12-11- Addendum 1- FAC133242.pdf
PDF 10 MB Posted
- Solicitation number
- SLCo FAC133242 ADC Heat Exchangers – Final Phase- CONST
- Issued by
- Utah
About this file
This is Addendum 1 to the bid documents for the ADC Heat Exchangers – Final Phase project issued by Salt Lake County through Architectural Nexus, Inc. The addendum, dated September 15, 2026, addresses pre-bid questions and drawing clarifications for the kitchen-admin water heater replacement project located at 3415 South 900 West in South Salt Lake City, Utah. The project involves replacing heat exchangers and associated piping systems, with specific requirements for copper pressure-seal-joint fittings for hot water supply pipe 2-1/2 inches and above, recirculating pump installations, and automatic air vents. The addendum clarifies that contractors must shut down and drain the system for new branch line connections to existing 8-inch mains rather than performing hot tapping. Bidders are required to acknowledge receipt of this addendum on their bid forms to avoid disqualification.
The addendum includes revised drawings across eight sheets covering mechanical systems (P102, P401, P402, P403, P404, P501) and electrical systems (E002, E403), with detailed specifications for domestic water expansion tanks, storage tanks, hydronic piping, and equipment schedules. Approved manufacturers for specific equipment include Niles Steel Tank for domestic storage tanks, Wilo for hydronic pumps, Titan and Griswold for Y-strainers, and Bell & Gossett for heat exchangers, while DHT heat exchangers are noted as not approved. The addendum also addresses practical construction questions regarding ceiling access panel reuse, fire watch requirements for welded fittings, and drain line installations, providing contractors with necessary clarifications for accurate bidding on the project's mechanical and plumbing divisions.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum Page 1 of 1
ADD #01
ARCHITECTURAL NEXUS, Inc archnexus.com
SALT LAKE CITY
2505 East Parleys Way Salt Lake City, Utah 84109 T 801.924.5000
SACRAMENTO
930 R Street Sacramento, California 95811 T 916.443.5911
ISSUE DATE: September 15, 2026 RESPONSE TO: Pre-Bid Questions and Drawing Clarifications PROJECT: ADC Heat Exchangers – Final Phase
3415 South 900 West South Salt Lake City, UT 84119
OWNER: Salt Lake County 2001 S State St Salt Lake City, UT 84190
ARCHITECT’S
PROJECT #:
25049
PAGES: 1 + Attachments (11) = Replaced attached drawings: P102, P401, P402, P403, P404, P501, E002, E403 Replace attached specifications: N/A
This Addendum forms a part of the Contract Documents and modifies the original Bid Documents as noted below.
Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. This Addendum includes all attachments noted, included herein by reference.
See the attached Cover Page & Drawings from Mechanical Engineer, dated September 14,2026 (8 sheets) &
Cover Page & Drawings from Electrical Engineer, dated September 15,2026 (3 sheets)
801.924.5000 asmith@archnexus.com 09.15.2026
Name Phone Email Date
, Project Manager
( 8 0 1 ) 5 3 0 - 3 1 4 8 r e s o l u t g r o u p . c o m i n f o @ r e s o l u t g r o u p . c o m
ADDENDUM NO 1
DATE: September 14, 2026
PROJECT NO: 250898
PROJECT: ADC Kitchen-Admin Water Heater Replacement
DIVISION – 21 & 22 & 23
CONTRACTORS QUESTIONS:
1. QUESTION: Clarify the pipe material and acceptable joining method for HWS pipe for 2-1/2” and above?
ANSWER: For HWS pipe 2-1/2” and above, provide Copper Pressure-Seal-Joint Fittings with wrought copper fittings with EPDM-rubber, o-ring seal in each end with a minimum 200-psig working-pressure rating at 250 deg. F. Copper pressure-seal joint fittings are also allowed for domestic water piping.
2. QUESTION: Sheet P403 shows 2 recirc pumps and there are no recirc pumps shown on the schedule, can you give the correct information on these pumps for bidding?
ANSWER: Recirculating Pump Schedules have been added.
3. QUESTION: Please confirm the drainpipe from high point auto vents runs to the floor as in previous phases with iso valve at floor level.
ANSWER: Provide drainpipe from high point auto vents and provide drain valves. It is not needed to extend drain lines to floor drains.
4. QUESTION: Please provide auto air vent detail.
ANSWER: Refer to specification 232116 section 2.2.B for Automatic Air Vents requirements.
5. QUESTION: Will hot tapping be required for new branch line connections to 8” mains (detail A3/P401&402), or will the system be shut down and drained to facilitate branch connections?
ANSWER: Contractor shall shut down system, drain, and refill system as needed for installation of new branch lines. Coordinate shut-down periods with owner.
6. QUESTION: Will a non-working fire watch person be required for hot work?
ANSWER: As an option, Copper Pressure-Seal-Joint Fittings are allowed to be installed and avoid a fire watch. If welded fittings are used, coordinate with Architect the requirements for a fire watch.
7. QUESTION: Will the ceiling access panels be reused? Do you want pricing for the broken one?
ANSWER: All ceiling panels to be reused. Coordinate existing conditions of access panels with owner.
DRAWINGS
SHEET – P102
1. Enlarged floor plan callout has been added. See revised drawings.
SHEET – P401
1. Refer to A6/P401: Domestic Expansion DET-J1 and Detail callouts have been added.
SHEET – P402
1. Refer to A6/P402: Domestic Expansion DET-J2 and Detail callouts have been added.
SHEET – P403
1. Refer to A6/P403: Pipe Sizes have been added to domestic water lines.
2. Refer to A6/P403: Domestic Expansion Tank DET-K1 has been added.
3. Refer to A3/P403: Domestic Expansion Tank DET-K1 has been added.
4. Refer to A3/P403: Existing isolation valves to be replaced with new on HWS and HWR existing lines.
Provide control valve and balancing valve.
