not use end coupling loops.

Use return line as shown.

50%+ Reserve

(41,320 SF)

This system must be installed by a DPOR licensed "Alternative Onsite Sewage System Installer".

Upper Field Zone Valve Area

Lower Field Zone Valve Area

1 Force Mains (2"SCH40 from Effluent Pump Stations)

a. Sleeve in 6"SCH40+ under road

b. Expand to 4" SCH40 on north side of road, 10 feet prior to Treatment Area Settling Tank

2 Treatment Area Settling/Septic Tank: 10,000 Gallon Concrete with Inlet and Outlet Side Access Risers and and Duplex Polylok PL-525 Effluent Filter on outlet side of tank.

3 Flow Equalization Tank: 10,000 Gallon Concrete with Inlet and Outlet Side Access Risers & Flow Equalization Pumps Duplex Pumps: Myers ME45

4 Recirculation Tank #1: 7700 Gallon, Concrete with three (3) EZTreat Model 4-L Pods

a. Install Access Risers on Inlet and Outlet Sides of tank.

b. Three Sta-Rite STEP50 pumps (one pump per EZTreat pod)

c. 2"SCH40 Supply Line to EZTreat pods

d. 4"SCH40 Drain/Return Lines from EZ Treat pods

e. Install E-Z By-Pass Valve on outlet side Pod drainline/outlet line

5 Recirculation Tank #2: 7700 Gallon, Concrete with three (3) EZTreat Model 4-L Pods

a. Install Access Risers on Inlet and Outlet Sides of tank.

b. Three Sta-Rite STEP50 pumps (one pump per EZTreat pod)

c. 2"SCH40 Supply Line to EZTreat pod

d. 4"SCH40 Drain/Return Lines from EZ Treat pods

e. Install E-Z By-Pass Valve on outlet side POD drainline/outlet line

f. One Sta-Rite STEP30 denitrification return pump connected to 1"SCH40 Nitrification Return Line

6 Dripfield Dosing Pump Tank(s): Two 10000 Gallon, Concrete connected with 4"SCH40 pipe <18" from tank bottom to create 20,000 gallons of tank volume

a. Both tanks should have Inlet and Outlet Side Access Risers.

b. Dripfield Pumps: Two Duplex (or Quadplex), Goulds 33EB10 & 15

c. Two pairs of Duplex Pump (Upper Field and Lower Field)

d. Calcite Return Line Pump: Sta-Rite STEP30

e. Denitrification Return Line Pump: Sta-Rite STEP30

7 Calcite Return Line: 1"SHC40 to Inlet Side of Recirc Tank #1

8 Denitrification Return Line: 1"SCH40 to Inlet Side of Treatment Area Settling/Septic Tank

9 Dripfield Supply Line(s): 2"SCH40 installed below frost line

10 Lower Field Supply Side Valve Boxes

a. Insulated Valve Box: Ball Valves, Pressure Gauges, Zone Valve

b. Insulated Valve Box with Supply Line Air/Vac Breakers

11 Upper Field Supply Side Valve Boxes

a. Insulated Valve Box: Ball Valves, Pressure Gauges, Zone Valve

b. Insulated Valve Box with Supply Line Air/Vac Breakers

12 Insulated Valve Boxes with Return Line Air/Vac Breaker

13 Upper Field Insulated Valve Box with Return Line Junction, Ball Valves, Pressure Gauges and Check Valves.

14 Upper Field Insulated Valve Box with Return Line Junction, Ball Valves, Pressure Gauges and Check Valves.

15 Insulated Valve Box: Upper & Lower Field Return Lines Convergence

16 1.25" SCH40 Return Line. After Convergence of both Return Lines, expand to 4" SCH40 between Convergence and Pump Tank.

17 Dripfield Shallow Sampling Port le so n E ng in ee rin g, P

LL

C

B ig

S pr in g

D riv e Le xi ng to n, V irg in ia

0-

7-

5/

D H

C

Dripfield Notes:

1. Geoflow Wasteflow PC 1/2 gph (no substitutions).

2. Emitter Spacing: 24".

3. Drip Line Spacing: 24" between lines, On Contour.

4. Zones: 12 (16 x 203's lines per zone)

5. Drip Line Length: 3248 linear feet of drip tubing per zone.

6. Drip Field: 192 x 203' Long Driplines (38,976 LF total).

7. Install Depth: 3", 9" cover.

8. Follow manufacturers install procedures supplied with tubing.

9. Supply Line: 2" SCH40. Return Line: 1.25" SCH40.

Dripfield Dosing Pump Tank Notes:

1. 20,000 Gallons (2 x 10,000 gallons), Concrete.

2. Pump: Goulds Blaster 33EB15 (Upper Field DUPLEX)

Goulds Blaster 33EB10 (Lower Field DUPLEX)

3. Follow pump manufacturers installation procedures.

4. Spin Filter: Vortex Screen Filter (AP4E-2F 2" Spin Filter).

5. Pump control panel should be high quality and have similar functions as Geoflow Geo Standard, Automatic, for each pump pair.

6. Pump control panel should have the following minimum characteristics.

a. Pump must have an audiovisual alarm in an area where it will be easily seen or heard.

b. Highwater alarm must have electrical circuitry separate from the pump circuitry.

c. All electrical connections must be hard wired.

d. Pump station should have controls for automatically starting and stopping the pump based on water level and include a manual overide switch.

e. Timer capable of handling dosing detailed on pump tank schematic.

General Notes:

1. All components of this system should be 5'+ from any property line.

2. Contact Miss Utility 48 hours before any excavation.

3. Do Not install during wet, icy or snowy weather.

4. Any questions regarding location and/or layout of drainfield or components, or drainfield flags are missing, contact engineer, John Burleson, at 540-817-0350 prior to installation.

5. Trees should be removed from the installed drainfield area.

6. Trees with water loving roots (maples) should be removed to at least 10'+ from the installed drainfield area.

7. All sewage system components should be located 10'+ from house or any structure without basement, 10'+ from downhill side of walkout basement, 20'+ from full basement or sides or uphill of walkout basement.

8. Protect the drainfield area during any land disturbance and/or building construction.

9. The sewage disposal system is to be constructed as specified by the permit or attached plans and specifications. Failure to install sewage disposal system as specified may require reinstallation.

10. All construction materials and methods must conform to applicable local regulations and with Virginia Sewage Handling and Disposal Regs.

11. Concrete tanks should be installed on uniformly firm and stable compacted soil or undisturbed soil. Number 57 stone recommended to provide uniform support to tank bottom. If rock is encountered in bottom of tank hole, at least 6" of number 57 stone is required and should be graded and leveled before tanks are set.

12. Backfill tanks and piping with suitable loose material that is free of large or damaging objects.

13. Compact soil in lifts around tanks to reduce settling.

14. Drainfield should be seeded, strawed and fertilized immediately after backfilling and final grading.

15. Ensure that the final grade sheds water away from the drainfield area.

Stormwater from gutters, etc. should be diverted away from the drainfield area and the septic/treatment/pump tanks.

