Amendment 3.pdf

PDF 155 KB Posted

Attached to
Bridgeport Sewer Replacement Federal contract opportunity
Solicitation number
1240LR21R0007
Issued by
Department of Agriculture Forest Service

About this file

This document contains an amendment to a federal solicitation for the Bridgeport Sewer Replacement project. The project involves reconstructing the entire wastewater system at a Forest Service administrative site located approximately 4 miles west of Bridgeport, California. Work includes installing new sewer lines, cleanouts, manholes, and RV sewer connections; new septic tanks and absorption fields; a new packaged effluent lift station; and aggregate access roads. It also involves removing an existing packaged sewage treatment system, steel building, and existing sewer system components. The estimated price is between $250,000 and $500,000. The amendment clarifies that the drawings correctly show a 3,000 gallon primary tank and 4,000 gallon secondary tank rather than the tanks listed in the original bid item schedule. It updates the schedule to reflect a 4,000 gallon septic tank for item 221300-7.

View the file

Other files for this federal contract opportunity

Other files attached to Bridgeport Sewer Replacement, newest first.
File Type Posted
BridgeportSewer.SOI_082021.xlsx XLSX spreadsheet
Copy of BridgeportSewer.SOI_082021.xlsx XLSX spreadsheet
BridgeportSewer.SOI.Rev1-08.09.2021.xlsx XLSX spreadsheet
Amendment 2.pdf PDF
BridgeportSewer-2019_Plans_Rev1_08.09.2021.pdf PDF
Amendment 1.pdf PDF
RFIBridgeportSewer072621.pdf PDF
ProfilePercs.pdf PDF
ATTACH 4_WAGE DETERMINATION.pdf PDF
1240LR21R0007.pdf PDF
ATTACH 1_BridgeportSewer_Specs_Final_09.23.2020.pdf PDF
ATTACH 2_BridgeportSewer-2019_Plans_Signed_10.14.2020.pdf PDF
Attach_5_Determination of Responsibility.pdf PDF
ATTACH 3_EngineeringReport_BridgeportSewer_09.24.2020.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1240LR21R0007

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40LR

OGDEN UT 84401-2310

324 25TH ST

USDA-FS CSA INTERMOUNTAIN 6

07/12/20210003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/12/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Purpose Of Amendment:

1. Updated Schedule of Items, ONLY Changes is on line item 221300-Septic Tank-4000 Gal, from 1500 gallons as depicted in the drawings.

2. Questions and Answers

Period of Performance: 04/01/2022 to 07/30/2022

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

TANYA SPANFELLNER

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Your attention is directed to section 014100 -3.6. Table 04100-1 list the testing requirements.

Will items ; Concrete – Slump, Air, Temperature, Concrete - Compression Test, HDPE Pipe - Bent Strap Test be required ? Yes these tests are required.

Your attention is directed to section 014100 -3.6. Table 04100-1 list the testing requirements. Is soils testing required by the contractor or the USDA Forest Service. The tests noted in Table 04100-1 shall be done by the contractor.

Your attention is directed to section 024100 -3.1C.

All waste material above shall be hauled to the disposal area on Government property as designated by the Contracting Officer . Please provide location of disposal area. Assume there will not be a great amount of unsuitable material that is generated with the excavation. This would be what is typically found in excavation of a residential are. The exact site shall be determined when and if this need arises and will be on the compound or across the street at the warehouse.

Sheet G-1 of the drawings list the bid item schedule and quantities. There are lists 3 septic tanks.

1- 1,500 gallon, 1- 2,500 gallon, and 1- 3,000 gallon; however, sheet D-1 shows a 3,000 gallon primary tank and a 4,000 gallon secondary tank. Please clarify the volumes and number of tanks.

The drawings are correct. We have a 2500 tank at field 2, The others are 3000 and 4000 gallon at the lift station. There is no 1500 gallon tank. Change the Schedule of Item number 221300-7 to Septic Tank - 4000 gallon, Concrete

File details come from the government source that posted it. Updated .