BridgeportSewer-2019_Plans_Rev1_08.09.2021.pdf

PDF 5 MB Posted

Attached to
Bridgeport Sewer Replacement
Solicitation number
1240LR21R0007
Issued by

About this file

This solicitation is for a sewer replacement project at a Forest Service administrative site located in Bridgeport, California. The project includes reconstructing the entire onsite wastewater system by installing new sewer lines, cleanouts, manholes, and RV sewer connections; installing new septic tanks and absorption fields; installing a new packaged effluent lift station and aggregate access road; and removing an existing packaged sewage treatment system and steel building. The estimated price for the project is between $250,000 and $500,000. Work will be performed at the Bridgeport Ranger District Administration Site located approximately 4 miles west of Bridgeport in Mono County.

View the file

Other files

File Type Posted
BridgeportSewer.SOI_082021.xlsx XLSX spreadsheet
Amendment 3.pdf PDF
Copy of BridgeportSewer.SOI_082021.xlsx XLSX spreadsheet
Amendment 2.pdf PDF
BridgeportSewer.SOI.Rev1-08.09.2021.xlsx XLSX spreadsheet
ProfilePercs.pdf PDF
RFIBridgeportSewer072621.pdf PDF
Amendment 1.pdf PDF
1240LR21R0007.pdf PDF
ATTACH 1_BridgeportSewer_Specs_Final_09.23.2020.pdf PDF
ATTACH 4_WAGE DETERMINATION.pdf PDF
ATTACH 3_EngineeringReport_BridgeportSewer_09.24.2020.pdf PDF
ATTACH 2_BridgeportSewer-2019_Plans_Signed_10.14.2020.pdf PDF
Attach_5_Determination of Responsibility.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/9 /21

:0

8 K

CA

RN

ES

C:

\U

SE

RS

\K

CA

RN

ES

\D

OC

UM

EN

TS

\R

4 P

RO

JE

CT

S\

HU

MB

OL

DT

-T

OI

YA

BE

\B

RI

DG

EP

OR

T.

SE

W

ER

.20

\D

RA

W

IN

GS

\02

_G 2.B

RI

DG

EP

OR

TS

EW

ER

_S

CH

ED

UL

E.

DW

G

R4

INTERMOUNTAIN REGION

BRIDGEPORT

SEWER SYSTEM

REPLACEMENT

PROJECT

HUMBOLDT-TOIYABE

NATIONAL FOREST

BRIDGEPORT DISTRICT

SCHEDULE OF ITEMS

09/29/2020

K CARNES

K CARNES

D JEPPSEN

G-2

8/9/21FIELD SIZE

2 22

WORK FOR THIS PROJECT CONSISTS OF RECONSTRUCTING THE SITE SEWER SYSTEM

FOR A FOREST SERVICE ADMINISTRATION SITE. WORK IS TO INCLUDE INSTALLING 8”, 6”,

AND 4” GRAVITY SEWER LINES, LATERALS, AND CLEANOUTS; INSTALLING 2" PRESSURE

SEWER MAIN; INSTALLING RV SEWER HOOKUPS; INSTALLING MANHOLES; CAPPING

EXISTING SERVICE LINES TO BE ABANDONED; REPAIRING AGGREGATE SURFACE

ROADS; INSTALLING SEPTIC TANKS, A PACKAGE EFFLUENT LIFT STATION SYSTEM, AND

ABSORPTION FIELDS; AND REMOVING AN EXISTING PACKAGE SEWAGE TREATMENT

SYSTEM AND STEEL BUILDING.

DIRECTOR OF ENGINEERING

DATE

APPROVED:

AutoCAD SHX Text

SCHEDULE OF ITEMS

AutoCAD SHX Text

DESCRIPTION OF WORK

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

W

W

W

W

W

W

W

W

W

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

E

E

E

E

E

E

E

S

S

S

S

S

S

S

S

S

S

S

S

T

T

T

T

W

W

W

S

S

S

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

E

E

E

E

E

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

OIL

TANK

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

G

U

Y

G

U

Y

G

U

Y

G

U

Y

G

U

Y

OIL

TANK

PROP

TANK

PROP

TANK

PROP

TANK

PROP

TANK

S

S

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

E

E

S

LEGEND:

NEW SEWERLINE

EXISTING SEWERLINE

NEW WATERLINE

EXISTING WATERLINE

NEW ELECTRICAL LINE

EXISTING ELECTRICAL LINE

REMOVED ELECTRICAL LINE

EXISTING FENCE LINE

EXISTING GAS LINE

MANHOLE (EXIST / PROPOSED)

CLEANOUT (EXIST / PROPOSED)

ABANDONED TANK TO BE REMOVED

RV SEWER CONNECTION (PROPOSED)

CURB VALVE AND BOX (EXIST / PROPOSED)

HYDRANT (EXIST / PROPOSED)

DRAIN - DAYLIGHT OR PUMPOUT (EXIST)

TEST STATION (EXIST)

WELL (EXIST)

SOILS TEST PIT LOCATION

CREEK

EXISTING ROADWAY

NEW AGGREGATE ROADWAY OR PATCH

MAJOR CONTOUR AND ELEVATION (FEET)

NOTE: EXISTING SYMBOLS ARE LIGHT/GRAY; NEW SYMBOLS ARE SOLID/DARK

S

S

W

W

E

E

X

G

E

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/6 /21

:1

2 K

CA

RN

ES

C :\U

SE

RS

\K

CA

RN

ES

\D

OC

UM

EN

TS

\R

4 P

RO

JE

CT

S\

HU

MB

OL

DT

-T

OI

YA

BE

\B

RI

DG

EP

OR

T.

SE

W

ER

.20

\D

RA

W

IN

GS

\S

1- S4

.B

RI

DG

EP

OR

TS

EW

ER

_S

IT

E.