5. Keynote 16 has been added.
SHEET – P404
1. Sheet P404 has been added. See revised drawings.
SHEET – P501
1. Detail B6/P501 has been added.
2. Inline Pump Detail call out has been updated to A6/P501.
3. Domestic Storage Tank ST-K1 schedule has been updated.
4. Domestic Expansion Tank DET-K1 schedule has been updated.
5. Recirculating Pump Schedules have been added.
6. Kitchen Domestic Water Heat Exchanger Detail has been updated.
7. Detail D6/P501 Hydronic Piping Detail has been added.
PRIOR APPROVALS
The following manufacturers, trade names and products are allowed to bid on a name brand only basis with the provision that they completely satisfy all and every requirement of the drawings, specifications and all addenda shall conform to the design, quality and standards specified, established and required for the complete and satisfactory installation and performance of the building and all its respective parts.
Item Manufacturer Comments Test and Balance Building Control System APPROVED Heat Exchangers DHT NOT APPROVED Domestic Storage Tank Niles Steel Tank APPROVED Hydronic Pump Wilo APPROVED Y-Strainer Titan, Griswold APPROVED Heat Exchangers Bell & Gossett APPROVED
C3 P402
A3 P401
A3 P402
C3 P401
B6 P404
B3 P404
LEVEL 2
OVERALL -
PLUMBING
PLAN
P102
KEY PLAN
P102
A4 LEVEL 2 OVERALL - PLUMBING PLAN
DATE:
DRAWN BY:
CHECKED BY:
NEXUS PROJ. #:
123456
E
D
C
B
A
Architectural NEXUS, Inc.
2505 East Parleys Way Salt Lake City, Utah 84109 T 801.924.5000 http://www.archnexus.com
Original drawings remain the property of the Architect and as such the Architect retains total ownership and control. The design represented by these drawings is sold to the client for a one time use, unless otherwise agreed upon in writing by the Architect.
© ARCH NEXUS All Rights Reserved
JBaker
250898
05/20/2026
CD SET
MArtica
S
W
, S ou th S al t L ak e, U T
Sa lt
La ke
C ou nt y
A D
C K itc he n- A dm in
W at er H ea te r R ep la ce m en t
# Date Revision
181 E 5600 S, Murray, UT 84107 | (801) 530-3148 info@resolutgroup.com | resolutgroup.com
Project #: 250898
No. 8325442-2202
JACOB D.
BECK
05-20-26
SCALE: 1/32" = 1'-0"
0' 32' 64'
2-1/2" HWS UP
2-1/2" HWR UP
HX
J1
P J1
HW
S
HW
R
2-1/2"
2-1/2"
11 12
3" (E)
3" (E)
3" (E)
3 2
2" (E)
2" (E)
2" HWR UP (E)
2" HWS UP (E)
3" (E)3" (E)
2-1/2"
2-1/2"
3"
3"
HX
J1
DET
J1
%6 P501
HWR
HWS
(E)8"
(E)8"
(E)6"
(E)6"
(E) 2" HWS DN
(E) 2" HWR DN
HWR
HWS
(E)8"
(E)8"
(E)6"
(E)6"
2-1/2" HWS DN
2-1/2" HWR DN
LARGE SCALE
PLUMBING
PLANS
P401
S&A/E� 1/4" 1 -0"
S&A/E� 1/4" 1 -0" S&A/E� 1/4" 1 -0"
.E< P/AN
A4 /AR*E S&A/E 0E&HAN,&A/ P,P,N* P/AN
S&A/E�
&4 /AR*E S&A/E DE02 0E&HAN,&A/ P,P,N* P/AN
S&A/E�
&6 /AR*E S&A/E DE02 P/U0%,N* P/AN
S&A/E�
A6 /AR*E S&A/E P/U0%,N* P/AN
S&A/E�
P401P401
P401 P401
.E<N2TES
1� EX,ST,N* D20EST,& WATER HEATER T2 %E DE02/,SHED�
DE02/,SH A// ASS2&,ATED P,P,N* AND A&&ESS2R,ES AS SH2WN
X
D� ),E/D 9ER,)< EX,ST,N* &2ND,T,2NS�
2� DE02/,SH EX,ST,N* D&W/DHW P,P,N* A/2N* W,TH A//
ASS2&,ATED A&&ESS2R,ES AS SH2WN X
D� ),E/D 9ER,)< EX,ST,N*
&2ND,T,2NS�
3� EXTEND EX,ST,N* &2N&RETE PAD )2R ,NSTA//AT,2N 2) NEW
E4U,P0ENT� ),E/D 9ER,)< EX,ST,N* &2ND,T,2NS�
4� DE02/,SH EX,ST,N* HWS/HWR P,P,N* A/2N* W,TH A//
ASS2&,ATED A&&ESS2R,ES AS SH2WN X
D� ),E/D 9ER,)< EX,ST,N*
&2ND,T,2NS�
5� DE02/,SH EX,ST,N* PNEU0AT,& &2NTR2/ 9A/9E� DE02/,SH
PNEU0AT,& TU%,N* %A&. T2 S2UR&E AND &AP�
6� EX,ST,N* H<DR2N,& PU0P T2 %E DE02/,SHED�
7� PR29,DE ,S2/AT,2N 9A/9E ,N A&&ESS,%/E /2&AT,2N� T<P,&A/ 2)
A//�
8� &2NNE&T NEW D&W/DHW P,P,N* T2 EX,ST,N* 0A,NS� ),E/D 9ER,)<
EX,ST,N* &2ND,T,2NS�
9� D2 N2T USE EX,ST,N* P,PE STU%-2UTS )2R ,NSTA//AT,2N 2) NEW
P,P,N*� PR29,DE NEW P,PE STU%-2UTS T2 0AT&H NEW P,PE S,=E
&2NNE&T,2N� ),E/D 9ER,)< EX,ST,N* &2ND,T,2NS�
10� PU0P SHA// %E ,NSTA//ED R2U*H/< 4 )EET A%29E ),N,SHED
)/22R� PU0P 02T2R SHA// %E ,NSTA//ED ,N THE 9ERT,&A/
P2S,T,2N� &22RD,NATE EXA&T PU0P 2R,ENTAT,2N AND /2&AT,2N
W,TH 2WNER PR,2R T2 ,NSTA//AT,2N�
11� A// NEW P,P,N* SHA// %E ,NSTA//ED AS H,*H AS P2SS,%/E AS T2
A//2W 0A,NTENAN&E A&&ESS 2N A// S,DES 2) HEAT EX&HAN*ER�
&22RD,NATE W,TH EX,ST,N* &2ND,T,2NS�
12� PR29,DE 9A/9ES AND AUT2 A,R 9ENTS W,TH DRA,NS AT A//
H<DR2N,& P,P,N* H,*H P2,NTS )2R A,R RE029A/�
DATE�
DRAWN %<�
&HE&.ED %<�
NEXUS PR2J� ��
123456
E
D
A
AUFKLWeFWuUDO NEXUS� ,nF� 2505 EDVW PDUOe\V WD\ SDOW /DNe &LW\� UWDK 84109 T 801�924�5000 KWWS�//ZZZ�DUFKne[uV�FRm
2ULJLnDO dUDZLnJV UemDLn WKe SURSeUW\ RI WKe AUFKLWeFW Dnd DV VuFK WKe AUFKLWeFW UeWDLnV WRWDO RZneUVKLS Dnd FRnWURO� TKe deVLJn UeSUeVenWed E\ WKeVe dUDZLnJV LV VROd WR WKe FOLenW IRU D Rne WLme uVe� unOeVV RWKeUZLVe DJUeed uSRn Ln ZULWLnJ E\ WKe AUFKLWeFW� � AR&H NEXUS AOO RLJKWV ReVeUYed
J%DNeU
250898
05/20/2026
CD SET
0AUWLFD
S
W
, S ou th S al t L ak e, U T
Sa lt
La ke
C ou nt y
A D
C K itc he n- A dm in
W at er H ea te r R ep la ce m en t
� DDWe ReYLVLRn
181 E 5600 S� 0uUUD\� UT 84107 _ (801) 530-3148 LnIR#UeVROuWJURuS�FRm _ UeVROuWJURuS�FRm
PURMeFW �� 250898
No. 8325442-2202
JACOB D.