16. If the drainfield is not marked, flags are missing or can't be located using the construction drawing, Do Not Begin installation on any part of the system. Contact engineer, John Burleson, at 540-817-0350 or 540-464-9242. Failure to contact the engineer and installing the drainfield in the incorrect location, incorrect depth, etc. may result in inspection rejection and may require reinstallation.

17. Sewage disposal system requires inspection. Contact, engineer, John Burleson at 540-817-0350 or 540-464-9242 a minimum of 48 hours in advance to arranged for inspection.

18. Unless specifically authorized by engineer, the system should not be covered until the engineer has inspected and approved the installation.

19. NO EQUIPMENT SUBSTITUTIONS ALLOWED, unless authorized by project engineer.

20. Before installing, contractor should have a copy of the signed Health Department Approval Letter with Health Dept ID#, and PE Plans and Specs.

21. Sewer main: 4" or 6" SCH40, fall: 1.25" per 10' minimum.

22. Gravity Lines: 4" SCH40 or SDR35, fall: 6" per 100' minimum.

23. Unless noted differently, all piping and fittings should be SCH40 PVC and designed for pressure applications. B ol ar

M ou nt ai n R ec re at io n A re a

,0

G

P D

L ar ge A

O S

S P ro je ct N ot es

Existing Wastewater Treatment Plant

1. The existing wastewater treatment plant/discharge system is permitted and regulated through VPDES Permit 0032123.

2. Closure and demolition will occur pursuant appropriate regulations required the Virginia Department of Environmental Quality (VDEQ), etc.

Existing Wastewater Collection System

1. The existing components of the collection system will be disconnected, abandoned in placed and/or demolished.

2. Existing pump stations: disconnect sewerage and remove electrical components and pumps. Pump out liquid and solids, collapse tank and fill hole with non-settling material.

3. Existing manholes: disconnect sewerage, pump out any liquid and solids, collapse manhole and fill hole with non-settling material.

4. Existing sewer mains/force mains, remove as requried. Any remaining, abandoned sewer mains should be plugged with concrete or capped with appropriately sized cap at any cut points.

5. Any pumped solids or liquid should be hauled by an appropriately licensed septage hauler to a wastewater treatment plant.

le so n E ng in ee rin g, P

LL

C

B ig

S pr in g

D riv e Le xi ng to n, V irg in ia

0-

7-

6/

D H

C

B ol ar M ou nt ai n

R ec re at io n

A re a

,0

G P

D L ar ge

A O

S S

T re at m en t A re a

S et tli ng

/S ep tic T an k

TO FLOW

EQUALIZATION

PUMP TANK

C

B

ANORMAL LIQUID LEVEL

OUTLET

SIDE

RISER

N.T.S.

FROM EFFLUENT

PUMP TANKS

(TWO SEPARATE LINES INTO

TWO SEPARATE INLET PORTS)

BOTH INLET TEE AND EFFLUENT FILTER

SHOULD BE POSITIONED BELOW

SEPTIC TANK ACCESS HOLES FOR

OBSERVATION AND ACCESS.

A. Install a 4" SCH40 sanitary tee on the inlet pipe. Inlet Tee should extend 6" to 8" below and 8" to 10" above the normal liquid level.

B. Install Duplex Polylok PL-525 effluent filter per manufacturers instructions on outlet side of tank.

C. Install Access Riser to surface on the Inlet and Outlet Tee sides of the tank.

D. Concrete tanks should be installed on uniformly firm and stable compacted soil or undisturbed soil. 6" of Number 57 stone (minimum) required to provide uniform support to tank bottom. Stone base should be graded and leveled before tank is set.

D

4" SCH40

GRAVITY LINE

C

INLET

SIDE

RISER

INLET PIPES MUST HAVE

SANITARY TEES

PURSUANT TO "A" BELOW.

1" SCH40 PVC

DENITRIFICATION RETURN LINE

FROM RECIRC TANK #2

2" SCH40 FORCE MAIN FROM

BEACH PUMP STATION

TO TREATMENT AREA

SETTLING/SEPTIC TANK

EXPAND FROM

2"SCH40

TO 4"SCH40

EXPAND FROM

2"SCH40

TO 4"SCH40

TO TREATMENT AREA

SETTLING/SEPTIC TANK

2" SCH40 FORCE MAIN FROM

SUGAR RIDGE PUMP STATION

EXPAND FORCE MAINS FROM 2"SCH40 TO 4"SCH40

TEN FEET PRIOR TO TREATMENT AREA SETTLING/SEPTIC TANK

le so n E ng in ee rin g, P

LL

C

B ig

S pr in g

D riv e Le xi ng to n, V irg in ia

0-

7-

7/

D H

C

Notes:

1. The pump station must be provided with controls for automatically starting and stopping the pump based on water level and indicated timer settings.

2. The electrical motor control center and master disconnect switch shall be placed in a secure location and above grade.

3. Each motor control center shall be provided with a manual override switch.

4. A high water alarm with remote sensing and electrical circuitry separate from the motor control center circuitry shall be provided.

5. The alarm shall be audiovisual and shall alarm in an area where it may be easily monitored.

6. All electrical connections shall be hardwired in the electrical junction box.

7. All piping shall be of the pressure type with pressure fittings that are chemically fused.

8. Do not use any compression fittings. Use glue or screw fittings only.

9. Contact Engineer prior to substituting pump.

10. Pump chamber must be level and watertight.

11. Use an approved pump chamber only.

12. Concrete tanks should be installed on uniformly firm and stable compacted soil or undisturbed soil. 6" of Number 57 stone (minimum) required to provide uniform support to tank bottom. Stone base should be graded and leveled before tank is set.

STAINLESS STEEL

HOSE CLAMP

FLOAT

PLASTIC

FLOAT CORD

CLAMP 1. Place the cord into the plastic clamp as shown.

2. Locate clamp at activation level shown on pump tank schematic.

3. Do not install cord under steel hose clamp.

4. Tighten hose clamp using screwdriver. Over tightening may result in damage to plastic clamp.

5. All hose clamp components should be made of 18-8 stainless steel material.

6. Follow all installation and safety procedures provided with manufacturers instructions.

FLOAT

CORD

3.5"

TETHER

1. Pump Control Panel: DUPLEX PUMP, TIMED DOSE

2. Timer: Omron Analog Timer H3CR

Not-To-Scale

TO RECIRC

TANK #1

18" TO 24"

MAX.COVER

GRADE

CONDUIT

FROM

SETTLING

TANK

SET FLOAT TREE IN CONCRETE FILLED

CAN OR BUCKET FOR STABILITY.

NON-CORROSIVE

LIFT ROPE

CONCRETE OR APPROVED PLASTIC RISER

CONCRETE OR APPROVED PLASTIC RISER

6" MIN.

