Questions - Answers 002 - 7-28-2025.pdf

PDF 65 KB Posted

Attached to
Lovell Well Construction Project Federal contract opportunity
Solicitation number
1240LT25R0022
Issued by
Department of Agriculture Forest Service

About this file

This document is a Questions and Answers (Q&A) addendum for the Humboldt Toiyabe Lovell Well Construction Project, dated 7/28/2025. The Q&A addresses eight key queries from potential contractors regarding the well construction project, including site-specific details such as water sources, work limitations, and technical specifications. Notable responses include confirmation that no soil logs are available, a water source may be in Mountain Springs (to be verified by the contractor), no work hour limitations exist, and specific technical details about the packer (Tri-Seal "K" Packer, Blank Style by Western Rubber and Manufacturing). The document also clarifies operational procedures like stockpiling cuttings and diverting development and performance test water, while acknowledging uncertainties about overburden and water table depth.

View the file

Other files for this federal contract opportunity

Other files attached to Lovell Well Construction Project, newest first.
File Type Posted
0.1 1240LT25R0022 Amendment 0001.pdf PDF
Questions - Answers 003 - 7-30-2025.pdf PDF
Questions - Answers 001 - 7-21-2025.pdf PDF
Lovell Canyon Well Pre-bid Sign in Sheet.pdf PDF
1. Lovell Well SOI.xlsx XLSX spreadsheet
2. Specifications.pdf PDF
0. 1240LT25R0022 - Solicitation.pdf PDF
3. Drawings.pdf PDF
4. Experience Questionnaire.doc DOC document
5. WD # NV20250038 Building - Clark Co..pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Humbolt Toiyabe

Lovell Well Construction Project

Questions and Answers 002 7/28/2025

1Q: Are nearby soil logs available?

1A: No soil logs are available.

2Q: How far is the nearest water source and is it available?

2A: Water source may be available in Mtn. Springs, contractor needs to verify and source.

3Q: Are there any work hour limitations?

3A: No.

4Q: Please describe (Make-model, type) packer depicted above the screen in the provided Well construction sheet.

4A: Spec 332100 Section 2.4 B.1 Model: Tri-Seal “K” Packer, Blank Style, as manufactured by Western Rubber and Manufacturing.

5Q: Can cuttings be stockpiled on plastic and then be spread after analysis assuming Non-Haz analytical?

5A: Yes.

6A: Can development and performance test water be diverted to the ground in an area away from the well location?

6Q: Yes.

7Q: How much overburden is anticipated?

7A: Unknown.

8Q: Rough idea where the water table sits at this location?

8A: Unknown.

File details come from the government source that posted it. Updated .