BECK
05-20-26
S&A/E� 1/4" 1 -0"
&3 /E9E/ 2 DE02 0E&HAN,&A/ P,P,N* P/AN
S&A/E� P401
S&A/E� 1/4" 1 -0"
A3 /E9E/ 2 0E&HAN,&A/ P,P,N* P/AN
S&A/E� P401
1 09/14/2026 Addendum 01
HX
J2
P J2
2-1/2" HWR UP
2-1/2" HWS UP 2-1/2"
2-1/2"
HW
S
HW
R
11 12
3" (E)
3" (E)
2" HWR (E)
2" HWS (E)
2" HWS UP (E)
2" HWR UP (E)
HX
J2
3" (E)
3" (E)
3"
2-1/2"
3"
2-1/2"
DET
J2
%6 P501
(E)8"
(E)8"
(E) 2" HWS DN
(E) 2" HWR DN
HWR
HWS
(E)8"
(E)8"
HWR
HWS
2-1/2" HWS DN
2-1/2" HWR DN
2-1/2"2-1/2"
LARGE SCALE
PLUMBING
PLANS
P402
S&A/E� 1/4" 1 -0"
.E< P/AN
A4 /AR*E S&A/E 0E&HAN,&A/ P,P,N* P/AN
S&A/E�
&4 /AR*E S&A/E DE02 0E&HAN,&A/ P,P,N* P/AN
S&A/E�
&6 /AR*E S&A/E DE02 P/U0%,N* P/AN
S&A/E�
A6 /AR*E S&A/E P/U0%,N* P/AN
S&A/E�
P402P402
P402 P402
DATE�
DRAWN %<�
&HE&.ED %<�
NEXUS PR2J� ��
123456
E
D
A
AUFKLWeFWuUDO NEXUS� ,nF� 2505 EDVW PDUOe\V WD\ SDOW /DNe &LW\� UWDK 84109 T 801�924�5000 KWWS�//ZZZ�DUFKne[uV�FRm
2ULJLnDO dUDZLnJV UemDLn WKe SURSeUW\ RI WKe AUFKLWeFW Dnd DV VuFK WKe AUFKLWeFW UeWDLnV WRWDO RZneUVKLS Dnd FRnWURO� TKe deVLJn UeSUeVenWed E\ WKeVe dUDZLnJV LV VROd WR WKe FOLenW IRU D Rne WLme uVe� unOeVV RWKeUZLVe DJUeed uSRn Ln ZULWLnJ E\ WKe AUFKLWeFW� � AR&H NEXUS AOO RLJKWV ReVeUYed
J%DNeU
250898
05/20/2026
CD SET
0AUWLFD
S
W
, S ou th S al t L ak e, U T
Sa lt
La ke
C ou nt y
A D
C K itc he n- A dm in
W at er H ea te r R ep la ce m en t
� DDWe ReYLVLRn
181 E 5600 S� 0uUUD\� UT 84107 _ (801) 530-3148 LnIR#UeVROuWJURuS�FRm _ UeVROuWJURuS�FRm
PURMeFW �� 250898
No. 8325442-2202
JACOB D.