WATERPROOF JUNCTION BOX (NEMA 4X)

LOCATION TBD BY ENGINEER/OWNER/INSTALLER

(RECOMMEND ORENCO SBEX1-4 SPLICE BOX)

SHOULD BE ON EXTERIOR OF RISER AND PUMP TANK.

ALARM FLOAT 127"

PUMP/TIMER ENABLE FLOAT 15"

EMERGENCY STORAGE =8"

Follow Manufacturers Installation Procedures for Pump Installation

WORKING VOLUME BETWEEN

ENABLE AND ALARM FLOATS

100" (6850 GAL) AVAILABLE

DUPLEX PUMP CONFIGURATION (TYPICAL)

GATE

VALVE

GATE

VALVE

PUMP

#1

PUMP

#2

CHECK

VALVE

CHECK

VALVE

N .T

.S

E

E

GATE

VALVE

SCH80 UNION OR

CAMLOCK COUPLING

N O

N -C

O R

R O

S

IV

E

LIF

T R

O P

E

CHECK VALVE

1/8" WEEP HOLE

ELEVATE PUMP

WITH BLOCK,

PUMP STAND

OR EQUIVALENT.

EXPAND TO

4"SCH40

PRIOR TO

TANK EXIT

PUMP: MEYERS ME45

(MUST BE SUBMERGED)

B ol ar M ou nt ai n

R ec re at io n

A re a

,0

G P

D L ar g e A

O S

S

E qu al iz at io n P um p

Ta nk

Pump Cycle Time per Dose 5:00 m:s at 60 GPM

Time Off Between Doses 15 minutes

TREATMENT MANUFACTURER'S CONTROL SETTINGS

le so n E ng in ee rin g, P

LL

C

B ig

S pr in g

D ri ve Le xi ng to n, V irg in ia

0-

7-

8/

D H

C

Dripfield Pump Tank Notes:

1. Two, 10,000 Gallon, Concrete Tanks connected <18" from tank bottom.

2. Upper Field Pump(s): Goulds Blaster 33EB15 DUPLEX

3. Lower Field Pump(s): Goulds Blaster 33EB10 DUPLEX

3. Follow pump manufacturers installation procedures.

4. Spin Filter: Vortex Screen Filter (AP4E-2F 2" Spin Filter).

5. Pump control panel should be high quality and have similar functions as Geoflow Geo Standard, Automatic, Duplex (for 2 pumps)

6. Pump control panel should have the following minimum characteristics.

a. Pump must have an audiovisual alarm in an area where it will be easily seen or heard.

b. Highwater alarm must have electrical circuitry separate from the pump circuitry.

c. All electrical connections must be hard wired.

d. Pump station should have controls for automatically starting and stopping the pump based on water level and include a manual overide switch.

e. Timer capable of handling dosing detailed on pump tank schematic.

7. Concrete tanks should be installed on uniformly firm and stable compacted soil or undisturbed soil. Number 57 stone recommended to provide uniform support to tank bottom. If rock is encountered in bottom of tank hole, at least 6" of number 57 stone is required and should be graded and leveled before tanks are set.

Not-To-Scale

2" SCH40

TO DRIPFIELD

1.25" SCH40

RETURN LINE

18" TO 24"

MAX.COVER

GRADE

CONDUIT

FROM

TREATMENT

TANK

SET FLOAT TREE IN CONCRETE FILLED

CAN OR BUCKET FOR STABILITY.

NON-CORROSIVE

LIFT ROPE

CHECK VALVE

1/8" WEEP HOLE

BALL VALVE

(CRACKED)

1/2"

FLEXIBLE

TUBING

VORTEX

SCREEN

FILTER

AP4E-2F

2" SPIN FILTER

E

E

CONCRETE OR APPROVED PLASTIC RISER

CONCRETE OR APPROVED PLASTIC RISER

6" MIN.

WATERPROOF JUNCTION BOX (NEMA 4X)

LOCATION TBD BY ENGINEER/OWNER/INSTALLER

(RECOMMEND ORENCO SBEX1-4 SPLICE BOX)

SHOULD BE ON EXTERIOR OF RISER AND PUMP TANK.

ALARM FLOAT 127"

PUMP/TIMER ENABLE FLOAT 18"

EMERGENCY STORAGE =8"

Follow Manufacturers Installation Procedures for Pump Installation

WORKING VOLUME BETWEEN

ENABLE AND ALARM FLOATS

109" (14932 GAL) AVAILABLE

DUPLEX PUMP CONFIGURATION (TYPICAL)

GATE

VALVE

GATE

VALVE

PUMP

#1

PUMP

#2

CHECK

VALVE

CHECK

VALVE

N .T

.S

STAINLESS STEEL

HOSE CLAMP

FLOAT

PLASTIC

FLOAT CORD

CLAMP 1. Place the cord into the plastic clamp as shown.

2. Locate clamp at activation level shown on pump tank schematic.

3. Do not install cord under steel hose clamp.

4. Tighten hose clamp using screwdriver. Over tightening may result in damage to plastic clamp.

5. All hose clamp components should be made of 18-8 stainless steel material.

6. Follow all installation and safety procedures provided with manufacturers instructions.

FLOAT

CORD

3.5"

TETHER

B ol ar M ou nt ai n

R ec re at io n

A re a

,0

G P

D D rip fie ld D rip fie ld D os in g P um p

Ta nk

FLOAT TREE

BRACKET

HIGH

FLOAT

ENABLE

FLOAT

STEP30

Calcite

Recirc Pump

STEP30

Denitrification Recirc Pump

Upper Field

Dose Volume/Zone 389 gallons

Doses per day/Zone 3 doses

Total Doses per Day (all zones) 18 doses

Drawdown/Dose 2.83 inches

Timer ON/Zone 27:07 min:secs (Pump run time per dose)

Timer OFF 7:32 hrs:min (Pump off time between doses)

Flow Rate 20.3 gpm

TDH 130.4 feet

Lower Field

Dose Volume/Zone 389 gallons

Doses per day/Zone 3 doses

Total Doses per Day (all zones) 18 doses

Drawdown/Dose 2.83 inches

Timer ON/Zone 27:07 min:secs (Pump run time per dose)

Timer OFF 7:32 hrs:min (Pump off time between doses)

Flow Rate 20.3 gpm

TDH 119.8 feet

(TWO 10,000 GALLON TANKS CONNECTED <18"

FROM TANK BOTTOM. 20,000 GALLONS TOTAL)

1. 4 DRIPFIELD DOSING PUMPS TOTAL

2. TWO SETS OF DUPLEX PUMPS,

A. UPPER FIELD DUPLEX (GOULDS 33EB15)

B. LOWER FIELD DUPLEX (GOULDS 33EB10)

le so n E ng in ee rin g, P

LL

C

B ig

S pr in g

D riv e Le xi ng to n, V irg in ia

0-

7-

D

H C

9/

Original Grade

Dripline

Backfill with clean soil

(No Debris)

Cover Material should be clean topsoil free of debris, rocks, or non-compactible material.