DW

G;

R4

INTERMOUNTAIN REGION

BRIDGEPORT

SEWER SYSTEM

REPLACEMENT

PROJECT

HUMBOLDT-TOIYABE

NATIONAL FOREST

BRIDGEPORT DISTRICT

SITE PLAN

OVERVIEW

09/29/2020

K CARNES

K CARNES

D JEPPSEN

S-2

8/7/21FIELD SIZE

4 22

CHAMBER SYSTEM

ABSORPTION FIELD #2

(SEE SHEET D-2)

BACKUP FIELD #2

LOCATION

CHAMBER SYSTEM

ABSORPTION FIELD #1

(SEE SHEET D-2)

BACKUP FIELD #1

LOCATION

EXISTING

WATER WELLS

PLACE AGGREGATE

SURFACE ROAD REPAIR

PLACE AGGREGATE

SURFACE ROAD REPAIR

PLACE AGGREGATE

SURFACE ROAD REPAIR

BRIDGEPORT

ADMINISTRATION

SITE

SOUTH DETAIL

SEE SHEET S-3

ROCK POST STRUCTURES

DO NOT DISTURB

BUNKHOUSE 1

BUNKHOUSE 2

BUNKHOUSE 3

HOUSE A

HOUSE B

HOUSE C

BARN

GASHOUSE

(STORAGE)

RV SITE #4

SEE NOTE 5

U

S

H

I

G

H

W

A

Y

NEW SEWER SYSTEM TO LIFT

STATION AND ABSORPTION

FIELD #1 (SEE WW SHEETS)

NEW SEWER SYSTEM TO GRAVITY

SEPTIC SYSTEM AND ABSORPTION

FIELD #2 (SEE WW SHEETS)

NOTES:

GENERAL:

1. LOCATION AND ORIENTATION OF ALL STRUCTURES SHALL BE APPROVED BY THE

CONTRACTING OFFICER PRIOR TO INSTALLATION.

2. AN EXTENSIVE EFFORT HAS BEEN MADE TO LOCATE ALL POSSIBLE EXISTING UTILITY

LINES FROM RECORDS AND EVIDENCE IN THE FIELD, HOWEVER, THE COMPLETENESS OR

ACCURACY OF THE LOCATIONS SHOWN CANNOT BE GUARANTEED. THE CONTRACTOR IS

RESPONSIBLE FOR ESTABLISHING THE LOCATION OF ALL EXISTING UTILITIES. ANY

LOCATION STAKED OR SHOWN IS APPROXIMATE. CALL 811 TO HAVE UTILITIES MARKED

BEFORE BEGINNING CONSTRUCTION. IF CONFLICTS ARE FOUND, NOTIFY THE

CONTRACTING OFFICER.

3. CLEARING LIMITS SHALL BE 5 FEET ON BOTH SIDES OF THE SEWERLINE TRENCH OR

STRUCTURE EXCAVATION. THE CONTRACTOR SHALL USE CAUTION AND AVOID DAMAGE

TO TREES AND VEGETATION. THE CONTRACTOR SHALL CONFINE ALL OPERATIONS AND

ACTIVITIES TO WITHIN THE CLEARING LIMITS.

4. THE SITE FOR THIS PROJECT IS AN AREA WITH A HIGH INCIDENCE OF HISTORIC AND

PREHISTORIC ARTIFACTS. SOME WORK MAY REQUIRE COORDINATION WITH AND/OR

OVERSIGHT BY AN ARCHEOLOGIST. SEE SPECIFICATIONS SECTION 011500 FOR SPECIFIC

REQUIREMENTS.

DEMOLITION:

5. THE SERVICE LATERAL TO RV SITE #4 WILL SERVE AN OCCUPIED MOBILE HOME OWNED

BY THE TENANT. CONNECTION TO THE NEW RV HOOKUP WILL BE THE RESPONSIBILITY OF

THE TENANT.

6. THE NEW SEWER LINES WILL FREQUENTLY PASS THROUGH AREAS WITH EXISTING

SPRINKLER SYSTEMS. SPRINKLER SYSTEMS ARE THOUGHT TO BE OUT OF SERVICE AND

WILL NOT HAVE TO BE REPAIRED. HOWEVER, THERE MAY BE INSTANCES WHERE A

SPRINKLER SUPPLY LINE IS INADVERTENTLY STILL OPEN TO THE SUPPLY. CARE SHALL BE

TAKEN TO CHECK DISCOVERED LINES FOR POSSIBLE LIVE CONNECTION.

RESTORATION:

7. ALL LANDSCAPE AND NATIVE SURFACE AREAS ARE TO BE RESTORED TO A LEVEL

PREPARED FOR SEEDING BY THE FOREST SERVICE. TRENCHES IN LAWN AREAS ARE TO

BE TOPPED WITH CONSERVED TOPSOIL. BACKFILLS IN BOTH LAWN AND NATIVE SOIL

AREAS ARE TO BE SURFACE RAKED IN PREPARATION FOR SEEDING.

S

W

A

U

G

R

C

E

E

K

S

PLACE AGGREGATE

SURFACE ROAD REPAIR

PLACE AGGREGATE

SURFACE ROAD REPAIR

REPLACE 4" THICK

CONCRETE SIDEWALK

P R

O P

E R

T

B

O U

N D

A R

Y

DIRECTOR OF ENGINEERING

DATE

APPROVED:

AutoCAD SHX Text T

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text V

AutoCAD SHX Text B

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text H

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text D

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text H

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text D

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text H

AutoCAD SHX Text W

AutoCAD SHX Text M

AutoCAD SHX Text D

AutoCAD SHX Text V

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text

TP

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text 50'

AutoCAD SHX Text 100'

AutoCAD SHX Text 50'

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

E

E

E

E

E

E

E

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

E

E

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

G

U

Y

G

U

Y

G

U

Y

G

U

Y

G

U

Y

S

S

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

E

E

S

LEGEND:

NEW SEWERLINE

EXISTING SEWERLINE

NEW WATERLINE

NEW ELECTRICAL LINE

EXISTING ELECTRICAL LINE

EXISTING FENCE LINE

MANHOLE (EXIST / PROPOSED)

CLEANOUT (EXIST / PROPOSED)

RV SEWER CONNECTION (PROPOSED)

CURB VALVE AND BOX (PROPOSED)

HYDRANT (PROPOSED)

EXISTING ROADWAY

NEW AGGREGATE ROADWAY OR PATCH

MAJOR CONTOUR AND ELEVATION (FEET)

NOTE: LEGEND APPLIES TO THIS SHEET ONLY

S

S

W

E

E

X

STAKEOUT POINTS

POINT

NORTHING

9999.1

9905.1

9870.0

9787.3

9677.3

9542.9

9413.1

9387.1

9345.3

9770.9

9758.8

9710.5

9642.8

9638.0

9619.3

9562.4

9617.7

9814.8

9840.8

9945.5

9972.0

9943.9

9941.7

9923.3

9976.2

9942.4

9923.9

9880.2

9891.3

9759.3

EASTING

10336.8

10369.3

10416.7

10528.5

10606.7

10702.4

10671.8

10665.6

10655.7

10170.2

10218.7

10281.3

10263.5

10262.2

10257.3

10395.3

10360.3

10383.6

10456.1

10472.7

10433.5

10471.5

10474.4

10499.4

10432.9

10478.6

10503.5

10562.6

10547.6

10663.9

DESCRIPTION

STA "A" 0+50.5 - CLEANOUT

STA "A" 1+50.0 - CLEANOUT

STA "A" 2+09.0 - MH #1

STA "A" 3+48.0 - MH #2

STA "A" 4+83.0 - LINE "H" WYE

STA "A" 6+48.0 - MH #3

STA "A" 7+81.3 - LINE "J" WYE

STA "A" 8+08.0 - TANK INLET

STA "A" 8+51.0 - PUMP BASIN

STA "B" 0+30.0 - CLEANOUT

STA "B" 0+80.0 - MH #4

(NOT USED)