BECK
05-20-26
S&A/E� 1/4" 1 -0"
&3 /E9E/ 2 DE02 0E&HAN,&A/ P,P,N* P/AN
S&A/E� P402
S&A/E� 1/4" 1 -0"
A3 /E9E/ 2 0E&HAN,&A/ P,P,N* P/AN
S&A/E� P402
.E<N2TES
1� EX,ST,N* D20EST,& WATER HEATER T2 %E DE02/,SHED�
DE02/,SH A// ASS2&,ATED P,P,N* AND A&&ESS2R,ES AS SH2WN
X
D� ),E/D 9ER,)< EX,ST,N* &2ND,T,2NS�
2� DE02/,SH EX,ST,N* D&W/DHW P,P,N* A/2N* W,TH A//
ASS2&,ATED A&&ESS2R,ES AS SH2WN X
D� ),E/D 9ER,)< EX,ST,N*
&2ND,T,2NS�
3� EXTEND EX,ST,N* &2N&RETE PAD )2R ,NSTA//AT,2N 2) NEW
E4U,P0ENT� ),E/D 9ER,)< EX,ST,N* &2ND,T,2NS�
4� DE02/,SH EX,ST,N* HWS/HWR P,P,N* A/2N* W,TH A//
ASS2&,ATED A&&ESS2R,ES AS SH2WN X
D� ),E/D 9ER,)< EX,ST,N*
&2ND,T,2NS�
5� DE02/,SH EX,ST,N* PNEU0AT,& &2NTR2/ 9A/9E� DE02/,SH
PNEU0AT,& TU%,N* %A&. T2 S2UR&E AND &AP�
6� EX,ST,N* H<DR2N,& PU0P T2 %E DE02/,SHED�
7� PR29,DE ,S2/AT,2N 9A/9E ,N A&&ESS,%/E /2&AT,2N� T<P,&A/ 2)
A//�
8� &2NNE&T NEW D&W/DHW P,P,N* T2 EX,ST,N* 0A,NS� ),E/D 9ER,)<
EX,ST,N* &2ND,T,2NS�
9� D2 N2T USE EX,ST,N* P,PE STU%-2UTS )2R ,NSTA//AT,2N 2) NEW
P,P,N*� PR29,DE NEW P,PE STU%-2UTS T2 0AT&H NEW P,PE S,=E
&2NNE&T,2N� ),E/D 9ER,)< EX,ST,N* &2ND,T,2NS�
10� PU0P SHA// %E ,NSTA//ED R2U*H/< 4 )EET A%29E ),N,SHED
)/22R� PU0P 02T2R SHA// %E ,NSTA//ED ,N THE 9ERT,&A/
P2S,T,2N� &22RD,NATE EXA&T PU0P 2R,ENTAT,2N AND /2&AT,2N
W,TH 2WNER PR,2R T2 ,NSTA//AT,2N�
11� A// NEW P,P,N* SHA// %E ,NSTA//ED AS H,*H AS P2SS,%/E AS T2
A//2W 0A,NTENAN&E A&&ESS 2N A// S,DES 2) HEAT EX&HAN*ER�
&22RD,NATE W,TH EX,ST,N* &2ND,T,2NS�
12� PR29,DE 9A/9ES AND AUT2 A,R 9ENTS W,TH DRA,NS AT A//
H<DR2N,& P,P,N* H,*H P2,NTS )2R A,R RE029A/�
K1
P K1
5" (E)
HWS
HWR
3" 3"
3"
3"
HWS
HWR
ST
K1
DET
K1
(E) 3/4"
(E) 2"
(E) 3"
(E) 2-1/2"
(E) 3/4"
(E) 3"
5" (E)
5 6
HWS
HWR
HX
K1
(E) 3/4"
(E) 2"
(E) 3"
(E) 2-1/2"
(E) 3/4"
(E) 3"
ST
K1
RCP
K1
RCP
K2
2"
2-1/2" 3/4"
3/4"
3" 3"
3"
DET
K1
3"
1"
LARGE SCALE
PLUMBING
PLANS
P403
SCA/E� 1/4" 1
-0"
SCA/E� 1/4" 1
KE< P/A1
A3 /AR*E SCA/E 0ECHA1,CA/ P,P,1* P/A1
SCA/E�
C3 /AR*E SCA/E DE02 0ECHA1,CA/ P,P,1* P/A1
SCA/E�
C6 /AR*E SCA/E DE02 P/80%,1* P/A1
SCA/E�
A6 /AR*E SCA/E P/80%,1* P/A1
SCA/E�
P403P403
P403 P403
DATE�
DRAW1 %<�
CHECKED %<�
1EX8S PR2-� ��
123456
E
D
C
A
AUFKLWeFWuUDO 1EX8S� ,nF� 2505 EDVW PDUOe\V WD\ SDOW /DNe CLW\� 8WDK �4109 T �01�924�5000 KWWS�//ZZZ�DUFKne[uV�FRm
2ULJLnDO dUDZLnJV UemDLn WKe SURSeUW\ RI WKe AUFKLWeFW Dnd DV VuFK WKe AUFKLWeFW UeWDLnV WRWDO RZneUVKLS Dnd FRnWURO� TKe deVLJn UeSUeVenWed E\ WKeVe dUDZLnJV LV VROd WR WKe FOLenW IRU D Rne WLme uVe� unOeVV RWKeUZLVe DJUeed uSRn Ln ZULWLnJ E\ WKe AUFKLWeFW� � ARCH 1EX8S AOO RLJKWV ReVeUYed
-%DNeU
250�9�
05/20/2026
CD SET
0AUWLFD
S
W
, S ou th S al t L ak e, U T
Sa lt
La ke
C ou nt y
A D
C K itc he n- A dm in
W at er H ea te r R ep la ce m en t
� DDWe ReYLVLRn
1�1 E 5600 S� 0uUUD\� 8T �410� _ (�01) 530-314� LnIR#UeVROuWJURuS�FRm _ UeVROuWJURuS�FRm
PURMeFW �� 250�9�
No. 8325442-2202
JACOB D.