Trench Detail Not-To-Scale3

Header Ditch/Manifold Schematic

Not-To-Scale1

3"

Install Header Ditch Below Frostline

First Emitter should be 12"+ from sidewall of header ditch.

Install D epth

Original G rade

1.25" S CH40 Return Line

Bed Header Lines Carefully in rock free backfill.

Return Ditch/Manifold Schematic

Not-To-Scale2

Install Return Ditch Below Frostline Last Emitter should be

12"+ from sidewall of header ditch.

Install Depth

Original Grade

2" SCH40 Supply Line

Bed Return Lines Carefully in rock free backfill.

B ol ar M ou nt ai n

R ec re at io n

A re a

,0

G P

D A

O S

S H ea de r D itc h/

T re nc h

D et ai ls

Finish Grade

9" le so n E ng in ee rin g, P

LL

C

B ig

S pr in g

D riv e Le xi ng to n, V irg in ia

0-

7-

/ 1

D H

C 2 0

4" PVC

SCH40

FROM

TREATMENT

TANK

24" MINIMUM OPENING

CONCRETE OR APPROVED PLASTIC RISER

Sample Port Not-To-Scale4

Notes:

1. The purpose of the sample port is to collect free flowing treated effluent.

2. Extend 4"SCH40 gravity line from treatment tank to under the access hole on the inlet side of the pump tank.

3. Install Access Riser (Concrete or Approved Plastic) to surface on the inlet side of the pump tank.

4. With this option there will be two access risers on the pump tank: one on the inlet side and one on the outlet side.

Dripfield Dosing Pump Tank Inlet Side

Finish Grade

Not-To-Scale

Zone Valve Box

Dripfield Shallow Sampling Port Not-To-Scale5

Finish Grade

36"

Top 12" fill space around pipe with soil.

Bottom 12" fill space around pipe with

1/2" to 1 1/2" clean gravel.

Notes:

1. The purpose of the sample port is to collect treated effluent in the vicinity of the dripfield.

2. Dig a 24"-26" deep hole 6 to 8 inches wide.

3. Place a 4" SHC40 capped pipe with 1/8" holes or slots.

4. Fill lower 12" of space around pipe with 1/2" to 1 1/2" clean gravel.

5. Fill upper 12" of space with soil removed from hole.

4" Threaded Cleanout Plug

Drill 24 evenly spaced 1/8" holes in lower half of sample pipe.

B A

LL

V

A

LV

E

Field Valve Box w/Return Line Junction Not-To-Scale

1.25" RETURN

LINE TO

PUMP TANK

VIA UPPER/LOWER

FIELD RETURN

LINE JUNCTION BOX

B A

LL

V

A

LV

E

ZONE 2

1.25" RETURN LINE

B A

LL

V

A

LV

E

ZONE 3

1.25" RETURN LINE

ZONE 1

1.25" RETURN LINE

PRESSURE

GAUGES

(0-100 PSI)

CHECK

VALVE

CHECK

VALVE

CHECK

VALVE

1. USE HYDROTEK 6600 SERIES, 6606.

2. ZONE VALVE SHOULD BE PLACED IN INSULATED VALVE BOX.

3. USE REDUCING/EXPANSION FITTINGS AS APPROPRIATE TO

MATCH FORCE MAIN SIZE.

4. SEE VALVE INSTRUCTIONS PROVIDED BY MANUFACTURER.

B A

LL

V

A

LV

E

B A

LL

V

A

LV

E

ZONE 4

1.25" RETURN LINE

ZONE 5

1.25" RETURN LINE

CHECK

VALVE

CHECK

VALVE

B A

LL

V

A

LV

E

ZONE 6

1.25" RETURN LINE

CHECK

VALVE

B ol ar M ou nt ai n

R ec re at io n

A re a

,0

G P

D L ar ge

A O

S S

V a lv e

B ox es

S am pl e

P or ts

Not-To-Scale

BALL

VALVE

BALL

VALVE

2" SUPPLY LINE

FROM DRIPFIELD

DOSING PUMP TANK

ZONE

VALVE

BALL

VALVE

CHECK

VALVE

BALL

VALVE

CHECK

VALVE

ZONE 1

BALL

VALVE

CHECK

VALVE

CHECK

VALVE

CHECK

VALVE

PRESSURE

GUAGE

(0-100 PSI)

B A

LL

V

A L V

E

ZONE 2

ZONE 3

ZONE 6

ZONE 5

ZONE 4

CHECK

VALVE

BALL

VALVE

CHECK

VALVE

1.25" RETURN

LINE FROM

LOWER FIELD

JUNCTION BOX

CHECK

VALVE

CHECK

VALVE

B A

LL

V

A

LV

E

BALL

VALVE

1.25" RETURN LINE FROM

UPPER FIELD JUNCTION BOX

1.25" RETURN

LINE EXPANDED

TO 4"SCH40

TO PUMP TANK

Upper/Lower Field Return Line Junction Box Not-To-Scale le so n E ng in ee rin g, P

LL

C

B ig

S pr in g

D riv e Le xi ng to n, V irg in ia

0-

7-

MANIFOLD CONNECTION (END FEED)

BLANK GEOFLOW WASTEFLOW DRIPLINE RISER

BLANK GEOFLOW WASTEFLOW DRIPLINE

GEOFLOW LOCKSLIP ADAPTER (LTSLIP-600)

GLUE INTO 3/4 INCH PVC

GEOFLOW WASTEFLOW DRIPLINE

GEOFLOW LOCKSLIP COUPLING (LTC-600)

09-02 GEOFLOW ©

09-02 GEOFLOW ©

D H

C

/1

Install an Air/Vac Breaker for Zone 1 Supply Line and an

Air/Vac Breaker for Zone 1 Return Line.

Install an Air/Vac Breaker for Zone 2 Supply Line and an

Air/Vac Breaker for Zone 2 Return Line.

Install an Air/Vac Breaker for Zone 3 Supply Line and an

Air/Vac Breaker for Zone 3 Return Line.

Supply Breakers must be at a higher elevation than respective dripfield zone.

Return Breaker must be at a higher elevation than respective dripfield zone.

Due to long dripfield lines, end loops are not used in this dripfield.

Do Not use end coupling loops.

Install return line as shown on included schematics.

B ol ar M ou nt ai n

R ec re at io n

A re a

,0

G P

D D rip fie ld G eo flo w D et ai ls

Install an Air/Vac Breaker for Zone 7 Supply Line and an

Air/Vac Breaker for Zone 7 Return Line.

Install an Air/Vac Breaker for Zone 8 Supply Line and an

Air/Vac Breaker for Zone 8 Return Line.

Install an Air/Vac Breaker for Zone 9 Supply Line and an

Air/Vac Breaker for Zone 9 Return Line.

24 Air/Vac Breakers Total

Install an Air/Vac Breaker for Zone 4 Supply Line and an

Air/Vac Breaker for Zone 4 Return Line.

Install an Air/Vac Breaker for Zone 5 Supply Line and an

Air/Vac Breaker for Zone 5 Return Line.

