C05_Attachment 12 - Material Submittal Form.pdf

PDF 218 KB Posted

Attached to
Roof Replacement Federal contract opportunity
Solicitation number
1232SA26Q0942
Issued by
Department of Agriculture Agricultural Research Service

About this file

This is a Material Approval Submittal Cover Sheet form used by the USDA/ARS to document and track contractor submissions of materials for federal construction projects. The form is specifically designed for the "Roof Repair by Replacement (North and South Wings)" project at USDA-ARS-NCAUR in Peoria, Illinois.

The form serves as a multi-level approval document requiring sequential review and authorization from four parties: the Contractor, RRC/A&E (Architect/Engineer), COR/EPM (Contracting Officer Representative/Engineering Project Manager), and the Contracting Officer. For each material line item submitted (up to 10 items per submittal), the form captures the specification section, paragraph number, drawing reference, material description including type, model, and manufacturer, and approval status. Each reviewing party indicates approval (APP) or disapproval (DISAP) with space for comments on the reverse side. The template includes fields for tracking submittal numbers, previous submittal references, receipt dates from various parties, and a mandatory timeframe for resubmittal if items are disapproved. By signing the form, the contractor certifies that all submitted materials comply with contract specifications. The form is dated November 2016 and designed for use as a standard federal construction project document management tool.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MATERIAL APPROVAL SUBMITTAL

TO: USDA/ARS

CO CC: RRC/A&E,

COR

FROM: (Contractor) PROJECT TITLE: CONTRACT NUMBER:

(To be completed by the Contractor) Government Use Only

SUBMITTAL

NUMBER:

PREVIOUS SUBMITTAL NUMBER

(only if items listed were submitted previously):

RRC/A&E

Recommendation

COR/EPM

Recommendation

Contracting Officer Approval/Disapproval

Line

No.

Specification Sect.

Para No., Draw No.

Description of Material

(Include type, model, mfg) APP

See

Comments on Reverse APP DISAP

See

Comments on Reverse APP DISAP

See

Comments on

Reverse

If an item is disapproved, a resubmittal is due within ________ calendar days of the Contracting Officer’s signature below.

Contractor RRC/A&E COR/EPM Contracting Officer TYPE or PRINT NAME & TITLE TYPE or PRINT NAME & TITLE TYPE or PRINT NAME & TITLE TYPE or PRINT NAME & TITLE

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE:

By completing this form, the above signed contractor certifies that the material complies with all specifications of the subject contract.

DATE RECEIVED FROM KTR: DATE RECEIVED FROM KTR: DATE RECEIVED FROM COR:

Material Approval Submittal Cover Sheet (11/2016)

Roof Repair by Replacement (North and South Wings) USDA-ARS-NCAUR, Peoria, IL

Wayne.Myers Cross-Out

CONTRACT #: SUBMITTAL #:

COMMENTS

Instructions: Enter the initials of the individual making the comment, the Line Number of the item for which the comment is being made, and the comment.

Material Approval Submittal Cover Sheet (11/2016) (Reverse)