BECK
05-20-26
KE<12TES
1� EX,ST,1* D20EST,C WATER HEATER T2 %E DE02/,SHED�
DE02/,SH A// ASS2C,ATED P,P,1* A1D ACCESS2R,ES AS SH2W1
X
D� ),E/D 9ER,)< EX,ST,1* C21D,T,21S�
2� DE02/,SH EX,ST,1* DCW/DHW P,P,1* A/21* W,TH A//
ASS2C,ATED ACCESS2R,ES AS SH2W1 X
D� ),E/D 9ER,)< EX,ST,1*
C21D,T,21S�
3� EXTE1D EX,ST,1* C21CRETE PAD )2R ,1STA//AT,21 2) 1EW
E48,P0E1T� ),E/D 9ER,)< EX,ST,1* C21D,T,21S�
4� DE02/,SH EX,ST,1* HWS/HWR P,P,1* A/21* W,TH A//
ASS2C,ATED ACCESS2R,ES AS SH2W1 X
D� ),E/D 9ER,)< EX,ST,1*
C21D,T,21S�
5� DE02/,SH EX,ST,1* P1E80AT,C C21TR2/ 9A/9E� DE02/,SH
P1E80AT,C T8%,1* %ACK T2 S28RCE A1D CAP�
6� EX,ST,1* H<DR21,C P80P T2 %E DE02/,SHED�
�� PR29,DE ,S2/AT,21 9A/9E ,1 ACCESS,%/E /2CAT,21� T<P,CA/ 2)
A//�
�� C211ECT 1EW DCW/DHW P,P,1* T2 EX,ST,1* 0A,1S� ),E/D 9ER,)<
EX,ST,1* C21D,T,21S�
9� D2 12T 8SE EX,ST,1* P,PE ST8%-28TS )2R ,1STA//AT,21 2) 1EW
P,P,1*� PR29,DE 1EW P,PE ST8%-28TS T2 0ATCH 1EW P,PE S,=E
C211ECT,21� ),E/D 9ER,)< EX,ST,1* C21D,T,21S�
10� P80P SHA// %E ,1STA//ED R28*H/< 4 )EET A%29E ),1,SHED
)/22R� P80P 02T2R SHA// %E ,1STA//ED ,1 THE 9ERT,CA/
P2S,T,21� C22RD,1ATE EXACT P80P 2R,E1TAT,21 A1D /2CAT,21
W,TH 2W1ER PR,2R T2 ,1STA//AT,21�
11� A// 1EW P,P,1* SHA// %E ,1STA//ED AS H,*H AS P2SS,%/E AS T2
A//2W 0A,1TE1A1CE ACCESS 21 A// S,DES 2) HEAT EXCHA1*ER�
C22RD,1ATE W,TH EX,ST,1* C21D,T,21S�
12� PR29,DE 9A/9ES A1D A8T2 A,R 9E1TS W,TH DRA,1S AT A//
H<DR21,C P,P,1* H,*H P2,1TS )2R A,R RE029A/�
13� DE02/,SH (2) EX,ST,1* D20EST,C WATER REC,RC8/AT,21 P80PS�
),E/D 9ER,)< EX,ST,1* C21DT,T,21S�
14� PR29,DE %A/A1C,1* 9A/9E W,TH ,S2/AT,21 9A/9ES AT ,1/ET A1D
28T/ET� SET %A/A1C,1* 9A/9E T2 3�0 *P0�
15� PR29,DE %A/A1C,1* 9A/9E W,TH ,S2/AT,21 9A/9ES AT ,1/ET A1D
28T/ET� SET %A/A1C,1* 9A/9E T2 2�0 *P0�
16� PR29,DE DDC C21TR2/ 9A/9E A1D ,1TERC211ECT W,TH EX,ST,1*
%0S� PR29,DE W,TH %A/A1C,1* 9A/9E� SET %A/A1C,1* 9A/9E T2
�6 *P0�
1 09/14/2026 Addendum 01
HW
S
HW
R
(E)2-1/2"
(E)2-1/2"
(E)4"(E)4"
HW
S
HW
R
(E)2-1/2"
(E)2-1/2"
(E)4"(E)4"
LARGE SCALE
PLUMBING
PLANS
P404
S&A/E� 1/4" 1 -0"
.E< 3/A1
%� /AR*E S&A/E 0E&HA1,&A/ 3,3,1* 3/A1
S&A/E�
%6 /AR*E S&A/E 'E02 0E&HA1,&A/ 3,3,1* 3/A1
S&A/E� 3404 3404
'A7E�
'RAW1 %<�
&HE&.E' %<�
1E;8S 3R2-� ��
12�4�6
E
A
AUFKLWeFWuUDO 1E;8S� ,nF� 2�0� EDVW 3DUOe\V WD\ SDOW /DNe &LW\� 8WDK �4109 7 �01�924��000 KWWS�//ZZZ�DUFKne[uV�FRm
2ULJLnDO dUDZLnJV UemDLn WKe SURSeUW\ RI WKe AUFKLWeFW Dnd DV VuFK WKe AUFKLWeFW UeWDLnV WRWDO RZneUVKLS Dnd FRnWURO� 7Ke deVLJn UeSUeVenWed E\ WKeVe dUDZLnJV LV VROd WR WKe FOLenW IRU D Rne WLme uVe� unOeVV RWKeUZLVe DJUeed uSRn Ln ZULWLnJ E\ WKe AUFKLWeFW� � AR&H 1E;8S AOO RLJKWV ReVeUYed
-%DNeU
2�0�9�
0�/20/2026
CD SET
0AUWLFD
S
W
, S ou th S al t L ak e, U T
Sa lt
La ke
C ou nt y
A D
C K itc he n- A dm in
W at er H ea te r R ep la ce m en t
� 'DWe ReYLVLRn
1�1 E �600 S� 0uUUD\� 87 �410� _ (�01) ��0-�14� LnIR#UeVROuWJURuS�FRm _ UeVROuWJURuS�FRm
3URMeFW �� 2�0�9�
No. 8325442-2202
JACOB D.
BECK
0�-20-26
.E<127ES
1� E;,S7,1' HWS A1' HWR %RA1&H /,1ES ARE &211E&7E' 72 7HE
,1&2RRE&7 0A,1 /,1ES� 'E02/,SH %RA1&H /,1ES 32,17 2)
&211E&7,21 A1' &211E&7 HWS A1' HWR %RA1&H /,1ES 72 7HE
&2RRES321',1* 0A,1 /,1ES� &217RA&72R 72 ),; 3,3E /A%E/,1*
72 ,1',&A7E 7HE &2RRE&7 3,3E 7<3E� ),E/' 9ER,)< A// E;,S7,1*
&21',7,21S 72 0A7&H E;,S7,1* &21',7,21S�
2� E;,S7,1* %A/A1&,1* 9A/9E 72 %E RE%A/A1&E' 72 �� *30 72
0A7&H E;,S7,1* &21',7,21S�
K1
HX
K1
DCW SUPPLY FROM BUILDING.
SHUT-OFF VALVE (TYP)
UNION (TYP)
O-1 00°
F
THERMOMETER (TYP)
5.0 GPM
CONCRETE PAD
DET
K1
130° DHWR LINE FROM BUILDING.
O-1
00° F
GPM40
ST
K1
140°F WATER
HEAT EXCHANGER
140°F WATER140°F STORAGE
TANK
EXPANSION
TANK
DOMESTIC
RCP
K1
RCP
K2
HEAT EXCHANGER
140° DHW SUPPLY TO BUILDING.
O-1 00°
F
DATE:
DRAWN BY:
CHECKED BY:
NEXUS PROJ. #:
123456
E
D
C
B
A
Architectural NEXUS, Inc.