STA "B" 2+04.3 - MH #5

STA "B" 2+09.3 - TANK INLET

STA "B" 2+28.6 - BEND

STA "C" 1+88.9 - CLEANOUT

STA "C" 1+20.0 - CLEANOUT

STA "D" 0+20.0 - CLEANOUT

STA "A" 2+58.0 - LINE "D" WYE

STA "E" 1+14.0 - CLEANOUT

STA "F" 0+19.7 - BEND TO RV

STA "F" 0+67.0 - LINE "E" WYE

STA "F" 0+70.7 - WYE TO RV

STA "F" 1+01.7 - BEND TO RV

RV HOOKUP

RV HOOKUP

RV HOOKUP

STA "G" 1+19.0 - CLEANOUT

RV HOOKUP

STA "H" 1+20.0 - CLEANOUT

STAKEOUT POINTS

POINT

NORTHING

9814.2

9629.5

9657.0

9445.1

9346.4

9346.8

9315.8

9417.7

9379.3

9380.2

9385.9

9468.8

9618.0

9614.5

9586.3

9332.2

9256.0

9313.0

9334.6

9339.8

9311.3

9384.3

9277.3

EASTING

10735.3

10752.3

10743.7

10634.8

10651.1

10649.4

10574.4

10425.9

10327.6

10324.2

10320.9

10272.5

10255.1

10249.1

10200.7

10619.3

10553.7

10621.4

10653.2

10572.1

10635.6

10652.8

10627.5

DESCRIPTION

STA "H" 2+10.0 - RV HKUP

STA "I" 1+30.0 - CLEANOUT

STA "I" 1+58.8 - CLEANOUT

STA "J" 0+20.0 - CLEANOUT

STA "P" 4+76.6 - TEE

STA "P" 4+74.9 - BEND

STA "P" 3+93.7 - BEND

STA "P" 2+13.6 - BEND

STA "P" 1+08.0 - BEND

STA "P" 1+04.5 - DIST. BOX

STA "P" 0+98.0 - C/L FIELD

STA "P" 0+02.0 - C/L FIELD

STA "B" 2+31.1 - DIST. BOX

STA "B" 2+38.1 - C/L FIELD

STA "B" 2+94.1 - C/L FIELD

BEND

CONNECT TO EXIST LINE

WATER VALVE

HYDRANT

ROAD C/L

ROAD INTERSECTION

ROAD C/L

ROAD C/L

CONTROL POINTS

POINT

NORTHING

10000.00

9575.69

9584.08

9858.76

9853.48

9646.55

10068.77

9519.36

9334.64

9473.52

9391.47

9746.52

EASTING

10000.00

10361.88

10642.91

10704.77

10472.00

9362.95

9516.65

9987.18

10307.29

10440.48

10633.42

10723.37

ELEV.

6480.20

6469.36

6458.16

6459.14

6463.84

6500.00

6495.36

6469.90

6471.06

6469.91

6462.01

6457.62

DESC.

CP 1

CP 2

CP 3

CP 4

CP 8

CP 9

CP 10

CP 11

CP 12

CP 5

CP 6

CP 7

CHECK POINTS

POINT

NORTHING

9769.84

9832.73

10032.72

9680.54

9557.57

9629.93

9572.58

9599.94

9431.53

EASTING

10209.04

10320.95

10253.46

10195.51

10389.13

10422.14

10692.72

10675.26

10573.94

ELEV.

6471.14

6468.64

6472.34

6470.72

6469.57

6466.40

6457.14

6459.08

6462.93

DESC.

MH LID

CONC COR

CONC COR

CONC COR

CONC COR

MH LID

MH LID

CONC COR

CONC COR

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/6 /21

:1

2 K

CA

RN

ES

C :\U

SE

RS

\K

CA

RN

ES

\D

OC

UM

EN

TS

\R

4 P

RO

JE

CT

S\

HU

MB

OL

DT

-T

OI

YA

BE

\B

RI

DG

EP

OR

T.

SE

W

ER

.20

\D

RA

W

IN

GS

\S

1- S4

.B

RI

DG

EP

OR

TS

EW

ER

_S

IT

E.

DW

G;

R4

INTERMOUNTAIN REGION

BRIDGEPORT

SEWER SYSTEM

REPLACEMENT

PROJECT

HUMBOLDT-TOIYABE

NATIONAL FOREST

BRIDGEPORT DISTRICT

CONSTRUCTION SURVEY

POINTS AND CONTROL

09/29/2020

K CARNES

K CARNES

D JEPPSEN

S-4

8/7/21FIELD SIZE

6 22

CHAMBER SYSTEM

LEACH FIELD #2

(SEE SHEET D-2)

CHAMBER SYSTEM

LEACH FIELD #1

(SEE SHEET D-2)

BRIDGEPORT

ADMINISTRATION

SITE

BUNKHOUSE 1

BUNKHOUSE 2

BUNKHOUSE 3

HOUSE A

HOUSE B

HOUSE C

BARN

GASHOUSE

(STORAGE)

G

H

W

NOTES:

1. BENCHMARKS SHOWN HAVE BEEN CREATED

AND USED IN PRIOR SURVEYS, BUT MAY NO

LONGER BE PRESENT AND UNDAMAGED.

VERIFY ALL FOUND BENCHMARKS FOR

HORIZONTAL AND VERTICAL ACCURACY.

2. TO ASSIST WITH BENCHMARK VERIFICATION,

SUGGESTED CHECK POINTS ARE PROVIDED

THAT ARE EASILY FOUND, REPEATABLE POINTS.

ALL ARE SUGGESTED FOR CONFIRMING

HORIZONTAL ACCURACY. MANHOLE LIDS MAY

HAVE BEEN ADJUSTED FOR GRADE AND ARE

NOT ADVISED FOR VERTICAL ACCURACY

CHECKS.

