12-26-27 Bid Form -Rate Information Sheet.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Landscape - Installation and Repair Services - Including Hardscape
Solicitation number
BC-BID-26-27
Issued by
Bergen County, New Jersey

About this file

This is a Rate Information Sheet for Bid BC-BID-26-27, a landscape installation and repair services contract issued by the County of Bergen, New Jersey, for various using agencies. The contract covers landscape and hardscape installation and repair services on an as-needed basis for a 12-month period commencing from the date of award, with one optional 12-month renewal period.

The bid form requires vendors to submit hourly labor rates for eight distinct classifications: Project Manager, Landscape Architect, Site Supervisor, General Laborer, Equipment Operator, Irrigation Specialist, and Mason/Hardscape Technician. Each classification requires separate rate submissions for both non-prevailing wage work (applicable to jobs under $2,000 in combined materials and labor) and prevailing wage work (applicable to jobs of $2,000 or more). All labor rates are for standard Monday through Friday work hours from 8:00 AM to 4:30 PM, with overtime calculated at time-and-one-half for hours exceeding eight per day or before/after regular workday hours and all Saturday work, and double time for Sunday and holiday work. Vendors must also provide a parts and materials markup percentage that remains constant throughout the contract term and submit day rates for any specialized equipment rentals needed beyond standard equipment covered in daily labor rates.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BC-BID-26-27 Landscape: Installation & Repair Services - Including Hardscape - Various Using Agencies
UPDATED RATE INFORMATION SHEET
Vendor Name
Date
Signature
LABOR RATES
OVERTIME: Hours worked in excess of 8 per day or before or after the regular workday and all hours on Saturday shall be paid at time and one-half the hourly rate. All hours on Sunday and holidays shall be paid at double the hourly rate,
# 1 Project ManagerRate
# 1-1Non-Prevailing Wage Labor Rate Monday-Friday: 08:00AM-4:30pmRate is applicable to Jobs where materials and labor are less than $2000.00
# 1-2Prevailing Wage Labor Rate Monday-Friday: 08:00AM-4:30pmRate is applicable to Jobs where materials and labor is $2000.00 or more. This rate must cover all classifications of Labor
# 2 Landscape ArchitectRate
# 2-1Non-Prevailing Wage Labor Rate Monday-Friday: 08:00AM-4:30pmRate is applicable to Jobs where materials and labor are less than $2000.00
# 2-2Prevailing Wage Labor Rate Monday-Friday: 08:00AM-4:30pmRate is applicable to Jobs where materials and labor is $2000.00 or more. This rate must cover all classifications of Labor
# 3 Site SupervisorRate
#3-1Non-Prevailing Wage Labor Rate Monday-Friday: 08:00AM-4:30pmRate is applicable to Jobs where materials and labor are less than $2000.00
#3-2Prevailing Wage Labor Rate Monday-Friday: 08:00AM-4:30pmRate is applicable to Jobs where materials and labor is $2000.00 or more. This rate must cover all classifications of Labor
#4 General LaborerRate
# 4-1Non-Prevailing Wage Labor Rate Monday-Friday: 08:00AM-4:30pmRate is applicable to Jobs where materials and labor are less than $2000.00
# 4-2Prevailing Wage Labor Rate Monday-Friday: 08:00AM-4:30pmRate is applicable to Jobs where materials and labor is $2000.00 or more. This rate must cover all classifications of Labor
# 5 Equipment OperatorRate
# 5-1Non-Prevailing Wage Labor Rate Monday-Friday: 08:00AM-4:30pmRate is applicable to Jobs where materials and labor are less than $2000.00
# 5-2Prevailing Wage Labor Rate Monday-Friday: 08:00AM-4:30pmRate is applicable to Jobs where materials and labor is $2000.00 or more. This rate must cover all classifications of Labor
# 6 Irrigation SpecialistRate
# 6-1Non-Prevailing Wage Labor Rate Monday-Friday: 08:00AM-4:30pmRate is applicable to Jobs where materials and labor are less than $2000.00
# 6-2Prevailing Wage Labor Rate Monday-Friday: 08:00AM-4:30pmRate is applicable to Jobs where materials and labor is $2000.00 or more. This rate must cover all classifications of Labor
# 7 Mason/Hardscape TechnicianRate
# 7-1Non-Prevailing Wage Labor Rate Monday-Friday: 08:00AM-4:30pmRate is applicable to Jobs where materials and labor are less than $2000.00
# 7-2Prevailing Wage Labor Rate Monday-Friday: 08:00AM-4:30pmRate is applicable to Jobs where materials and labor is $2000.00 or more. This rate must cover all classifications of Labor
# 8 Parts and Materials Mark-UpRate
# 8-1Parts and Materials Mark-UpThis Please indicate a percentage Markup on your cost: This shall remain constant through out the life of the contract
# 9 Equipment List - Please list any equipment rental DAY ratesRate
List Equipment NamePlease list the DAY rate for any equipment rentals needed. All Standard Equipment is covered in the daily labor rates
List Equipment NamePlease list the DAY rate for any equipment rentals needed. All Standard Equipment is covered in the daily labor rates
List Equipment NamePlease list the DAY rate for any equipment rentals needed. All Standard Equipment is covered in the daily labor rates
List Equipment NamePlease list the DAY rate for any equipment rentals needed. All Standard Equipment is covered in the daily labor rates