12-KL27-104 Interactive Scoresheet (Informational Only).xls

XLS spreadsheet 73 KB Posted

Attached to
Urinalysis Laboratory Equipment
Solicitation number
KL27-104
Issued by
Utah

About this file

This is an interactive evaluation scoresheet for RFP Solicitation KL27-104 issued by the State of Utah Division of Purchasing on behalf of the Department of Corrections for the procurement of urinalysis laboratory equipment. The RFP anticipates a single contract award to the responsive and responsible vendor achieving the highest evaluation score. Offerors must meet five mandatory requirements including submission of a site visit sign-up sheet, attendance at a mandatory site visit, adherence to all specifications in the Scope of Work (Attachment C), supply of all reagents within five days of order receipt, and achievement of testing sensitivity equal to or surpassing National Institute on Drug Abuse (NIDA) standards.

The evaluation methodology consists of two stages: Stage 1 involves initial review to eliminate non-responsive proposals failing to meet mandatory requirements, and Stage 2 involves technical evaluation by a committee scoring proposals across six criteria totaling 800 possible points—Training (150 points), Service/Maintenance (200 points), Installation (150 points), Work History (50 points), Subcontractor Compliance (150 points), and Software System (100 points). Offerors must achieve a minimum technical score threshold of 560 points to advance to final cost proposal evaluation, where cost represents 200 of the total 1,000 possible evaluation points. The cost evaluation formula awards full cost points to the lowest-priced proposal, with other offerors receiving points proportionally based on the ratio of the lowest proposed price to their proposed price.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Score Sheet

Urinalysis Laboratory Equipment
SOLICITATION # KL27-104
RFP EVALUATION SCORESHEET
Score will be assigned as follows:
0 = Fail, the proposal fails to address the requirements or criteria described in the RFP or cannot be assessed due to missing information
Firm Name:1 = Poor, the proposal inadequately addresses the requirements or criteria described in the RFP or cannot be assessed due to incomplete information
2 = Unsatisfactory, the proposal addresses the requirements or criteria described in the RFP in an unsatisfactory manner
Evaluator:3 = Satisfactory, the proposal addresses all requirements or criteria described in the RFP in a minimum satisfactory manner
4 = Good, the proposal addresses all requirements or criteria described in the RFP and in some respects exceeds them
Date:5 = Excellent, the proposal addresses and exceeds all of the requirements or criteria described in the RFP
Minimum Mandatory RequirementsRFP SectionEvaluation (Pass/Fail)
1Site Visit Sign-Up SheetAttachment E
2Offeror MUST attend mandatory site visitAttachment E
3Offeror MUST adhere to all specifications and requirements found in Attachment C - Scope of WorkAttachment E
4Offeror’s must supply all reagents listed in scope of work within five (5) days of receipt of order.Attachment E
5Testing sensitivity for all drugs must be equal to or surpass National Institute on Drug Abuse (NIDA) standardsAttachment E
0
Scoreable Technical CriteriaRFP SectionEvaluator Score (0-5)Criteria Weight% of Tech CriteriaPoints PossiblePoints

Earned

1TrainingAttachment E3018.8%150.000.00
2Service/MaintenanceAttachment E4025.0%200.000.00
3InstallationAttachment E3018.8%150.000.00
4Work HistoryAttachment E106.3%50.000.00
5Subcontractor ComplianceAttachment E3018.8%150.000.00
6Software SystemAttachment E2012.5%100.000.00
130.0%0.000.00
140.0%0.000.00
150.0%0.000.00
160.0%0.000.00
170.0%0.000.00
180.0%0.000.00
190.0%0.000.00
200.0%0.000.00
210.0%0.000.00
220.0%0.000.00
230.0%0.000.00
100.0%800.000.00
Required Technical Point ThresholdRFP SectionMin PercentMin Points RequiredPoints EarnedPercent EarnedEvaluation
Attachment E70%560.00.00.0%0
CostRFP SectionLow Cost OptionOffered CostPercent of TotalPoints PossiblePoints Earned
Attachment F200.00.0
* Purchasing will use the following cost formula: The points assigned to each offerors cost proposal will be based on the lowest proposal price. The offeror with the lowest Proposed Price will receive 100% of the price points. All other offerors will receive a portion of the total cost points based on what percentage higher their Proposed Price is than the Lowest Proposed Price. The formula to compute the points is: Cost Points x (Lowest Proposed Price/Proposed Price).
Total Evaluation PointsPercent of TotalPoints PossiblePoints Earned
Total Technical Evaluation Points0%800.00.0
Total Cost Evaluation Points0%200.00.0
Total Evaluation Points0%1,000.00.0

Scoresheet Summary

KL27-104 Urinalysis Laboratory Equipment Scoresheet Summary
Signatures:Date:
Evaluator 1__________________
Evaluator 2__________________
Evaluator 3__________________
Evaluator 4__________________
Evaluator 5__________________
Minimum Mandatory RequirementsOfferor AOfferor BOfferor COfferor DOfferor EOfferor FOfferor GOfferor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
1Site Visit Sign-Up Sheet
2Offeror MUST attend mandatory site visit
3Offeror’s must adhere to all specifications and requirements found in Attachment C - Scope of Work
4Offeror’s must supply all reagents listed in scope of work within five (5) days of receipt of order.
5Testing sensitivity for all drugs must be equal to or surpass National Institute on Drug Abuse (NIDA) standards
WeightTechnical ScoresOfferor AOfferor BOfferor COfferor DOfferor EOfferor FOfferor GOfferor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
Criteria #1 - Training
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
30.0Criteria #1 - Total Points (Total Possible Points = 150)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #2 - Service/Maintenance
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
40.0Criteria #2 - Total Points (Total Possible Points = 200)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #3 - Installation
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
30.0Criteria #3 - Total Points (Total Possible Points = 150)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #4 - Work History
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #4 - Total Points (Total Possible Points = 50)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #5 - Subcontractor Compliance
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #5 - Total Points (Total Possible Points = 150)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #6 - Software System
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #6 - Total Points (Total Possible 100)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total Technical Points (Total Possible Points = 800) Minimum Threshold = 5600.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total Cost PointsCost ScoresOfferor AOfferor BOfferor COfferor DOfferor EOfferor FOfferor GOfferor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
Cost
200.0Cost Points0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Score SummaryOfferor AOfferor BOfferor COfferor DOfferor EOfferor FOfferor GOfferor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
Total Technical Points (Total Possible = 800)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total Cost Points (Total Possible = 200)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Grand Total Points (Total Possible = 1000)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

File details come from the government source that posted it. Updated .