Install an Air/Vac Breaker for Zone 6 Supply Line and an

Air/Vac Breaker for Zone 6 Return Line.

Install an Air/Vac Breaker for Zone 10 Supply Line and an

Air/Vac Breaker for Zone 10 Return Line.

Install an Air/Vac Breaker for Zone 11 Supply Line and an

Air/Vac Breaker for Zone 11 Return Line.

Install an Air/Vac Breaker for Zone 12 Supply Line and an

Air/Vac Breaker for Zone 12 Return Line.

Lower Field Upper Field le so n E ng in ee rin g, P

LL

C

B ig

S pr in g

D riv e Le xi ng to n, V irg in ia

0-

7-

/1

D H

C

B ol ar M ou nt a in

R ec re at io n

A re a

,0

G P

D L ar ge

A O

S S

S ep tic T an ks ty pi ca l)

C

B

ANORMAL LIQUID LEVEL

OUTLET

SIDE

RISER

N.T.S.

4"SCH40

BOTH INLET TEE AND EFFLUENT FILTER

SHOULD BE POSITIONED BELOW

SEPTIC TANK ACCESS HOLES FOR

OBSERVATION AND ACCESS.

A. Install a 4" SCH40 sanitary tee on the inlet pipe. Inlet Tee should extend 6" to 8" below and 8" to 10" above the normal liquid level.

B. Install Polylok PL-525 effluent filter per manufacturers instructions on outlet side of tank.

C. Install Access Riser to surface on the Inlet and Outlet Tee sides of the tank.

D. Concrete tanks should be installed on uniformly firm and stable compacted soil or undisturbed soil. 6" of Number 57 stone (minimum) required to provide uniform support to tank bottom. Stone base should be graded and leveled before tank is set.

D

4" SCH40

GRAVITY LINE

C

INLET

SIDE

RISER

INLET PIPES MUST HAVE

SANITARY TEES

PURSUANT TO "A" BELOW.

C

ANORMAL LIQUID LEVEL

OUTLET

SIDE

RISER

N.T.S.

4"SCH40

BOTH INLET TEE AND EFFLUENT FILTER

SHOULD BE POSITIONED BELOW

SEPTIC TANK ACCESS HOLES FOR

OBSERVATION AND ACCESS.

D

4" SCH40

GRAVITY LINE

C

INLET

SIDE

RISER

INLET PIPES MUST HAVE

SANITARY TEES

PURSUANT TO "A" BELOW.

B

A. SCH40 sanitary tee on the inlet pipe. Inlet Tee should extend 6" to 8" below and 8" to 10" above the normal liquid level.

B. SCH40 sanitary tee on the outlet pipe. Outlet Tee should extend below the normal liquid level 35-40% of the liquid depth and 8" to 10" above the normal liquid level.

C. Install Access Riser to surface on the Inlet and Outlet Tee sides of the tank.

D. Concrete tanks should be installed on uniformly firm and stable compacted soil or undisturbed soil. 6" of Number 57 stone (minimum) required to provide uniform support to tank bottom. Stone base should be graded and leveled before tank is set.

TOP SEAM TANKS REQUIRED TOP SEAM TANKS REQUIRED

SET FLOAT TREE IN CONCRETE FILLED

CAN OR BUCKET FOR STABILITY.

FROM

SEPTIC

TANK(S)

18" TO 24"

MAX.COVER

GRADE

CONDUIT

WATERPROOF JUNCTION BOX (NEMA 4X)

LOCATION TBD BY ENGINEER/OWNER/INSTALLER

6" MIN.

E

B ur le so n E ng in ee rin g, P

LL

C

B ig

S pr in g

D riv e Le xi ng to n, V irg in ia

0-

7-

B ol ar M ou nt ai n

R ec re at io n

A re a

,0

G P

D L ar ge

A O

S S

C am pg ro un d

2/

E ffl ue nt

P um p Ta nk

Notes:

1. The pump station must be provided with controls for automatically starting and stopping the pump based on water level.

2. The electrical motor control center and master disconnect switch shall be placed in a secure location and above grade.

3. Each motor control center shall be provided with a manual override switch.

4. A high water alarm with remote sensing and electrical circuitry separate from the motor control center circuitry shall be provided.

5. The alarm shall be audiovisual and shall alarm in an area where it may be easily monitored.

6. All electrical connections shall be hardwired in the electrical junction box.

7. All piping shall be of the pressure type with pressure fittings that are chemically fused.

8. Do not use any compression fittings. Use glue or screw fittings only.

9. Contact Engineer prior to substituting pump.

10. Pump chamber must be level and watertight.

11. Use an approved pump chamber only.

12. Concrete tanks should be installed on uniformly firm and stable compacted soil or undisturbed soil. 6" of Number 57 stone (minimum) required to provide uniform support to tank bottom. Stone base should be graded and leveled before tank is set.

E

E

GATE

VALVE

SCH80 UNION OR

CAMLOCK COUPLING

FORCE MAIN

INSTALLED

BELOW

FROST LINE.

NON-CORROSIVE

LIFT ROPE

CHECK VALVE

1/8" WEEP HOLE

PUMP: LIBERTY FL200

(MUST BE SUBMERGED)

PUMP TO BE

SUBMERGED

AT ALL TIMESELEVATE PUMP

WITH BLOCK,

PUMP STAND

OR EQUIVALENT.

INVERT OF INLET MAX. USABLE VOLUME

1/4 DAY STORAGE (MIN) =

HIGH WATER ALARM

PUMP ON

PUMP CYCLE DOSE =

PUMP OFF

1"

17"

20"

TOP OF PUMP

2"

SECURE

FORCE

MAIN

SEAL

Not-To-Scale

RISER

2" SCH40

D H

C

/1

Min Flow TDH 80 feet at 20.9 GPM

Operating Point TDH 105 feet at 25.5 GPM

Pump

Pump Chamber Size 2000 Gallons

Gallons per Cycle 728 Gallons

Drawdown per Cycle 20 Inches

Pump Cycle Time 4:32 m:s at 25.5 GPM

Liberty FL200

DUPLEX PUMP CONFIGURATION (TYPICAL)

GATE

VALVE

GATE

VALVE

PUMP

#1

PUMP

#2

CHECK

VALVE

CHECK

VALVE

N .T

.S

STAINLESS STEEL

HOSE CLAMP

FLOAT

PLASTIC

FLOAT CORD

CLAMP 1. Place the cord into the plastic clamp as shown.

2. Locate clamp at activation level shown on pump tank schematic.

3. Do not install cord under steel hose clamp.

4. Tighten hose clamp using screwdriver. Over tightening may result in damage to plastic clamp.

5. All hose clamp components should be made of 18-8 stainless steel material.

6. Follow all installation and safety procedures provided with manufacturers instructions.

FLOAT

CORD

3.5"

TETHER

FROM

SEPTIC

TANK(S)

18" TO 24"

MAX.COVER

GRADE

CONDUIT

WATERPROOF JUNCTION BOX (NEMA 4X)

LOCATION TBD BY ENGINEER/OWNER/INSTALLER

6" MIN.

