This is Amendment 001 to a Forest Service stewardship solicitation for the Corral G-Z project located in the Fremont-Winema National Forest, Bly Ranger District. The amendment modifies solicitation 12363N26Q4181, issued by the USDA-FS Stewardship Contracting Branch (code 363N) on September 30, 2026, with an effective date of October 6, 2026.
The amendment makes three key changes: (1) reschedules the mandatory site visit/pre-proposal conference from Thursday, October 22, 2026 to Thursday, October 29, 2026, with a 10:00 AM PT meeting time at a specified location off Highway 140 near the Bly Ranger Station; (2) updates the deadline for vendors to notify attendance via email to will.potter@usda.gov from Monday, October 19th to Monday, October 26th, 2026 at 4:00 PM PT; and (3) adds Project Area spatial data to the solicitation package. The underlying solicitation involves stewardship contracting activities authorized under Section 8205 of Public Law 113-79 and includes land management activities with a period of performance from date of award through October 30, 2031. Payment for land management work will be made through Stewardship Credits and Appropriated Funds, with evaluation of price proposals based on timber removal price schedules and bid premiums. Offerors must acknowledge receipt of this amendment prior to the specified hour and date by completing and returning the amendment, acknowledging receipt on offer copies, or submitting separate written or electronic communication referencing the solicitation and amendment numbers.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12363N26Q4181 x x x
363N
WASHINGTON DC 20250-1138
MS-1138
1400 INDEPENDENCE AVE SW
USDA-FS STEWARDSHIP CONTRACTING BR
10/06/20260001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning _1___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/30/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Corral G-Z Stewardship IRSC
Fremont-Winema National Forest
Bly Ranger District
Amendment 001:
Changes Site Visit date from Thursday, October 22, 2026 to Thursday, October 29, 2026.
Revises Pages 9 and 48 to reflect the update. see attached amended pages.
Adds Project Area spatial data.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
MARK T. PHILLIPP
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
USDA-FS STEWARDSHIP CONTRACTING BR
1400 INDEPENDENCE AVE SW
MS-1138
WASHINGTON DC 20250-1138
363N
Corral G-Z Stewardship IRSC Fremont-Winema National Forest Solicitation 12363N26Q4181 Bly Ranger District full on top of the Contract Timber Value. If appraised timber rate is greater than $9.29/ton Bid Premiums shall not apply. Appraised Timber Rates below $0.91/ton, potentially indicating deficit conditions, will either prompt reassessment of treatment units (move uneconomical unit acres from Timber Removal Item to Service treatment) to bring appraised Rates above $0.91 or Bid Premiums will be waived.
Bid Premium greater than $0.00/ton is not required to be considered for award; however, bid premiums will be evaluated to determine Best Value to the government. Bid Premiums increase the Contract Total Timber Value, which may allow for additional service work to be completed.
For evaluation of price proposals, FS will calculate the Total Value of all products based on the assumptions shown in the Grizzly Project Area Timber Removal Price Schedule and the Total Value Bid Premium quote.
A site visit is scheduled for Thursday, October 22nd October 29th, 2026, to view the project area and discuss the objectives of this contract. See Section 63. SITE VISIT/PREPROPOSAL CONFERENCE for meeting site location, and Site Visit Map posted to SAM.gov solicitation post.
PERIOD OF PERFORMANCE IS FROM DATE OF AWARD THROUGH 10/30/2031
LAND MANAGEMENT ACTIVITIES.
The Forest Service is executing this procurement under the stewardship contracting authority provided under Section 8205 of Public Law 113-79, the Agricultural Act of 2014 as amended under Section 204 & 207 of the Consolidated Appropriations Act (Omnibus Bill 2018). Stewardship authority grants the Forest Service Chief or designee the authority to aggregate contractual requirements into stewardship projects and solicit those requirements utilizing full and open competition
Performance of land management activities shall be in accordance with Project Description and Work Specifications. Payment for Land Management Work Activities in Schedule of Items will be made in Stewardship Credits and Appropriated Funds.
