11-10- AMENDMENT 1 - FAC133242 ADC Heat Exchangers – Final Phase.pdf

PDF 132 KB Posted

Attached to
SLCo FAC133242 ADC Heat Exchangers – Final Phase- CONST
Solicitation number
SLCo FAC133242 ADC Heat Exchangers – Final Phase- CONST
Issued by
Utah

About this file

This is an amendment document related to FAC133242 for Salt Lake County, Utah, concerning the replacement of heat exchangers at a county facility as part of the final phase of a construction project. The amendment modifies the original contract terms and specifications outlined in the Project Manual and Plans. The work involves the complete replacement of heat exchangers according to engineering specifications and construction documents previously established for this facility improvement initiative.

The amendment document adjusts contract conditions, pricing, or technical requirements from the original solicitation to reflect changes in project scope, budget, or implementation timelines. This final phase designation indicates that the heat exchanger replacement represents the concluding construction element of a larger facility improvement program. The amendment ensures that all bidders and the selected contractor operate under the most current and accurate project requirements and contractual obligations for completing this critical mechanical system upgrade.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 9/15/2026

Amendment Number 1

Project: General Contractors Request for Bids Issued by Salt Lake County

Project: FAC133242 ADC Heat Exchangers – Final Phase Project #: FAC133242 Closing date: 9/17/2026 This amendment represents clarifications and additions to the Request for Bids (RFB) and any of its respective parts. These changes are to be considered part of said documents as though they were included in the original documents. Any terms or conditions of said documents not modified by Amendment No. 1 shall remain unchanged.

1. Adding Addendum 1. See file Addendum 1- FAC133242. Please examine thoroughly.

a. Answers Contractor Questions.

b. Adds Prior Approval of Brands update.

c. Update to Drawings

End of Amendment Number 1

Amendment Number 1

File details come from the government source that posted it. Updated .