2505 East Parleys Way Salt Lake City, Utah 84109 T 801.924.5000 http://www.archnexus.com
Original drawings remain the property of the Architect and as such the Architect retains total ownership and control. The design represented by these drawings is sold to the client for a one time use, unless otherwise agreed upon in writing by the Architect.
© ARCH NEXUS All Rights Reserved
JBaker
250898
05/20/2026
CD SET
MArtica
S
W
, S ou th S al t L ak e, U T
Sa lt
La ke
C ou nt y
A D
C K itc he n- A dm in
W at er H ea te r R ep la ce m en t
# Date Revision
181 E 5600 S, Murray, UT 84107 | (801) 530-3148 info@resolutgroup.com | resolutgroup.com
Project #: 250898
No. 8325442-2202
JACOB D.
BECK
05-20-26
REDUCER AS
VALVE (TYPICAL)
SHUT OFF
FLOW SETTER
CHECK VALVE
STRAINER W/BLOW
DOWN VALVE AND
HOSE CONNECTION
REQUIRED
PUMP (SEE PLAN) THERMOMETER
INLINE PUMP DETAIL
NO SCALE
A6
PLUMBING
SCHEDULES &
DETAILS
P501
KITCHEN DOMESTIC WATER HEAT EXCHANGER DETAIL
NO SCALE
A3
HEAT EXCHANGER SCHEDULE
SOURCE MEDIUM (HYDRONIC) TRANSFER MEDIUM (HYDRONIC) PHYSICAL
ENTERING/ ENTERING/ LENGTH./
MANUFACTURER FLOW LEAVING HEAD FLOW LEAVING HEAD WIDTH /
AND LOAD RATE TEMP. WORKING LOSS RATE TEMP. WORKING LOSS HEIGHT
ID MODEL NUMBER LOCATION TYPE USAGE (BTU/H) (GPM) (°F) FLUID (PSI) (GPM) (°F) FLUID (PSI) (IN/IN) NOTES
HX-J1 (2) AERCO SPDWEV EV-30 MECHANICAL ROOM DOUBLE WALL DOMESTIC 4,550,000 63 210 / 133 30% PG 15.8 65 40 / 110 WATER 6.5 32 / 24 / 75 1,2,3,4
HX-J2 (2) AERCO SPDWEV EV-30 MECHANICAL ROOM DOUBLE WALL DOMESTIC 4,550,000 63 210 / 133 30% PG 15.8 65 40 / 110 WATER 6.5 32 / 24 / 75 1,2,3,4
HX-K1 (2) AERCO SPDWEV EV-90 MECHANICAL ROOM DOUBLE WALL DOMESTIC 8,064,000 76 210 / 98 30% PG 11.7 70 40 / 160 WATER 3 32 / 24 / 75 1,2,3,4
1. ELECTRICAL REQUIREMENTS: 120/1/60 HZ.
2. PACKAGED WITH 3-WAY ELECTRONIC CONTROL VALVE.
3. COUNTER-CURRENT FLOW STAINLESS STEEL, BRAZED PLATE DOUBLE WALL HEAT EXCHANGER. ASME CODE SECTION VIII RATED FOR 150 PSIG.
4. EACH SYSTEM CONSISTS OF TWO SEPARATE WATER TO WATER HEAT EXCHANGER PIPED IN REVERSE RETURN CONFIGURATION.
DOMESTIC EXPANSION TANK SCHEDULE
FLUID PHYSICAL
MANUFACTURER MIN. TANK/ TANK RELIEF DIA./ NPT
AND WORKING ACCEPTANCE SIZE VALVE HEIGHT FITTING
ID MODEL NUMBER LOCATION TYPE FLUID (GAL) (GAL) (PSIG) (IN) (IN) NOTES
DET-J1 AMTROL ST-12C-DD PUMBING CHASE DIAPHRAGM WATER 3.2 6.4 150 12/18 3/4 1,2
DET-J2 AMTROL ST-12C-DD PUMBING CHASE DIAPHRAGM WATER 3.2 6.4 150 12/18 3/4 1,2
DET-K1 AMTROL ST-447C PUMBING CHASE BLADDER WATER 53 53 150 24/45 2 3
1. DIAPHRAGM: HEAVY DUTY BUTY NSF/ANSI 61.
2. ANTIMICROBIAL POLYPROPYLENE LINER.
3. STEEL TANK WITH HEAVY DUTY BUTYL NSF/ANSI 61 FULL ACCEPTANCE BLADDER.
HYDRONIC PUMP SCHEDULE
FLUID ELECTRICAL
MANUFACTURER FLOW HEAD MOTOR MOTOR
AND RATE WORKING LOSS SIZE SPEED
ID MODEL NUMBER LOCATION TYPE (GPM) FLUID (FT) (HP) (RPM) VOLT/PH/HZ NOTES
P-J1 B&G E-90 1.5AB MECHANICAL J2043 IN-LINE 60 30% PG 40 1-1/2 1800 460/3/60 1,2,3,4
P-J2 B&G E-90 1.5AB MECHANICAL J2044 IN-LINE 60 30% PG 40 1-1/2 1800 460/3/60 1,2,3,4
P-K1 B&G E-90 1.5AB MECHANICAL ROOM IN-LINE 76 30% PG 40 1-1/2 1800 460/3/60 1,2,3,4
1. CAST IRON CONSTRUCTION.
2. PERMANENTLY LUBRICATED MOTOR TYPE.
3. BRONZE SLEEVE, OIL LUBRICATED MOTOR. PROVIDE OVERLOAD PROTECTION.
4. PUMP TO BE INSTALLED IN THE HORIZONTAL POSITION WITH A VERTICAL MOUNTED MOTOR. COORDINATE EXACT LOCATION AND ELEVATION WITH OWNER.