All Base Work Activities (Mandatory) shall be performed. Optional activities are listed in order of planned priority.
Award may be made for optional items in any order that the Contracting Officer determines is in the best interest of the Government.
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (DEVIATION NOV 2025)
a) Definitions. The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.
(b) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
Amendment 001
Corral G-Z Stewardship IRSC Fremont-Winema National Forest Solicitation 12363N26Q4181 Bly Ranger District
SITE VISIT/PREPROPOSAL CONFERENCE
(a) The Government is planning a site visit/pre-proposal conference, during which potential quoters may obtain a better understanding of the work required.
(b) Quoters are encouraged to submit all questions in writing at least five (5) days prior to the conference.
Questions will be considered at any time prior to or during the conference; however, quoters may be asked to confirm verbal questions in writing. Subsequent to the conference, an amendment to the solicitation containing an abstract of the questions and answers and a list of attendees, will be disseminated.
(c) In order to facilitate site visit preparations, interested vendors shall email will.potter@usda.gov regarding the number of persons who will attend no later than 4:00 PM PT on Monday, October 19th October 26th, 2026.
(d) The Government assumes no responsibility for any expense incurred by a quoter prior to contract award.
(e) Quoters are cautioned that, notwithstanding any remarks or clarifications given at the conference, all terms and conditions of the solicitation remain unchanged unless they are changed by amendment to the solicitation. If the answers to conference questions, or any solicitation amendment, create ambiguities, it is the responsibility of the quoter to seek clarification prior to submitting a quote.
(f) The Site Visit will be held:
Date: Thursday, 10/22/2026 10/29/2026 Time: Meet up time of 10:00 AM PT Location: To reach the meeting location, leave the Bly Ranger Station and drive roughly 13 miles southeast on Highway 140 until reaching the 3660 road. Turn left and drive roughly 10 miles northeast and then north on the 3660 until arriving at the destination. See Corral Site Visit Map for meeting location.
FAR 52.237-1 SITE VISIT (APR 1984)
Quoters or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Amendment 001
| C05_A001_12363N26Q4181Corral G-Z IRSC Solicitation_pgs9+48.pdf |
| General Information |
| The associated North American Industrial Classification System (NAICS) code for this procurement is 113310 –Logging, with a small business size standard of 500 Employees. The product service code is F014. The government will award a firm-fixed price (... |
| SCHEDULE OF ITEMS |
| MANDATORY WORK ACTIVITIES: |
| OPTIONAL WORK ACTIVITIES: |
| TIMBER/PRODUCT REMOVAL PRICE SCHEDULE: Corral Mandatory Project Area: |
| TIMBER/PRODUCT REMOVAL PRICE SCHEDULE: Grizzly Optional Project Area |
| TIMBER SUBJECT TO AGREEMENT PRICE SCHEDULE: |
| SCHEDULE NOTES |
| Land Management Activities. |
| FAR 52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (Deviation NOV 2025) |
| FAR 52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025) |
| Scope of Contract |
| Administrative Changes |
| Specifications |
| Contractor Quality Control Inspection System |
| Acceptance |
| Government Quality Assurance Surveillance Plan |
| Commencement, Prosecution, and Completion of Work |
| PERIOD OF PERFORMANCE |
| CONTRACT OPERATIONS SCHEDULE |
| SCHEDULES AND REPORTS |
| SUBMITTAL DUE |
| ITEM DESCRIPTION |
| Physical Data |
| Data Rights |
| Release of Information |
| The contracting officer shall submit the contractor’s request for press release to the office of communications for approval. The contractor shall not release any information to the public without official OC approval from the contracting officer. |
| Return of Data |
| Geospatial Data |
| Stewardship Credits |
| Establishment of Stewardship Credits |
| Payment |
| Timber Payment Guarantee |
| Excess Stewardship Credits |
| Excess Timber Value |
| Refund of Excess Cash |
| FOREST PRODUCT APPRAISAL METHODOLGY |
| Timber Product Volume Estimation |
| Final Payment - Release of Claims |
| Post Award Conference |
| Use of premises |
| Key Personnel |
| Key Personnel- Representatives: |
| Employment Of Eligible Workers |