E

B ur le so n E ng in ee rin g, P

LL

C

B ig

S pr in g

D riv e Le xi ng to n, V irg in ia

0-

7-

B ol ar M ou nt ai n

R ec re at io n

A re a

,0

G P

D L ar ge

A O

S S

S ug ar R id ge

E ffl ue nt

P um p Ta nk

Notes:

1. The pump station must be provided with controls for automatically starting and stopping the pump based on water level.

2. The electrical motor control center and master disconnect switch shall be placed in a secure location and above grade.

3. Each motor control center shall be provided with a manual override switch.

4. A high water alarm with remote sensing and electrical circuitry separate from the motor control center circuitry shall be provided.

5. The alarm shall be audiovisual and shall alarm in an area where it may be easily monitored.

6. All electrical connections shall be hardwired in the electrical junction box.

7. All piping shall be of the pressure type with pressure fittings that are chemically fused.

8. Do not use any compression fittings. Use glue or screw fittings only.

9. Contact Engineer prior to substituting pump.

10. Pump chamber must be level and watertight.

11. Use an approved pump chamber only.

12. Concrete tanks should be installed on uniformly firm and stable compacted soil or undisturbed soil. 6" of Number 57 stone (minimum) required to provide uniform support to tank bottom. Stone base should be graded and leveled before tank is set.

E

E

GATE

VALVE

SCH80 UNION OR

CAMLOCK COUPLING

FORCE MAIN

INSTALLED

BELOW

FROST LINE.

NON-CORROSIVE

LIFT ROPE

CHECK VALVE

1/8" WEEP HOLE

PUMP: LIBERTY FL200

(MUST BE SUBMERGED)

PUMP TO BE

SUBMERGED

AT ALL TIMESELEVATE PUMP

WITH BLOCK,

PUMP STAND

OR EQUIVALENT.

INVERT OF INLET MAX. USABLE VOLUME

1/4 DAY STORAGE (MIN) =

HIGH WATER ALARM

PUMP ON

PUMP CYCLE DOSE =

PUMP OFF

1"

17"

20"

TOP OF PUMP

2"

SECURE

FORCE

MAIN

SEAL

Not-To-Scale

RISER

2" SCH40

D H

C

/1

Min Flow TDH 80 feet at 20.9 GPM

Operating Point TDH 120 feet at 37.0 GPM

Pump

Pump Chamber Size 2000 Gallons

Gallons per Cycle 728 Gallons

Drawdown per Cycle 20 Inches

Pump Cycle Test Time 19:40 m:s at 37.0 GPM

Liberty FL200

DUPLEX PUMP CONFIGURATION (TYPICAL)

GATE

VALVE

GATE

VALVE

PUMP

#1

PUMP

#2

CHECK

VALVE

CHECK

VALVE

N .T

.S

STAINLESS STEEL

HOSE CLAMP

FLOAT

PLASTIC

FLOAT CORD

CLAMP 1. Place the cord into the plastic clamp as shown.

2. Locate clamp at activation level shown on pump tank schematic.

3. Do not install cord under steel hose clamp.

4. Tighten hose clamp using screwdriver. Over tightening may result in damage to plastic clamp.

5. All hose clamp components should be made of 18-8 stainless steel material.

6. Follow all installation and safety procedures provided with manufacturers instructions.

FLOAT

CORD

3.5"

TETHER

FROM

SEPTIC

TANK(S)

18" TO 24"

MAX.COVER

GRADE

CONDUIT

WATERPROOF JUNCTION BOX (NEMA 4X)

LOCATION TBD BY ENGINEER/OWNER/INSTALLER

6" MIN.

E

B ur le so n E ng in ee rin g, P

LL

C

B ig

S pr in g

D riv e Le xi ng to n, V irg in ia

0-

7-

B ol ar M ou nt ai n

R ec re at io n

A re a

,0

G P

D L ar ge

A O

S S

B ea ch E ffl ue nt P um p

Ta nk

Notes:

1. The pump station must be provided with controls for automatically starting and stopping the pump based on water level.

2. The electrical motor control center and master disconnect switch shall be placed in a secure location and above grade.

3. Each motor control center shall be provided with a manual override switch.

4. A high water alarm with remote sensing and electrical circuitry separate from the motor control center circuitry shall be provided.

5. The alarm shall be audiovisual and shall alarm in an area where it may be easily monitored.

6. All electrical connections shall be hardwired in the electrical junction box.

7. All piping shall be of the pressure type with pressure fittings that are chemically fused.

8. Do not use any compression fittings. Use glue or screw fittings only.

9. Contact Engineer prior to substituting pump.

10. Pump chamber must be level and watertight.

11. Use an approved pump chamber only.

12. Concrete tanks should be installed on uniformly firm and stable compacted soil or undisturbed soil. 6" of Number 57 stone (minimum) required to provide uniform support to tank bottom. Stone base should be graded and leveled before tank is set.

E

E

GATE

VALVE

SCH80 UNION OR

CAMLOCK COUPLING

FORCE MAIN

INSTALLED

BELOW

FROST LINE.

NON-CORROSIVE

LIFT ROPE

CHECK VALVE

1/8" WEEP HOLE

PUMP: LIBERTY FL200

(MUST BE SUBMERGED)

PUMP TO BE

SUBMERGED

AT ALL TIMESELEVATE PUMP

WITH BLOCK,

PUMP STAND

OR EQUIVALENT.

INVERT OF INLET MAX. USABLE VOLUME

1/4 DAY STORAGE (MIN) =

HIGH WATER ALARM

PUMP ON

PUMP CYCLE DOSE =

PUMP OFF

1"

35"

20"

TOP OF PUMP

2"

SECURE

FORCE

MAIN

SEAL

Not-To-Scale

RISER

2" SCH40

D H

C

/1

Min Flow TDH 80 feet at 20.9 GPM

Operating Point TDH 105 feet at 25.5 GPM

Pump

Pump Chamber Size 5000 Gallons

Gallons per Cycle 1370 Gallons

Drawdown per Cycle 20 Inches

Pump Cycle Test Time 5:43 m:s at 25.5 GPM

Liberty FL200

STAINLESS STEEL

HOSE CLAMP

FLOAT

PLASTIC

FLOAT CORD

CLAMP 1. Place the cord into the plastic clamp as shown.

2. Locate clamp at activation level shown on pump tank schematic.

3. Do not install cord under steel hose clamp.

4. Tighten hose clamp using screwdriver. Over tightening may result in damage to plastic clamp.

5. All hose clamp components should be made of 18-8 stainless steel material.

6. Follow all installation and safety procedures provided with manufacturers instructions.

FLOAT

CORD

3.5"

TETHER

DUPLEX PUMP CONFIGURATION (TYPICAL)

GATE

VALVE

GATE

VALVE

PUMP

#1

PUMP

#2

CHECK

VALVE

CHECK

VALVE

N .T

.S

X X

X

X

XX

X

X

4"

4"

6"

6"

36"+

Frost Line

4" Curb around edge of pad

Foot Operatate Fly-Proof Cap

6" Drop between bottom of curb and cap/hole.