3. A "BEST FIT" OF ALL RELIABLE BENCHMARKS

AND CHECKPOINTS WILL BE CONSIDERED

SUITABLE FOR A PROJECT COORDINATE

SYSTEM. FOR EACH FOUND POINT, PROVIDE TO

THE CONTRACTING OFFICER:

· THE ACTUAL AND CALCULATED

COORDINATES, AND

· THE BEARING AND DISTANCE BETWEEN THE

ACTUAL AND CALCULATED COORDINATES.

CONTINUE WITH CONSTRUCTION POINT

STAKEOUT ONLY AFTER APPROVAL OF THE

COORDINATE SYSTEM BY THE CONTRACTING

OFFICER.

DIRECTOR OF ENGINEERING

DATE

APPROVED:

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text H

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text V

AutoCAD SHX Text H

AutoCAD SHX Text M

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text 50'

AutoCAD SHX Text 100'

AutoCAD SHX Text 50'

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

OIL

TANK

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

G

U

Y

G

U

Y

G

U

Y

G

U

Y

G

U

Y

OIL

TANK

PROP

TANK

PROP

TANK

PROP

TANK

PROP

TANK

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

E

E

E

E S

S

S

S

S

S

S

S

S

S

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/6 /21

:3

4 K

CA

RN

ES

C :\U

SE

RS

\K

CA

RN

ES

\D

OC

UM

EN

TS

\R

4 P

RO

JE

CT

S\

HU

MB

OL

DT

-T

OI

YA

BE

\B

RI

DG

EP

OR

T.

SE

W

ER

.20

\D

RA

W

IN

GS

\W

W 1-

W W

9.B

RI

DG

EP

OR

TS

EW

ER

_W

AS

TE

W

AT

ER

.D W

G;

R4

INTERMOUNTAIN REGION

BRIDGEPORT

SEWER SYSTEM

REPLACEMENT

PROJECT

HUMBOLDT-TOIYABE

NATIONAL FOREST

BRIDGEPORT DISTRICT

WASTEWATER

OVERVIEW

SEWER MAINS INDEX

AND NOTES

09/29/2020

K CARNES

K CARNES

D JEPPSEN

WW-1

8/6/21FIELD SIZE

7 22

LEACHING CHAMBER

ABSORPTION FIELDS - SEE

SHEET D-2

REPLACEMENT ABSORPTION

FIELD LOCATIONS

PRESSURE

SEWER LINE

BRIDGEPORT

ADMINISTRATION

SITE

S

E

W

S

E

S

E

S E

E

S

H E

NOTES:

1. ALL SEWERLINE SHALL BE SLOPED TO THE FOLLOWING MINIMUM GRADES UNLESS SPECIFIED ON THE PLAN AND

PROFILE SHEETS:

1.1. 4" PVC - 2.0%

1.2. 6" PVC - 1.0%

1.3. 8" PVC - 0.5%

1.4. 2" PRESSURE - 1% TO DRAIN.

2. BURY SEWERLINE A MINIMUM OF 48 INCHES WHEREVER PRACTICAL. USE BLUE BOARD INSULATION WHEN

SEWERLINES ARE LESS THAN 36 INCHES DEEP, AND UNDER ROADS WHEN LESS THAN 48 INCHES DEEP. SEE

PLAN AND PROFILE SHEETS AND NOTE 8 BELOW.

3. LOCATION AND ORIENTATION OF ALL STRUCTURES SHALL BE APPROVED BY THE CONTRACTING OFFICER PRIOR

TO INSTALLATION.

4. AN EXTENSIVE EFFORT HAS BEEN MADE TO LOCATE ALL POSSIBLE EXISTING UTILITY LINES FROM RECORDS AND

EVIDENCE IN THE FIELD, HOWEVER, THE COMPLETENESS OR ACCURACY OF THE LOCATIONS SHOWN CANNOT BE

GUARANTEED. THE CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING THE LOCATION OF ALL EXISTING

UTILITIES. ANY LOCATION STAKED OR SHOWN IS APPROXIMATE. CALL 811 TO HAVE UTILITIES MARKED BEFORE

BEGINNING CONSTRUCTION. IF CONFLICTS ARE FOUND, NOTIFY THE CONTRACTING OFFICER.

5. INSTALL THE SEWER SYSTEM ACCORDING TO APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS FOR

SANITARY DRAINAGE AND PRIVATE SEWAGE DISPOSAL SYSTEMS; INCLUDING THE 2016 CALIFORNIA PLUMBING

CODE, AND THE MONO COUNTY LOCAL AREA MANAGEMENT PROGRAM (LAMP).

6. CLEARING LIMITS SHALL BE 5 FEET ON BOTH SIDES OF THE SEWERLINE TRENCH OR STRUCTURE EXCAVATION.

THE CONTRACTOR SHALL USE CAUTION AND AVOID DAMAGE TO TREES AND VEGETATION. THE CONTRACTOR

SHALL CONFINE ALL OPERATIONS AND ACTIVITIES TO WITHIN THE CLEARING LIMITS.

7. INSTALL CLEANOUTS ON GRAVITY SEWERLINES AT INTERVALS NOT TO EXCEED 100 FEET AND AT EACH CHANGE

IN DIRECTION.

8. WHERE SEWERLINE CROSSES UNDER A ROADWAY OR PARKING AREA LESS THAN 48" DEEP, THE SEWERLINE

SHALL BE INSULATED. THE INSULATION SHALL EXTEND 10' BEYOND THE EDGE OF THE ROAD OR PARKING AREA.

SEE TRENCH INSULATION DETAIL 2/D-3.

9. SEPTIC TANKS SHALL BE INSTALLED A MINIMUM OF 10' FEET FROM WATERLINES.

10. SEE SHEETS WW-3 TO WW-8 FOR GRAVITY SEWERLINE PROFILES. SEE SHEET WW-9 FOR PRESSURE LINE

PROFILE.

11. WHERE NEW SEWERLINES INTERSECT EXISTING WATERLINES, THE NEW SEWERLINES SHALL BE INSTALLED

ACCORDING TO APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, INCLUDING CALIFORNIA PLUMBING

CODE SECTION 720, "SEWER AND WATER PIPES."

12. ENSURE BUILDINGS SERVED BY THE EXISTING SEWER SYSTEM REMAIN WITH SERVICE UNTIL SUCH TIME AS THE

NEW SEPTIC AND PUMP SYSTEMS ARE OPERATIONAL. IF AN EXISTING SEWER LINE MUST BE CUT TO CONTINUE

WITH CONSTRUCTION, ENSURE ALL UPSTREAM BUILDINGS SERVED BY THE LINE TO BE CUT HAVE BEEN

TRANSFERRED TO THE NEW SYSTEM, OR INSTALL A TEMPORARY SEWAGE BYPASS. SUBMIT A PLAN FOR EACH

SEWAGE BYPASS TO THE CONTRACTING OFFICER.FOR APPROVAL PRIOR TO INSTALLATION.