| PROTECTION MEASURES NEEDED FOR PLANTS, ANIMALS, CULTURAL RESOURCES, AND CAVE RESOURCES |
| EROSION PREVENTION AND CONTROL |
| PROTECTION OF LAND SURVEY MONUMENTS |
| PROTECTION OF IMPROVEMENTS |
| PROTECTION OF PROPERTY |
| PROTECTION OF RESIDUAL TREES |
| SANITATION AND SERVICING |
| PREVENTION OF OIL SPILLS AND HAZARDOUS SUBSTANCES |
| EQUIPMENT CLEANING/NOXIOUS WEED CONTROL |
| MEADOW PROTECTION |
| WETLANDS PROTECTION |
| STREAMCOURSE PROTECTION |
| REQUIREMENTS OF RIGHTS-OF-WAY |
| ROAD MAINTENANCE |
| USE BY OTHERS |
| INCIDENTAL PAYMENT ITEMS |
| SAFETY |
| CONTRACTOR PERFORMANCE SYSTEM REGISTRATION |
| INVOICE PROCESSING PLATFORM (IPP) |
| AGAR 452.236-70 Emergency Response, Fire Suppression, and Liability. |
| 49.1 FIRE PRECAUTIONS AND CONTROL |
| OPTIONAL LINE ITEMS |
| OPTION FOR INCREASED QUANTITIY |
| FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) |
| STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014), the following information is provided In accordance with FAR 52.222-42: |
| AGAR 452.203-71 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Compliance (Dec 2025) |
| AGAR 452.203-72 Unenforceable Supplier Terms (APR 2026) |
| AGAR 452.204–70 Modification for Contract Closeout (Apr 2026) |
| LIST OF ATTACHMENTS |
| Site Visit/Preproposal Conference |
| FAR 52.237-1 Site Visit (Apr 1984) |
| FAR 52.212-2 Evaluation – Commercial Products and Commercial Services (NOV 2025) |
| The Government will use an on-the-spot consensus method to determine the best value, consistent with the stated factor order of importance and rating definitions. |
| 1. Evaluators shall independently review proposals and record notes, strengths, weaknesses, significant benefits, and risks for each factor and subfactor. |
| 2. Convene a facilitated consensus session to determine final ratings per factor; identify the material discriminators; and document a trade-off rationale where applicable. |
| 3. Document the consensus with a concise narrative that links the final ratings to evidence in the proposal and explains any tradeoffs between technical merit and price. |
| Proposals will be evaluated on the basis that the following technical factors are in descending order of importance whereby each factor is more important than the next: |
| Technical Approach |
| Relevant Past Performance |
| Benefit to the Local Community |
| Evaluation factors other than price when combined are approximately equal to cost or price. |
| Final ratings are determined by group consensus, not by averaging individual scores. The consensus record will include: (a) factor ratings, (b) key strengths/weaknesses, and (c) risks and uncertainties. After consensus on non-price factors has been de... |
| Non-Price Criteria. The technical proposals will be evaluated and ranked according to the following criteria. |
| Factor 1: Technical Approach |
| How well does the Quality Control Plan ensure that end results will be met, monitored, and documented for each Work Item? How effectively does the QC plan verify that deliverables meet required standards before submission of Items 3–8. |
| How well does Quality Control monitoring ensure that end results will be met, monitored, and documented for Optional Item 22. How efficient and effective do the methods proposed deliver usable deliverables for minimizing government Quality Assurance... |
| Individual elements of Technical Approach Ratings will be evaluated as follows. The aggregate of element |
| ratings will be weighed equally to determine the final rating for Technical Approach: |
| A. Outstanding: Proposal demonstrates a clear and logical plan with no identified risks to achieve the required end results, highly qualified key personnel are identified for all required positions, little to no scheduled work/contractual conflicts and re... |
| B. Satisfactory: Proposal demonstrates a clear plan with acceptable risks to achieve the required end results, qualified key personnel are identified for all required positions, some scheduled work/contractual conflicts that are determined acceptable and... |
| C. Marginal: Proposal demonstrates a plan with increased risks to achieve the required end results, key personnel are identified for some, but not all required positions, existing work/contractual obligations are determined an increased risk and no pla... |