N.T.S.

Sewer Trap must be installed below frost line.

SV

BFP

4" SCH40 to Septic Tanks

1 Drain Hole with Foot Operated, Fly Proof Hatch

2 a. Valve Box with Backflow Prevention Valve and Shutoff Valve. Valve should be installed below frost line. Valve Box should come to surface.

b. Frost Free Spigot. Spigot should be installed at least 3 feet above ground.

3 Concrete Pad

a. Minimum Pad dimensions: 60 inches by 36 inches.

b. Pad must be at least 6 inches thick.

c. Sewer Inlet must be at least 6" below the pad lip.

d. Pad should slope toward drainhole.

e. Pad should be surrounded by a 4 inch wide x 4 inch high curb (minimum).

4 Pad, Valve Box and Spigot should be surrounded by a fence to prevent unauthorized access to dump station. Minimum fence height should be at least four feet high. Fence should have lockable access gate.

N.T.S.

Access Gate w/Lock Water Supply

N.T.S.

NOTICE:

UNSAFE WATER OUTLET

THIS WATER

FOR WASHDOWN

PURPOSES ONLY.

DUMP STATION

AUTHORIZED USE ONLY

GATE MUST REMAIN

LOCKED WHEN

NOT IN USE.

Pad should slope to drain.

Dump Station Notes:

1. Dump Station must meet requirements of 12VAC5-610-1130.

2. Prior to connection to new sewage system, the existing dump stations should be inspected by a licensed Alternative Onsite Sewage System Operator to ensure functionality of dump stations and compliance with Health Department regulations.

3. Repairs and/or reinstallation of dump stations should be conducted pursuant to the requirements on this sheet.

B ur le so n E ng in ee rin g, P

LL

C

B ig

S pr in g

D riv e Le xi ng to n, V irg in ia

0-

7-

B ol ar M ou nt ai n

R ec re at io n

A re a

,0

G P

D L ar ge

A O

S S

D um p S ta tio n R eq ui re m en ts

D H

C

/1

4" SCH40 to Septic Tanks le so n E ng in ee rin g, P

LL

C

B ig

S pr in g

D riv e Le xi ng to n, V irg in ia

0-

7-

B ol ar M ou nt ai n

R ec re at io n

A re a

,0

G P

D L ar ge

A O

S S

S ew er /G ra vi ty /F or ce

M ai n D

H C

/1

Force Main Pipe: SCH40, NSF-PW Pressure Type w/Pressure Fittings

Clean Backfill

Installation Depth: 24"+

Ground Surface

Bury Tracer Wire with

Force Main

Sewer Mains and Gravity Lines

SCH40, NSF-PW

Pressure Type w/Pressure Fittings

Clean Backfill Installation

Depth: 12"+

Ground Surface

NTS

Bury Tracer Wire with

Force Main

Sewer/Gravity/Force Main Installation (Typical)

Pursuant to 9VAC25-790-360, the following setbacks/construction standards must be met.

1. Sewers entering or crossing streams shall be constructed of watertight pipe. The pipe and joints shall be tested in place and shall exhibit zero infiltration. Sewers laid on piers across ravines or streams shall be allowed only when it can be demonstrated that no other practical alternative exists.

Such sewers on piers shall be constructed in accordance with the requirements for sewers entering or crossing under streams. Construction methods and materials of construction shall be such that sewers will remain watertight and free from change in alignment or grade due to anticipated hydraulic and physical loads, erosion, and impact.

2. No sewer line shall pass within 50 feet of a drinking water supply well, source, or structure unless special construction and pipe materials are used to obtain adequate protection. The proposed design shall identify and adequately address the protection of all drinking water supply wells, sources, and structures up to a distance of 100 feet of the sewer line installation.

3. Sewers shall be laid at least 10 feet horizontally from a water main. The distance shall be measured edge-to-edge. When local conditions prohibit this horizontal separation, the sewer may be laid closer provided that the water main is in a separate trench or an undisturbed earth shelf located on one side of the sewer and the bottom of the water main is at least 18 inches above the top of the sewer. Where this vertical separation cannot be obtained, the sewer shall be constructed of water pipe material in accordance with AWWA specifications and pressure tested in place without leakage prior to backfilling.

The hydrostatic test shall be conducted in accordance with the most recent edition of the AWWA standard (ANSI/AWWA C600-82) for the pipe material, with a minimum test pressure of 30 psi.

4. Sewers shall cross under water mains such that the top of the sewer is at least 18 inches below the bottom of the water main. When local conditions prohibit this vertical separation, the sewer shall be constructed of AWWA specified water pipe and pressure tested in place without leakage prior to backfilling, in accordance with the provisions of this chapter. Sewers crossing over water mains shall:

a. Be laid to provide a separation of at least 18 inches between the bottom of the sewer and the top of the water main.

b. Be constructed of AWWA approved water pipe and pressure tested in place without leakage prior to backfilling, in accordance with the provisions of this chapter.

c. Have adequate structural support to prevent damage to the water main.

d. Have the sewer joints placed equidistant and as far as possible from the water main joints.

5. No water pipe shall pass through or come into contact with any part of a sewer manhole. Manholes shall be placed at least 10 feet horizontally from a water main whenever possible. The distance shall be measured edge-to-edge of the pipes or structures. When local conditions prohibit this horizontal separation, the manhole shall be of watertight construction and tested in place.

Pursuant to 9VAC25-790-380, the following cross connection standard must be met.

C. Water supply. There shall be no cross connection between any potable water supply and a sewage pump station which under any conditions might cause contamination of the potable water supply. Any potable water supply brought to the station shall comply with conditions stipulated in the Virginia Waterworks Regulations (12VAC5-590). Where conditions do not warrant the installation of an approved reduced pressure zone backflow prevention device on the water supply line to the pump stations, other approved devices may be considered on a case-by-case basis.

Pursuant to 9VAC25-790-440, the following standards associated with force main materials, connections and installation must be met.

Materials. All pipe used for force mains shall be of the pressure type with pressure type joints. The force main shall be constructed of materials with a demonstrated resistance to deterioration from corrosion, acidity, and other chemical action.

1. Consideration should be given to the use of inert materials or protective coatings for either the receiving tank or gravity sewer to prevent deterioration as a result of hydrogen sulfide or other chemical attack. These requirements should be provided for all force mains.

2. All force mains shall be tested at a minimum pressure of at least 50% above the design operating pressure for at least 30 minutes. Leakage shall not exceed the amount given by the formula contained in the most current AWWA Standard C-600.

Installation. Class A, B or C bedding (ASCE Manuals and Reports on Engineering Practice—No. 36, 1974 and the WPCF Manual of Practice—No. 9, 1970) or AWWA pipe installation conditions 3, 4 or 5 (ANSI/AWWA C600-82) shall be provided for installation of pipelines in excavated trenches. Installation of pipelines of flexible materials shall be in accordance with recognized standards.