13. THE EXISTING TREATMENT FACILITY MUST REMAIN IN OPERATION UNTIL SUCH TIME THAT THE NEW TREATMENT

SYSTEMS ARE INSTALLED, OPERATING, AND ACCEPTED BY THE CONTRACTING OFFICER; AND ALL SERVED

FACILITIES HAVE BEEN TRANSFERRED TO THE NEW SYSTEMS.

SEPTIC TANKS AND PUMP

SYSTEM - SEE SHEET D-1

SEPTIC TANK

L

I

N

L

I

L

I

L

I

L

I

P

EXPANDED SITE VIEW

EXISTING ABSORPTION

FIELDS TO BE RETAINED

FOR BACKUP TREATMENT

EXISTING 2" PVC

PRESSURE SEWER LINE

NEW

ABSORPTION

FIELDS

CONNECTION TO

EXISTING 2" PVC

PRESSURE SEWER

NEW LIFT

STATION

G

H

W

DIRECTOR OF ENGINEERING

DATE

APPROVED:

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text H

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text 50'

AutoCAD SHX Text 100'

AutoCAD SHX Text 50'

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text 250'

AutoCAD SHX Text 500'

250'

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

OIL

TANK

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

G

U

Y

G

U

Y

G

U

Y

G

U

Y

G

U

Y

OIL

TANK

PROP

TANK

PROP

TANK

PROP

TANK

PROP

TANK

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

E

E

E

E

S

S

LEGEND:

NEW SEWERLINE

EXISTING SEWERLINE

NEW WATERLINE

EXISTING WATERLINE

NEW ELECTRICAL LINE

EXISTING ELECTRICAL LINE

ELECTRICAL LINE TO BE REMOVED

EXISTING FENCE LINE

EXISTING GAS LINE

MANHOLE (EXIST / NEW)

CLEANOUT (EXIST / NEW)

RV SEWER HOOKUP (NEW)

ABANDONED TANK (EXIST TO REMOVE)

CURB VALVE AND BOX (EXIST / NEW)

HYDRANT (EXIST / NEW)

DRAIN - DAYLIGHT OR PUMPOUT (EXIST)

TEST STATION (EXIST)

WELL (EXIST)

SOILS TEST PIT

CREEK

EXISTING ROAD

NEW ROAD

MAJOR CONTOUR AND ELEVATION (FEET)

SIGN

NOTE: EXISTING SYMBOLS ARE LIGHT/GRAY;

NEW SYMBOLS ARE SOLID/DARK

W

W

S

S

E

E

X

G

E

L

I

G

L

I

J

S

E

S

E

S

E

S

E

S

E

S

E

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/6 /21

:3

4 K

CA

RN

ES

C :\U

SE

RS

\K

CA

RN

ES

\D

OC

UM

EN

TS

\R

4 P

RO

JE

CT

S\

HU

MB

OL

DT

-T

OI

YA

BE

\B

RI

DG

EP

OR

T.

SE

W

ER

.20

\D

RA

W

IN

GS

\W

W 1-

W W

9.B

RI

DG

EP

OR

TS

EW

ER

_W

AS

TE

W

AT

ER

.D W

G;

R4

INTERMOUNTAIN REGION

BRIDGEPORT

SEWER SYSTEM

REPLACEMENT

PROJECT

HUMBOLDT-TOIYABE

NATIONAL FOREST

BRIDGEPORT DISTRICT

WASTEWATER

OVERVIEW

SEWER SERVICE INDEX

AND LEGEND

09/29/2020

K CARNES

K CARNES

D JEPPSEN

WW-2

8/6/21FIELD SIZE

8 22

LEACHING CHAMBER

ABSORPTION FIELDS - SEE

SHEET D-2

REPLACEMENT ABSORPTION

FIELD LOCATIONS

SEPTIC TANKS AND PUMP

SYSTEM - SEE SHEET D-1

PRESSURE

SEWER LINE

SEPTIC TANK

BRIDGEPORT

ADMINISTRATION

SITE

ABBREVIATIONS:

ABAND ABANDONED

ACP ASBESTOS CEMENT PIPE

CO CLEANOUT

EX EXISTING

EXIST EXISTING

ELEC ELECTRICAL

GSP GALVANIZED STEEL PIPE

HDPE HIGH DENSITY POLYETHYLENE (PIPE)

IE INVERT ELEVATION

MH MANHOLE

PVC POLYVINYL CHLORIDE (PIPE)

L

I

F

L

I

D

L

I

L

I

L

I

DIRECTOR OF ENGINEERING

DATE

APPROVED:

AutoCAD SHX Text D

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text H

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text H

AutoCAD SHX Text W

AutoCAD SHX Text M

AutoCAD SHX Text D

AutoCAD SHX Text V

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text

TP

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text 50'

AutoCAD SHX Text 100'

AutoCAD SHX Text 50'

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

0+00 1+00 2+00

1.0

EXISTING GRADE

6" PVC GRAVITY SEWER 4" PVC GRAVITY SEWER

STA: 1+20.0

IE: 6466.80

INSTALL 22° BEND,

6X4 ECC. REDUCER,

AND CLEANOUT

STA: 1+88.9±

IE: 6468.532±

CONNECT TO EXIST

4" ACP SERVICE,

INSTALL CLEANOUT

STA: 1+80.9 TO 1+88.9±

REMOVE EXIST 4" ACP

SERVICE AND CLEANOUT

INSTALL 2" THICK

INSULATION BOARD

(SEE DETAIL 2/D-3)

HOUSE

BASE-

MENT

NEW SEWERLINE (TYP)

STA: 0+20.0

IE (N,E) - 6" IN: 6465.84

IE (S) - 6" OUT: 6465.80

INSTALL MANHOLE #5

0+00 1+00 2+00 3+00

EXISTING GRADE

4" PVC

GRAVITY SEWER

6" PVC GRAVITY SEWER

4" PVC

EFFLUENT

LINES

ABSORPTION FIELD

(SEE SHEET D-2

FOR DETAIL VIEW)

INSTALL 2" THICK

INSULATION BOARD

0+30 TO 2+00

(SEE DETAIL 2/D-3)

ENCASE 16 LF

SEWERLINE

NEW SEWERLINE (TYP)