| D. Unacceptable: Proposal fails to demonstrate an understanding for any of the technical requirements in the solicitation. |
| Factor 2: Relevant Past Performance |
| A. Outstanding: Quoter has a history of delivering services of high quality. High quality is considered in terms of great customer satisfaction, no instances of rework and/or deficiency reports, and no late deliveries. There is no risk anticipated with... |
| B. Satisfactory: Quoter has a history of delivering services of satisfactory quality. Satisfactory quality is considered in terms of moderate customer satisfaction, no too few instances of rework and/or deficiency reports, and no too few late deliverie... |
| C. Marginal: The quoter’s past performance history demonstrates for the most part the company’s ability to satisfy customer needs and contract requirements. There may be some minor instances of customer complaint, but no indication that corporate prac... |
| D. Unacceptable: The quoter’s past performance information clearly demonstrates a failure to meet past contract requirements and/or understand customer needs. Past contract performance has been deficient. It is a reasonable conclusion that the quoter’s... |
| E. Neutral: There is no relevant past performance available for evaluation. The quoter will neither be evaluated favorably nor unfavorably. Therefore, quoters will neither receive nor lose credit for no relevant past performance. |
| Factor 3: Benefit to the Local Community |
| A. Outstanding: The proposal demonstrates an exceptional approach with a clear, credible plan to utilize local labor, subcontractors, and local businesses within 60 miles of Bly, Oregon. Strong, detailed commitments to hire, train, and retain local re... |
| B. Satisfactory: The proposal meets requirements and demonstrates a reasonable and achievable plan to utilize local labor, subcontractors, and local businesses located within 100 miles of Bly, Oregon. Adequate commitments to local hiring or training. ... |
| C. Marginal: The proposal partially meets requirements with limited use of resources located within 100 miles of Bly, Oregon. Minimal or vague commitments to local hiring or training. Limited or poorly defined use of local subcontractors or vendors. In... |
| D. Unacceptable: The proposal fails to meet requirements with no demonstrated utilization of local labor, subcontractors, businesses, or local procurement. No meaningful commitments to hire or train local residents. No plans to subcontract with or pur... |
| FAR 52.212-1 Instructions to Quoters—Commercial Products and Commercial Services (NOV 2025) |
| Factor 1. Technical Approach |
| Work Activity Plan. Clearly describe how you and/or your subcontractors will meet both the project objectives and minimize resource damage. Include an explanation about how you have determined this approach, and what coordination will occur between ... |
| Method. Describe the method or combination of methods you plan to utilize to accomplish the Mandatory Work Activities/Items and any of the Optional Work Activities/ Items that you anticipate necessary, dependent on your operations. Include response... |
| Equipment. Describe the equipment you will use to accomplish both the timber harvest and stewardship service items. Include make and model of proposed equipment. |
| Key Personnel. List the names and proposed duties of key personnel who will be assigned to the various work items of the project including the overall Project Manager, Forester experienced in timber cruising and treatment unit layout, Logging Superv... |
| Timing. Provide a general plan for the sequence of work, including an estimated start date and completion date for both the Mandatory and Optional Work Activities/Items. |
| Availability. List all contracts and/or work commitments that may conflict with starting work immediately and/or completion of this work on time. Include acres left to complete, time estimated to complete, contractor resources allocated to those proj... |
| Factor 2. Relevant Past Performance |
| Factor 3. Benefit to Local Community |
| Factor 4. Cost/Price Quote |
| FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998) |
| AGAR 452.203-71 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Compliance (May 2026) |
| Notice For Filing Agency Protests |
| 69. EMPLOYMENT OF ELIGIBLE WORKERS- WORKFORCE CERTIFICATION |
File details come from the government source that posted it. Updated .