DOMESTIC WATER HEAT EXCHANGER DETAIL
NO SCALE
B6
DOMESTIC STORAGE TANK SCHEDULE
WORKING DIA/
CAPACITY PRESS. HEIGHT
ID MANUFACTURER SERVICE (GAL) (PSI) (IN) NOTES
ST-K1 AERCO DUPLEX SS DOMESTIC HOT WATER 300 150 46 / 75 1,2,3
1. DUPLEX STAINLESS STEEL DOMESTIC WATER STORAGE TANK.
2. ASME STAMPED AND NATIONAL BOARD REGISTERED FOR 150 PSI.
3. FIBERGLASS INSULATION AND COATED STEEL JACKET PANELS.
RECIRCULATING PUMP SCHEDULE
FLUID ELECTRICAL
MANUFACTURER FLOW HEAD MOTOR MOTOR
AND RATE WORKING LOSS SIZE SPEED
ID MODEL NUMBER LOCATION TYPE (GPM) FLUID (FT) (HP) (RPM) VOLT/PH/HZ NOTES
RCP-K1 B&G PL-36 MECHANICAL ROOM IN-LINE 5 DHW 30 1/6 3300 120/1/60 1,2
RCP-K2 B&G PL-100 MECHANICAL ROOM IN-LINE 40 DHW 20 2/5 3250 120/1/60 1,2
1. CAST IRON CONSTRUCTION, STAINLESS STEEL FACE PLATE.
2. PERMANENTLY LUBRICATED MOTOR TYPE.
HYDRONIC PIPING DETAIL (JAIL SUPPORT, TYPICAL OF 2)
NO SCALE
D6
( 8 0 1 ) 5 3 0 - 3 1 4 8 r e s o l u t g r o u p . c o m i n f o @ r e s o l u t g r o u p . c o m
ADDENDUM NO 1
DATE: September 15, 2026
PROJECT NO: 250898
PROJECT: ADC Kitchen-Admin Water Heater Replacement
DIVISION – 26
DRAWINGS
SHEET – E002 – ELECTRICAL DETAILS AND SCHEDULES
1. Added panel schedule NLK4
2. Updated Equipment Schedule
a. Added RCP-K1.
b. Added RCP-K2.
SHEET – E403 – ENLARGED ELECTRICAL PLANS
1. Added RCP-K1 and RCP-K2.
ELECTRICAL
DETAILS AND
SCHEDULES
E002
DATE:
DRAWN BY:
CHECKED BY:
NEXUS PROJ. #:
123456
E
D
C
B
A
Architectural NEXUS, Inc.
2505 East Parleys Way Salt Lake City, Utah 84109 T 801.924.5000 http://www.archnexus.com
Original drawings remain the property of the Architect and as such the Architect retains total ownership and control. The design represented by these drawings is sold to the client for a one time use, unless otherwise agreed upon in writing by the Architect.
© ARCH NEXUS All Rights Reserved
STruong
250898
05/21/2026
CONSTRUCTION
DOCUMENTS
STruong
S
W
, S ou th S al t L ak e, U T
Sa lt
La ke
C ou nt y
A D
C K itc he n- A dm in
W at er H ea te r R ep la ce m en t
# Date Revision
181 E 5600 S, Murray, UT 84107 | (801) 530-3148 info@resolutgroup.com | resolutgroup.com
Project #:
PM: SANG TRUONG
250898
L
IC
EN
SE
D P
ROFESS I ONAL ENG
IN
E
ER
14275529
STA T E O F U TAH
SANG TRUONG
No.
05-21-2026
STRUCTURE
STRUCTURE
STRUCTURE STRUCTURE
ALL THREAD (SIZE AS
REQUIRED) 3/8" MIN.
BEAM CLAMPS OR HANGER
CLAMPS (AS REQUIRED BY
WEIGHT SUPPORTED)
RACEWAY. (3/4" - 6")
CONDUIT HANGER
BEAM CLAMPS OR HANGER
CLAMPS (AS REQUIRED BY
WEIGHT SUPPORTED)
RACEWAY. (3/4" - 6")
NOTES:
1. WIRE SHALL NOT BE USED AS A COMPONENT OF ANY
RACEWAY HANGER SYSTEM.
2. DO NOT SUPPORT ANY RACEWAY LARGER THAN 1"
FROM BOTTOM CORD OF STEEL TRUSSES.
REFER TO SECTION FOR
ATTACHMENT OF ALL
THREAD ROD TO KINDORF
CHANNEL
1 1/2"x1 1/2"-12GA. KINDORF
CHANNEL OR APPROVED
SUBSTITUTE
3/8" ALL THREAD,
MINIMUM. INCREASE ROD
SIZE IF WEIGHT
REQUIRES PER ROD
MANUFACTURERS
RECOMMENDATIONS.
SUPPORT CONDUIT WITH
KINDORF STRAP OR
APPROVED SUBSTITUTE.
BEAM CLAMPS OR
HANGER CLAMPS AS
REQUIRED BY WEIGHT
SUPPORTED
PROVIDE 25% SPACE CAPACITY
NUT
WASHER
WASHER
NUT
METAL PIPE OR
CONDUIT
SUPPORTING MATERIAL
1" (25mm) DEPTH CAULK
CP-25 OR PUTTY 303
WITHIN
COVER CAULK SURFACE WITH
MASKING TAPE OR BACKER ROD
UNTIL CURED (24-72 HOURS) TO
PREVENT SAGGING OF CAULK IF
IT OCCURS (SEE NOTE 5)
2 OR 3 HOUR FIRE RATED CONCRETE
BLOCK WALL
FILL GAP COMPLETELY AROUND PIPE WITH
CAULK CP-25 OR PUTTY 303 FLUSH TO
SURFACE OF SLAB (SEE NOTE 3)
2 OR 3 HOUR FIRE
RATED CONCRETE
FLOOR SLAB
METAL PIPE OR CONDUIT SUPPORTING MATERIAL AS FIBERGLASS
INSULATION BACKER ROD OR SAFING.