-1.0%

STA: 0+30.0

IE: 6468.88

CONNECT TO EXIST 4" ACP

SERVICE, INSTALL 90°

BEND AND CLEANOUT

STA: 0+36.3±

IE (E): 6467.9±

EXIST 1" GSP WATER

(VERIFY LOCATION)

STA: 0+80.0

IE (W,N) - 4" IN: 6467.21

IE (S) - 6" OUT: 6467.04

INSTALL MANHOLE #4

STA: 2+04.3

IE (N,E) - 6" IN: 6465.84

IE (S) - 6" OUT: 6465.80

INSTALL MANHOLE #5

STA: 2+09.3

IE (IN): 6465.75

IE (OUT): 6465.58

INSTALL 2500 GAL

SEPTIC TANK

STA: 2+28.6

INSTALL 4" 45° BEND

STA: 2+31.1

IE (IN): 6465.53

IE (OUT): 6465.45

INSTALL DIST. BOX

STA: 2+38.1

IE (IN): 6465.40

BED: 6464.4

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

W

W

W

W

W

X

X

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

G

G

G

T

T

T

T

W

W

T

T

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

P

P

P

P

P

P

P

P

G

U

Y

G

U

Y

P

R

O

P

T

A

N

K

S

S

S

S

S

S

S

S

S

S

S

S

S

S

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/6 /21

:3

4 K

CA

RN

ES

C :\U

SE

RS

\K

CA

RN

ES

\D

OC

UM

EN

TS

\R

4 P

RO

JE

CT

S\

HU

MB

OL

DT

-T

OI

YA

BE

\B

RI

DG

EP

OR

T.

SE

W

ER

.20

\D

RA

W

IN

GS

\W

W 1-

W W

9.B

RI

DG

EP

OR

TS

EW

ER

_W

AS

TE

W

AT

ER

.D W

G;

R4

INTERMOUNTAIN REGION

BRIDGEPORT

SEWER SYSTEM

REPLACEMENT

PROJECT

HUMBOLDT-TOIYABE

NATIONAL FOREST

BRIDGEPORT DISTRICT

SEWER MAIN LINE B

AND SERVICE LINE C

PLAN AND PROFILE

09/29/2020

K CARNES

K CARNES

D JEPPSEN

WW-5

8/6/21FIELD SIZE

11 22

STUB OUT 4" PVC SEWER 5' AT 2%

(FOR FUTURE WATER

TREATMENT CONNECTION)

BUNKHOUSE 1 LATERAL AND SEWER MAIN - LINE "B"

VERTICAL SCALE: 1" = 8'

HORIZONTAL SCALE: 1" = 40'

HOUSE A SEWER LATERAL - LINE "C"

VERTICAL SCALE: 1" = 8'

HORIZONTAL SCALE: 1" = 40'

P

V

O

U

L

A

T

E

R

I

R

R

A

C

K

A

T

E

R

CONNECT TO EXIST 4" SEWER

SERVICE AND CLEANOUT

STA. "C" 1+88.9

INSTALL MANHOLE #4

STA. "B 0+80.0

CONNECT TO EXIST 4"

SEWER SERVICE,

INSTALL 90° BEND

AND CLEANOUT

STA. "B" 0+30.0

INSTALL 4" PVC WITH 45° BEND

TO DISTRIBUTION BOX

STA. "B" 2+28.6

BARRACKS 1

HOUSE A

INSTALL 45° BEND,

CLEANOUT, AND 6X4

ECCENTRIC REDUCER

STA. "C" 1+20.0

O

U

T

E

R

W

M

INSTALL 2500 GAL

SEPTIC TANK

STA. "B" 2+09.3

INSTALL ABSORPTION FIELD #2

STA. "B" 2+38.1 TO 2+94.1

(SEE SHEET D-2)

BACKUP FIELD LOCATION

(DO NOT DISTURB OR COMPACT)

ENCASE SEWER FROM CLEANOUT

TO 10' BEYOND WATER LINE

X

A

W

E

R

H

D

T

E

R

W

E

R

INSTALL MANHOLE #5

STA. "B" 2+04.3

STA. "C" 0+20.0

DIRECTOR OF ENGINEERING

DATE

APPROVED:

AutoCAD SHX Text T

AutoCAD SHX Text W

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text

TP

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text 20'

AutoCAD SHX Text 40'

AutoCAD SHX Text 20'

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

S

S

S

S

S

W

W

W

W

W

W

W

W

W

S

S

S

S

S

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

P

P

P

P

P

P

G

U

Y

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

W

E

E

E

E

E

E

E

E

E

E

E

5+00 5+00

0+00 1+00 2+00 3+00 4+00 5+005+00

EXISTING GRADE

2" DR-11 HDPE PRESSURE SEWER

4" PVC

EFFLUENT

LINES

ABSORPTION FIELD

(SEE SHEET D-2

FOR DETAIL VIEW)

-1.0%

-1.0%

STA: 2+13.6

IE: 6466.30

INSTALL 45° BEND

STA: 2+40.0

IE: 6466.03

GRADE BREAK

APPROX. RIM: 6471.597

STA: 0+98.0

IE (IN): 6468.00

BED: 6467.00

STA: 1+18.0

IE: 6467.26 ±

GRADE BREAK

BEGIN 48" MIN DEPTH

STA: 1+08.0

IE: 6468.34

INSTALL 45° BEND

STA: 1+07.0

INSTALL 2" HDPE X

4" PVC ADAPTOR

STA: 1+04.5

IE (IN): 6468.22

IE(OUT): 6468.10

INSTALL 30"

IF A BAFFLE IS NOT PROVIDED INSIDE

DISTR. BOX, INSTALL 4" TEE CROSSWISE

ON END OF 4" INLET INSIDE BOX

STA: 3+60.0

IE: 6453.74

GRADE BREAK

STA: 3+93.7

IE: 6451.79

INSTALL 45° BEND

STA: 4+74.9

IE: 6450.20

INST. 45° BEND

STA: 4+76.6

IE: 6450.18

INST. 2" TEE

STA: 4+10.0

IE: 6450.85

GRADE BREAK

STA: 4+25.7±

ELEV: 6452.0±

EXIST 1" WATER LINE

(VERIFY LOCATION)

STA: 4+74.2±

ELEV: 6451.3±

EXIST 6" SEWER MAIN

(VERIFY LOCATION)

STA: 3+63.8±

ELEV: 6456.5±

NEW ELEC CONDUIT

STA: 3+11.6±

ELEV: 6462.2±

EXIST ELEC CONDUIT

(VERIFY LOCATION)

STA: 4+81.4

IE (OUT): 6450.17

APPROX. RIM: 6454.5

PUMP BASIN TANK - SEE

SHEET D-1 FOR DETAILS

NEW PRESSURE

SEWERLINE (TYP)

ENCASE 20 LF

SEWERLINE

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/6 /21

:3

4 K

CA

RN

ES

C :\U

SE

RS

\K

CA

RN

ES

\D

OC

UM

EN

TS

\R

4 P

RO

JE

CT

S\

HU

MB

OL

DT

-T

OI

YA

BE

\B

RI

DG

EP

OR

T.

