1. Lovell Well SOI.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Lovell Well Construction Project Federal contract opportunity
- Solicitation number
- 1240LT25R0022
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a Schedule of Items (SOI) for the Lovell Well Construction Project, solicitation number 1240LT25R0022, issued by the Department of Agriculture Forest Service for the Humboldt-Toiyabe National Forest in Clark County, Nevada. The project involves constructing a new potable water well at Mountain Springs in the Spring Mountains National Recreation Area, with a comprehensive scope of work including mobilization, well drilling, well casing, concrete grout, well screen installation, well accessories, well development, performance testing, and water analysis.
The solicitation requires a firm fixed-price contract with pricing for all listed items, including base work and an optional well abandonment item. Key technical specifications include drilling a 450-linear-foot borehole with 8-inch steel casing, installing a 6-inch stainless steel well screen, and applying a neat cement grout seal. Contractors must submit a quote with a minimum 60-day acceptance period, provide a bid guarantee, and include bond premium payments within the mobilization line item. The contract will be awarded based on comprehensive pricing across all specified work items.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0.1 1240LT25R0022 Amendment 0001.pdf | ||
| Questions - Answers 003 - 7-30-2025.pdf | ||
| Questions - Answers 002 - 7-28-2025.pdf | ||
| Questions - Answers 001 - 7-21-2025.pdf | ||
| Lovell Canyon Well Pre-bid Sign in Sheet.pdf | ||
| 0. 1240LT25R0022 - Solicitation.pdf | ||
| 3. Drawings.pdf | ||
| 4. Experience Questionnaire.doc | DOC document | |
| 5. WD # NV20250038 Building - Clark Co..pdf | ||
| 2. Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
| Humboldt-Toiyabe National Forest | ||||||
| Clark County, NV | ||||||
| LOVELL WELL CONSTRUCTION | ||||||
| ITEM NUMBER | DESCRIPTION | METHOD OF MEAS | UNIT | QUANTITY | Unit Price | Total |
| 011900 | Mobilization | LSQ | LS | 1 |
| 322100-1 | Well Drilling: Borehole to Receive an 8-Inch Well Casing | AQ | LF | 450 |
| 332100-2 | Well Drilling, Oversize Borehole for Grout Seal: 12-Inch | AQ | LF | 55 |
| 332100-3 | Well Casing: 8-Inch Steel Casing | AQ | LF | 473 |
| 332100-4 | Neat Cement Grout Seal | AQ | 94# Bag | 40 |
| 332100-5 | Well Screen: 6" Stainless Steel | LSQ | LS | 1 |
| 332100-6 | Well Accessories | LSQ | LS | 1 |
| 332100-7 | Developing Well | LSQ | LS | 1 |
| 332100-8 | Well Preformance Testing | LSQ | LS | 1 |
| 332100-9 | Water Analysis | LSQ | LS | 1 |
| Total Base |
| Option 1 | ||||
| 332100-10 | Abandonment of Well | LSQ | LS | 1 |
Base Total + Option:
B.2 SCHEDULE NOTES
a) One Firm Fixed Price contract will be awarded from this solicitation; contractors must submit pricing for all items.
b) Please provide a quote expiration date in box 17 on page two above. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
c) Payment for bond premiums will be required in accordance with FAR 52.228-15. In accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Base Item 011900 – Mobilization.
d) A bid guarantee is required for this solicitation. See FAR 52.228-1 Bid Guarantee (SEP 1996) in Section L.
File details come from the government source that posted it. Updated .