NEED ONLY ENOUGH TO SUPPORT
WEIGHT OF CP-25 OR PUTTY 303
J �(X�
�(X��(X�
J
�(X�
�(X��(X�
STH
STH
1/K5�4�
HX
K1
P K1
RCP
K1
RCP
K2
1/K4�55
1/K4�571
STH
STH
SC$/(��1�4�� �1
SC$/(��1�4�� �1
K(<�P/$1
1 /$R*(�SC$/(�(/(CTR,C$/�'(02�P/$1
SC$/(��
2 /$R*(�SC$/(�(/(CTR,C$/�P/$1
SC$/(��(4�3 (4�3
'$T(� 'R$:1�%<�
CH(CK('�%<�
1(X8S�PR2J����
123456
C
$UFKLWHFWXUDO�1(X8S��,QF�
25�5�(DVW�PDUOH\V�:D\
SDOW�/DNH�CLW\���8WDK��841��
T�8�1��24�5���
KWWS���ZZZ�DUFKQH[XV�FRP
2ULJLQDO�GUDZLQJV�UHPDLQ�WKH�SURSHUW\
RI�WKH�$UFKLWHFW�DQG�DV�VXFK�WKH
$UFKLWHFW�UHWDLQV�WRWDO�RZQHUVKLS�DQG
FRQWURO���TKH�GHVLJQ�UHSUHVHQWHG�E\
WKHVH�GUDZLQJV�LV�VROG�WR�WKH�FOLHQW�IRU
D�RQH�WLPH�XVH��XQOHVV�RWKHUZLVH
DJUHHG�XSRQ�LQ�ZULWLQJ�E\�WKH�$UFKLWHFW�
��$RCH�1(X8S�$OO�RLJKWV�RHVHUYHG
STUXRQJ
25�8�8
�5�21�2�26
CONSTRUCTION
DOCUMENTS
STUXRQJ
S
W
, S ou th S al t L ak e, U T
Sa lt
La ke
C ou nt y
A D
C K itc he n- A dm in
W at er H ea te r R ep la ce m en t
� 'DWH RHYLVLRQ
181�(�56���S��0XUUD\��8T�841�7�_��8�1��53��3148
LQIR#UHVROXWJURXS�FRP�_�UHVROXWJURXS�FRP
PURMHFW���
P0��S$1*�TR821*
25�8�8
L
IC
EN
SE
D P
ROFESS I ONAL ENG
IN
E
ER
14275529
S TAT E O F U TAH
SANG TRUONG
No.
�5�21�2�26
ENLARGED
ELECTRICAL
PLANS
E403
K(<12T(S
*(1(R$/�12T(S
$� (C�SH$//�C22R',1$T(�:,TH�$//�2TH(R�TR$'(S
'8R,1*�'(02/,T,21�$1'�C21STR8CT,21�T2
)$C,/,T$T(�T,0(/<�:2RK�
%� $//�$R($S�$R(�T2�%(�K(PT�C/($1�$1'�C/($R�2)
'(%R,S�$T�$//�T,0(S�
C� C21TR$CT2R�SH$//�P$TCH�$1'�R(P$,R�$//�:$//S�
C(,/,1*S�(TC��T2�0$TCH�(X,ST,1*�C21',T,21S�
'� R28T(�$//�C21'8,T�,1�$�1($T�$1'�2R'(R/<�)$SH,21�
$//�C21'8,T�,1�),1,SH('�SP$C(S�SH$//�%(
C21C($/('�$%29(�C(,/,1*S�2R�,1�:$//S�81/(SS
2TH(R:,S(�,1',C$T('�21�TH(�P/$1S�
(� PR29,'(�C/($R��T<P('��P�T28CH�/$%(/S�21�TH(
C29(RP/$T(�2)�$//�R(C(PT$C/(S�,1',C$T,1*�TH(
P$1(/�$1'�C,RC8,T�180%(R�,TS�,S�T,('�T2�
)� PR29,'(�8P'$T('�T<P('�C,RC8,T�',R(CT2R<�:,TH
81,48(�C,RC8,T�'(SCR,PT,21S�P(R�1(C�4�8�4�)2R
P$1(/S�$))(CT('�%<�TH,S�PR2J(CT�
*� (C�T2�),(/'�9(R,)<�(X,ST,1*�/2C$T,21S�2)
(48,P0(1T�$1'�'(9,C(S�PR,2R�T2�:2RK�
1� (X,ST,1*�J�%2X�21�:$//�)((',1*�12�9�C,RC8,T�T2�(X,ST,1*
:$T(R�H($T(R��(C�SH$//�',SC211(CT�P2:(R�$1'
'(02/,SH�C,RC8,T�%$CK�T2�S28RC(�
2� (X,ST,1*�:$T(R�H($T(R�$1'�C21TR2/�%2X�T2�%(
'(02/,SH('�%<�0(CH$1,C$/�C21TR$CT2R��(C�SH$//
C22R',1$T(�T,0,1*�2)�P2:(R�'(02/,T,21�
3� (X,ST,1*�C,RC8,T�)R20�(X,ST,1*�P$1(/�T2�R(0$,1�$1'�%(
PR2T(CT('�
4� 1(:�H($T�(XCH$1*(R�PR29,'('�$1'�,1ST$//('�%<
0(CH$1,C$/�C21TR$CT2R��(C�SH$//�PR29,'(�1(:�12�9
C,RC8,T�T2�1(:�TH(R0$/�S:,TCH�$1'�TH(1�T2�1(:
C21TR2/�P$1(/�8S,1*��1�3�4´C��(C�SH$//�0$K(�$//�),1$/
C211(CT,21S�
5� T,(�T2�'(',C$T('�2�$��1P�C,RC8,T�,1�P$1(/�,1',C$T('�
6� (X,ST,1*�P80P�T2�%(�R(P/$C('��',SC211(CT�P2:(R�T2
(X,ST,1*�P80P�$1'�0$,1T$,1�,1T(*R,T<�2)�(X,ST,1*
C,RC8,T�)2R�1(:�P80P�
7� T,(�1(:�P80P�T2�(X,ST,1*�C,RC8,T�
8� PR29,'(�1(:�29(R/2$'�'(9,C(S�,1�ST$RT(R�$1'
',SC211(CT�T2�0((T�02T2R�0$18)$CT8R(R
S R(C200(1'$T,21S�
| AN Cover Page |
| RG Mech Cover Page -1 |
| RG Mech Cover Page -2 |
| P102 LEVEL 2 - OVERALL PLUMBING PLAN |
| P401 LARGE SCALE PLUMBING PLAN |
| P402 LARGE SCALE PLUMBING PLAN |
| P403 LARGE SCALE PLUMBING PLAN |
| P404 P404 LARGE SCALE PLUMBING PLAN |
| P501 PLUMBING SCHEDULES & DETAILS |
| RG Elec Cover Page |
| E002 ELECTRICAL DETAILS AND SCHEDULES |
| E403 ENLARGED ELECTRICAL PLANS |
File details come from the government source that posted it. Updated .