Force mains shall be sufficiently anchored within the pump station and throughout the line length. The number of bends shall be as few as possible. Thrust blocks, restrained joints, or tie rods shall be provided where restraint is needed.

PAGE : EZ1

Bolar Mountain Camp Ground 14,000 GPD

Denitrification Line

Dripfield Supply Lines

From Effluent

Pump Tanks Dripfield

Return Lines

Field Dose Vol. TBD

Qty.

E‐Z Mod.# 4‐L 6 Recirculation Pumps ON min. 3

Calcite Filter 1 OFF min. 3

Carbon Feed 1

(If Needed) ON min. 5

STEP‐50 Pump 6 OFF min. 25

STEP‐30 Pump 2 Denitrification Pump Myers ME‐45 2

Effluent Filter PL‐525 6 ON min. 5

E‐Z By‐Pass Tee 2 OFF min. 30

Triplex Control 2

Duplex w/ETM 1

Simplex Control 2 ON min. 5

Float Pkgs. 5 OFF min. 15

Gate Valve

4" PVC

1.5" PVC

1" PVC

.75 PVC

Note: Do Not USE Check Valves or Weep Holes On STEP Pumps

4‐L E‐Z Pods Must Be Set Above the Seasonal High Water Table

With Under Drains To Day Light.

10,000 Septic Tank 10,000 Flow Eq

(At 30 GPM)

(At 60 GPM) Flow Eq Pump

7,700 Recirculation 7,700 Recirculation

Timer Settings

Calcite Filter Pump

PAGE : EZ2

18" TO 24"

MAX.COVER

GRADE

CONCRETE OR APPROVED PLASTIC RISERCONCRETE OR APPROVED PLASTIC RISER

FROM EQUALIZATION

PUMP TANK

2" SCH40

TO POD 1-2

2" SCH40

TO POD 1-3

4" SCH40

DRAINLINE

FROM POD 1-3

4" SCH40

DRAINLINE

FROM PODS 1-1

AND 1-2

4" SCH40

TO

RECIRC

TANK #2

STEP-50

Recirc Pump (Pod 1-3)

STEP-50

Recirc Pump

(Pod 1-2)

FLOAT TREE

BRACKET

ENABLE

FLOAT

HIGH

FLOAT

Floats must be set by manufacturer's representative.

7700 GALLONS

RECIRC TANK #1

(PLAN VIEW)

7700 GALLONS

RECIRC TANK #1

1"SCH40 CALCITE

FILTER RETURN LINE

SEE POD LOCATIONS TO LEFT IN

TREATMENT CHAIN FLOW DIAGRAM.

4" SCH40

DRAINLINE

FROM PODS 1-1

AND 1-2FROM EQUALIZATION

PUMP TANK

4" SCH40

TO

RECIRC

TANK #2

EZ

BYPASS

VALVE

STEP-50

Recirc Pump (Pods 1-1)

Bolar Mountain Camp Ground 14,000 GPD

Denitrification Line

Dripfield Supply Lines

From Effluent

Pump Tanks Dripfield

Return Lines

Field Dose Vol. TBD

Qty.

E‐Z Mod.# 4‐L 6 Recirculation Pumps ON min. 3

Calcite Filter 1 OFF min. 3

Carbon Feed 1

(If Needed) ON min. 5

STEP‐50 Pump 6 OFF min. 25

STEP‐30 Pump 2 Denitrification Pump Myers ME‐45 2

Effluent Filter PL‐525 6 ON min. 5

E‐Z By‐Pass Tee 2 OFF min. 30

Triplex Control 2

Duplex w/ETM 1

Simplex Control 2 ON min. 5

Float Pkgs. 5 OFF min. 15

Gate Valve

4" PVC

1.5" PVC

1" PVC

.75 PVC

Note: Do Not USE Check Valves or Weep Holes On STEP Pumps

4‐L E‐Z Pods Must Be Set Above the Seasonal High Water Table

With Under Drains To Day Light.

10,000 Septic Tank 10,000 Flow Eq

(At 30 GPM)

(At 60 GPM) Flow Eq Pump

7,700 Recirculation 7,700 Recirculation

Timer Settings

Calcite Filter Pump

1-1 1-2 1-3

PAGE : EZ3

18" TO 24"

MAX.COVER

GRADE

CONCRETE OR APPROVED PLASTIC RISERCONCRETE OR APPROVED PLASTIC RISER

FROM RECIRC TANK #1

2" SCH40

TO POD 2-2

2" SCH40

TO POD 2-3

4" SCH40

DRAINLINE

FROM POD 2-34" SCH40

DRAINLINE

FROM PODS 2-1

AND 2-2

4" SCH40

DRIPFIELD

DOSING

TANK

FROM RECIRC TANK #1

4" SCH40

TO

DRIPFIELD

DOSING

TANK

STEP-50

Recirc Pump (Pod 2-3

STEP-50

Recirc Pump

(Pod 2-2)

FLOAT TREE

BRACKET

ENABLE

FLOAT

HIGH

FLOAT

Floats must be set by manufacturer's representative.

7700 GALLONS

RECIRC TANK #2

(PLAN VIEW)

7700 GALLONS

RECIRC TANK #2

(SIDE VIEW)

EZ

BYPASS

VALVE

2" SCH40

TO POD 2-1

STEP-50

Recirc Pump (Pod 2-1)

Bolar Mountain Camp Ground 14,000 GPD

Denitrification Line

Dripfield Supply Lines

From Effluent

Pump Tanks Dripfield

Return Lines

Field Dose Vol. TBD

Qty.

E‐Z Mod.# 4‐L 6 Recirculation Pumps ON min. 3

Calcite Filter 1 OFF min. 3

Carbon Feed 1

(If Needed) ON min. 5

STEP‐50 Pump 6 OFF min. 25

STEP‐30 Pump 2 Denitrification Pump Myers ME‐45 2

Effluent Filter PL‐525 6 ON min. 5

E‐Z By‐Pass Tee 2 OFF min. 30

Triplex Control 2

Duplex w/ETM 1

Simplex Control 2 ON min. 5

Float Pkgs. 5 OFF min. 15

Gate Valve

4" PVC

1.5" PVC

1" PVC

.75 PVC

Note: Do Not USE Check Valves or Weep Holes On STEP Pumps

4‐L E‐Z Pods Must Be Set Above the Seasonal High Water Table

With Under Drains To Day Light.

10,000 Septic Tank 10,000 Flow Eq

(At 30 GPM)

(At 60 GPM) Flow Eq Pump

7,700 Recirculation 7,700 Recirculation

Timer Settings

Calcite Filter Pump

2-32-22-1

PAGE : EZ4

2021-06-11T17:07:09-0400
JOBY TIMM
2021-06-13T08:55:11-0400
MARK MENG

File details come from the government source that posted it. Updated .