SE

W

ER

.20

\D

RA

W

IN

GS

\W

W 1-

W W

9.B

RI

DG

EP

OR

TS

EW

ER

_W

AS

TE

W

AT

ER

.D W

G;

R4

INTERMOUNTAIN REGION

BRIDGEPORT

SEWER SYSTEM

REPLACEMENT

PROJECT

HUMBOLDT-TOIYABE

NATIONAL FOREST

BRIDGEPORT DISTRICT

SEWER PRESSURE MAIN

LINE P

PLAN AND PROFILE

09/29/2020

K CARNES

K CARNES

D JEPPSEN

WW-9

8/6/21FIELD SIZE, STATION FIX

15 22

SEWER MAIN - LINE "A" - STA. 0+00 TO 5+00

VERTICAL SCALE: 1" = 8'

HORIZONTAL SCALE: 1" = 40'

INSTALL DISTRIBUTION BOX

STA. "P"1+04.5

INSTALL ABSORPTION FIELD #2

STA. "P" 0+02.0 TO 0+98

(SEE SHEET D-2)

HOUSE C

INSTALL 60" Ø MANHOLE

FOR PUMP BASIN

STA. "P" 4+81.4

STA. "A" 8+51.0

E

S

S

U

W

E

S

S

U

W

I

N

SEWER MAIN- LINE "A"

SEE SHEET WW-4

A

W

E R

T

E

R

E

S

S

U

W

E

R

INSTALL BEND

STA. "P" 2+13.6

INSTALL BEND

STA. "P" 3+93.7

SEE SHEET C-1 FOR DEMOLITION INFORMATION.

SEE SHEET C-3 FOR WATER, ELECTRICAL, AND

ROADWAY CONSTRUCTION.

BACKUP FIELD LOCATION

(DO NOT DISTURB OR COMPACT)

ENCASE SEWER 10'

EACH SIDE OF WATER

LINE (2 LOCATIONS)

INSTALL 2" SEWER VALVES ON

THE WEST AND SOUTH LEGS

OF TEE AT STA 4+76.6

SEE DETAIL 1/D-6

DIRECTOR OF ENGINEERING

DATE

APPROVED:

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text 20'

AutoCAD SHX Text 40'

AutoCAD SHX Text 20'

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

ABSORPTION FIELD LAYOUTS

LEACHING CHAMBER

SIDE VIEW

LEACHING CHAMBER

END VIEW

SEPTIC TANK (FOR SYSTEM #2)

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/9 /21

:0

7 K

CA

RN

ES

C :\U

SE

RS

\K

CA

RN

ES

\D

OC

UM

EN

TS

\R

4 P

RO

JE

CT

S\

HU

MB

OL

DT

-T

OI

YA

BE

\B

RI

DG

EP

OR

T.

SE

W

ER

.20

\D

RA

W

IN

GS

\D

2.B

RI

DG

EP

OR

TS

EW

ER

.L

EA

CH

FI

EL

D.

DW

G;

R4

INTERMOUNTAIN REGION

BRIDGEPORT

SEWER SYSTEM

REPLACEMENT

PROJECT

HUMBOLDT-TOIYABE

NATIONAL FOREST

BRIDGEPORT DISTRICT

CHAMBER SYSTEM

ABSORPTION FIELDS

AND SEPTIC SYSTEM #2

TANK

09/29/2020

K CARNES

K CARNES

D JEPPSEN

D-2

8/7/21FIELD SIZE, TRENCH SIDEWALL

17 22

DIRECTOR OF ENGINEERING

DATE

APPROVED:

AutoCAD SHX Text

GROUND LINE

AutoCAD SHX Text

GROUND LINE

AutoCAD SHX Text LEACHING CHAMBER NOTES: 1. EXCAVATE AND RAKE LEVEL 3' WIDE TRENCHES. EXCAVATE AND RAKE LEVEL 3' WIDE TRENCHES. TRENCHES SHALL BE 6' APART AND SEPARATED BY UNDISTURBED SOIL. 2. GRAVELLESS CHAMBERS SHALL BE 34"W x 53"L x GRAVELLESS CHAMBERS SHALL BE 34"W x 53"L x 12"H (48" EFFECTIVE LENGTH) QUICK-4 HIGH-CAPACITY CHAMBERS AS MANUFACTURED BY INFILTRATOR SYSTEMS, INC. OR AN APPROVED EQUAL. INSTALL CHAMBERS ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. 3. INSTALL INSPECTION PORT IN PRE-MARKED HOLE INSTALL INSPECTION PORT IN PRE-MARKED HOLE BETWEEN THE LAST TWO "RIBS" OF THE INFILTRATOR AT THE DOWNSTREAM END OF EACH TRENCH. 4. THE ABSORPTION FIELD SHALL BE CONSTRUCTED THE ABSORPTION FIELD SHALL BE CONSTRUCTED WHERE STAKED BY THE CONTRACTING OFFICER. 5. DRILL HOLE IN PIPE TO RECEIVE ONE 18" #4 REBAR. DRILL HOLE IN PIPE TO RECEIVE ONE 18" #4 REBAR. CENTER REBAR HORIZONTALLY IN HOLE.

AutoCAD SHX Text

OUTLET TO ABSORPTION FIELD

AutoCAD SHX Text

6" PVC SEWERLINE

AutoCAD SHX Text

INLET

AutoCAD SHX Text

6" PVC SEWERLINE

AutoCAD SHX Text

FROM LIFT STA.

