11-10- AMENDMENT 1 - FAC133242 ADC Heat Exchangers – Final Phase.pdf
PDF 132 KB Posted
- Solicitation number
- SLCo FAC133242 ADC Heat Exchangers – Final Phase- CONST
- Issued by
- Utah
About this file
This is an amendment document related to FAC133242 for Salt Lake County, Utah, concerning the replacement of heat exchangers at a county facility as part of the final phase of a construction project. The amendment modifies the original contract terms and specifications outlined in the Project Manual and Plans. The work involves the complete replacement of heat exchangers according to engineering specifications and construction documents previously established for this facility improvement initiative.
The amendment document adjusts contract conditions, pricing, or technical requirements from the original solicitation to reflect changes in project scope, budget, or implementation timelines. This final phase designation indicates that the heat exchanger replacement represents the concluding construction element of a larger facility improvement program. The amendment ensures that all bidders and the selected contractor operate under the most current and accurate project requirements and contractual obligations for completing this critical mechanical system upgrade.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 9/15/2026
Amendment Number 1
Project: General Contractors Request for Bids Issued by Salt Lake County
Project: FAC133242 ADC Heat Exchangers – Final Phase Project #: FAC133242 Closing date: 9/17/2026 This amendment represents clarifications and additions to the Request for Bids (RFB) and any of its respective parts. These changes are to be considered part of said documents as though they were included in the original documents. Any terms or conditions of said documents not modified by Amendment No. 1 shall remain unchanged.
1. Adding Addendum 1. See file Addendum 1- FAC133242. Please examine thoroughly.
a. Answers Contractor Questions.
b. Adds Prior Approval of Brands update.
c. Update to Drawings
End of Amendment Number 1
Amendment Number 1