AutoCAD SHX Text DRAINFIELD NOTES: 1. DISTRIBUTION BOX OUTLETS SHALL BE AT THE SAME OR HIGHER ELEVATION THAN THE HIGHEST TRENCH. DISTRIBUTION BOX OUTLETS SHALL BE AT THE SAME OR HIGHER ELEVATION THAN THE HIGHEST TRENCH. 2. THE DISTRIBUTION BOXES SHALL THE FOLLOWING MODELS AS MANUFACTURED BY JENSEN PRECAST OF THE DISTRIBUTION BOXES SHALL THE FOLLOWING MODELS AS MANUFACTURED BY JENSEN PRECAST OF SPARKS, NV, 1-800-382-7009, OR APPROVED EQUALS: FIELD #1: MODEL D-30 BOX W/ GRADE RINGS AS NEEDED AND GASKETED CAST IRON RING AND COVER. INSTALL HORIZONTAL TEE ON INLET PIPE AS A BAFFLE (NOT REQUIRED IF A BAFFLE WALL IS INCORPORATED INTO THE BOX CASTING.) FIELD #2: MODEL D6B. 3. SEWER LINES BETWEEN THE DISTRIBUTION BOX AND CHAMBER TRENCHES MAY BE INSTALLED IN THE SAME SEWER LINES BETWEEN THE DISTRIBUTION BOX AND CHAMBER TRENCHES MAY BE INSTALLED IN THE SAME TRENCH. 8" MINIMUM HORIZONTAL SEPARATION IS REQUIRED.

AutoCAD SHX Text SEPTIC TANK NOTES: 1. THE SEPTIC TANK SHALL BE WATERTIGHT THE SEPTIC TANK SHALL BE WATERTIGHT REINFORCED CONCRETE WITH A MINIMUM LIQUID CAPACITY OF 2500 GALLONS. JENSEN JZ-2500 OR APPROVED EQUAL. 2. SEPTIC TANK SHALL BE DESIGNED FOR H-20 SEPTIC TANK SHALL BE DESIGNED FOR H-20 TRAFFIC LOAD WITH SOIL COVER OF 1' TO 5'. 3. TANK CONSTRUCTION AND INSTALLATION SHALL BE TANK CONSTRUCTION AND INSTALLATION SHALL BE IN COMPLIANCE WITH THE CALIFORNIA PLUMBING CODE, APPENDIX H: PRIVATE SEWAGE DISPOSAL SYSTEMS.

AutoCAD SHX Text

GROUND LINE

AutoCAD SHX Text

RUN 4" PVC THROUGH INLET OPENING IN END PLATE BUT NOT BEYOND SPLASH PLATE.

AutoCAD SHX Text 18" x 18" x 4" CONCRETE SPLASH PLATE OR USE SPLASH PLATE AS SUPPLIED BY MANUFACTURER.

AutoCAD SHX Text

4" PVC FROM DISTRIBUTION BOX.

AutoCAD SHX Text

-2% MIN. SLOPE

AutoCAD SHX Text

END PLATES AS SUPPLIED BY MANUFACTURER. (BOTH ENDS)

AutoCAD SHX Text

0% LEVEL TRENCH BOTTOM

AutoCAD SHX Text

INSPECTION PORT (4" ABS)

AutoCAD SHX Text

PERFORATE PIPE BELOW COUPLING WITH 1/2" DIA. HOLES.

AutoCAD SHX Text

INSPECTION PORT ANCHOR SEE NOTE 5.

AutoCAD SHX Text

INSTALL 4" ABS COUPLING SO COUPLING SITS ON TOP OF CHAMBER.

AutoCAD SHX Text

MOUND BACKFILL OVER TRENCH

AutoCAD SHX Text

NATIVE SOIL BACKFILL (COMPACT BY FOOT)

AutoCAD SHX Text 24" MIN. DIA. CONCRETE RISER COLLAR AND LOCKABLE CAST IRON GASKETED LID (TYP. OF 2)

AutoCAD SHX Text

FLOW

AutoCAD SHX Text

FLOW

AutoCAD SHX Text

30" DISTRIBUTIONBOX, 10 HOLE MIN.

AutoCAD SHX Text

TRENCH (TYP.)

AutoCAD SHX Text

BAFFLE

AutoCAD SHX Text

ABS THREADED CAP (CLEANOUT TYPE)

AutoCAD SHX Text

TOP OF BOX 2" ABOVE GRADE - SLOPE BACKFILL TO DRAIN AWAY FROM BOX

AutoCAD SHX Text "CHRISTY G6" CONCRETE VALVE BOX (OR EQUAL) W/ LOCKING LID MARKED "SEWER" (SEE SPECIFICATION)

AutoCAD SHX Text

SEE SHEET D-1 FOR SYSTEM #1 TANKS

AutoCAD SHX Text PRIMARY TANK COMPARTMENT IS TO HAVE A MINIMUM VOLUME OF 23THE TOTAL TANK CAPACITY

AutoCAD SHX Text

SENCONDARY TANK COMPARTMENT IS TO HAVE A MINIMUM VOLUME OF 500 GAL.

AutoCAD SHX Text

6 HOLE MIN DIST. BOX

AutoCAD SHX Text

FROM SEPTIC TANK

AutoCAD SHX Text

ABSORPTION FIELD #1

AutoCAD SHX Text

ABSORPTION FIELD #2

AutoCAD SHX Text ABSORPTION FIELD #2 IS DESIGNED FOR THE FOLLOWING: * PERCOLATION RATE OF 25 MINUTES PER INCH. * SOIL LOADING RATE OF 2.5 GPD/SF. * 1600 GALLONS PER DAY. * TANK SIZE OF 2325 GALLONS (USE 2500 GAL) * LEACH AREA/100 GAL TANK CAP. = 40 SF * AREA FACTOR FOR CHAMBER SYSTEM = 0.7 * TOTAL LEACH AREA = 672 SF

AutoCAD SHX Text ABSORPTION FIELD #1 IS DESIGNED FOR THE FOLLOWING: * PERCOLATION RATE OF 25 MINUTES PER INCH. * SOIL LOADING RATE OF 2.5 GPD/SF. * 4100 GALLONS PER DAY. * TANK SIZE OF 4500 GALLONS * LEACH AREA/100 GAL TANK CAP. = 40 SF * AREA FACTOR FOR CHAMBER SYSTEM = 0.7 * TOTAL LEACH AREA = 1380 SF

AutoCAD SHX Text

ABSORPTION FIELD DESIGN PARAMETERS

AutoCAD SHX Text

HORIZONTAL BAFFLE TEE

AutoCAD SHX Text

UNDISTURBED SOIL BETWEEN TRENCHES

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Sheets and Views
G3
Rev1-D2.pdf
Sheets and Views
Layout1
Rev1-S1.pdf
Sheets and Views
S-2
Rev1-S4.pdf
Sheets and Views
S-4
Rev1-WW1.pdf
Sheets and Views
WW-1-Index
Rev1-WW2.pdf
Sheets and Views
WW-2-Index
Rev1-WW5.pdf
Sheets and Views
WW-5-BC
Rev1-WW9.pdf
Sheets and Views
WW-9-P

File details come from the government source that posted it. Updated .