Attach 8_Asbestos Report-Building 24.pdf
PDF 10 MB Posted
- Attached to
- BUILDING 24 DISPATCH REMODEL Federal contract opportunity
- Solicitation number
- 1122499
- Issued by
- Department of Agriculture Forest Service
About this file
This document appears to be an Asbestos Report for Building 24, related to a federal contract opportunity for the BUILDING 24 DISPATCH REMODEL project.
The project consists of remodeling specified areas of Building 24 at the Lolo National Forest Headquarters in Fort Missoula. The work includes remodeling the south wing on the upper floor to accommodate Missoula Dispatch, remodeling the front desk area, a single private office remodel in the north wing, minor exterior work such as gutters, and installing Linc Pass access control to all exterior doors. The solicitation number is 1122499 and the contracting agency is the Department of Agriculture Forest Service. No additional details on response dates, award dates, pricing terms, or set asides are provided in this document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A0004_Building 24 Dispatch Remodel.pdf | ||
| A0003_Building 24 Dispatch Remodel.pdf | ||
| A0002_Building 24 Dispatch Remodel.pdf | ||
| Attach 7_ADDENDUM 2 _Updates to Plans_Drawings_07242024.pdf | ||
| Attach 9_Demo Plan South Wing Sheets 2 and 6 of 11.pdf | ||
| Attach 14_Reception Area Remodel Sheets 1 - 3.pdf | ||
| Attach 12_E Sheets E1 - E8.pdf | ||
| Attach 13_M Demo Sheets M1 - M3.pdf | ||
| Attach 11_Demolition Plan Sheets 1-5.pdf | ||
| Attach 10_Demo Plan West Wing Sheets 1-11.pdf | ||
| A0001_Building 24 Dispatch Remodel_S.pdf | ||
| 1282B124R0054_BUILDING 24.pdf | ||
| Attch 5 - 100 Percent Construction Documents Volume 2 Specification.pdf | ||
| Attch 1 SOW.pdf | ||
| Attch 2 -Schedule of Items -SOI.xlsx | XLSX spreadsheet | |
| Attch 3- Plans_Drawings.pdf | ||
| Attch 4 - 100 Percent Construction Documents Volume 1 Specification.pdf | ||
| Attch 6 - Wage Determination.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number: IH 23-107 December 6, 2023
Abatement Contractors of Montana Specializes In:
Asbestos Abatement
Lead Based Paint Removal
Historical Renovation
General Construction & Remodel
Asbestos Inspections
Meth Lab Clean-up
Industrial Hygiene
Certification & Safety Training
Limited Inspection Report For Asbestos Containing Building Materials
Project Number:
IH 23-107
Subject Property:
USFS Building 24 Fort Missoula Rd.
Missoula, Montana 59804
Prepared For:
Mosaic 317 N. Cruse Ave.
Helena, Montana 59601
Prepared By:
Abatement Contractors of Montana
208 Commerce Street Missoula, Montana 59808
(406) 549-8489 www.acm-contracting.com
USFS Building 24 http://www.acm-contracting.com/
APPENDIX I ………………………...REPORT
APPENDIX II ………………………RESULTS
APPENDIX III …………………..DRAWINGS
APPENDIX IV …………….PHOTOGRAPHS
APPENDIX V ………………..CITY LETTER
APPENDIX I
REPORT
ABATEMENT CONTRACTORS OF MONTANA, LLC
208 Commerce St
Missoula, MT 59807 P 406-549-8489
F 406-728-9416
SPECIALTY CONSTRUCTION & ENVIRONMENTAL REMEDIATION SERVICES www.acm-contracting.com
January 2, 2024
Mosaic Attn: Matt Aune 317 N Cruiz Ave. Suite 201 Phone: (406) 459-6271 Helena, MT E-Mail: matta@mosaicarch.com
Subject: ACM Project Number IH-23-107 Limited Asbestos Inspection
USFS Building 24 Fort Missoula Rd.
Dear Mr. Aune:
Abatement Contractors of Montana, LLC (ACM) is pleased to provide this sampling report for a limited asbestos inspection conducted at the USFS Building 24 located at Fort Missoula Road in Missoula, Montana.
The asbestos inspection was performed on October 27 – December 19, 2023, by Brian Betts, MTA-1878, a Montana Department of Environmental Quality (DEQ)-accredited asbestos inspector. The results of this inspection can be found in the enclosed report.
INTRODUCTION
ACM collected a total of Two-Hundred-Eleven (211) bulk samples representing Sixty-Four (64) homogeneous areas (HA) of suspected asbestos-containing building materials (ACBM) in the concerned area(s) that will be impacted during the planned renovation within the subject property. Any materials found to contain greater than one percent (>1%) asbestos by weight are considered to be Asbestos Containing Building Materials (ACBM). This inspection considered all accessible areas of the building and ACM’s scope of work. This inspection was limited only to the materials that were readily accessible and only included those materials based on the information provided by the client during our site visit and/or phone conversations. All samples were collected from previously damaged or inconspicuous locations to help retain the aesthetics of the building for the occupants. Although ACM’s Inspector took every effort to evaluate all of the materials that will be impacted during the renovation, it is possible that other hidden materials may exist. Therefore, any materials that have not been discovered AND have not been specifically evaluated by bulk sampling in this inspection report must be tested and evaluated for asbestos content prior to disturbance of these materials. A complete list of all samples that were collected is located in Table 1.
The detailed laboratory results are presented in Appendix II. A diagram of the building indicating where samples were collected and a map showing where any asbestos containing materials are located is enclosed within Appendix III. Photographs of materials sampled and asbestos containing materials can be found in Appendix VI. The letter to the City of Missoula to obtain the necessary work permits can be found in Appendix V.
Some of the samples tested POSITIVE for asbestos. Positive samples are highlighted in BOLD in Table 1.
SCOPE OF INSPECTION
ACM was contracted by Mr. Aune of Mosaic to conduct a limited asbestos inspection for the planned renovation of the interior of Building 24 at fort Missoula in Missoula Montana.
INSPECTION
http://www.acm-contracting.com/
Inspection Number IH-23-107 Page 2 of 17 December 21, 2023
The limited asbestos inspection was performed in accordance with Occupational Safety and Health Administration 29 Code of Federal Regulations (CFR) 1926.1101(k), the Montana DEQ Administrative Rules of Montana (ARM) 17.74.354 and National Emission Standards for Hazardous Air Pollutants (NESHAP) 40 CFR 61, Subparts A and M, and applicable portions of the currently recognized standard protocol developed for schools under the Asbestos Hazard Emergency Response Act (AHERA) and as promulgated in Title 40, Code of Federal Regulations (40 CFR), Part 763 and as amended in the Federal Register. The SanAir Technologies Laboratory Analysis Report are enclosed for reference.
Representative bulk material samples were collected from the suspect asbestos-containing surfacing (S) materials, thermal system insulation (TSI) materials and miscellaneous (M) materials from each of the assigned homogeneous areas (HAs) that will be impacted at the time of the renovation. The suspect ACBM were visually identified and touched to assess friability prior to sampling. The samples were placed in HA groups using a coding method to classify each suspect ACBM by type, texture, color, era of installation and location. The asbestos inspection included:
Identification of HA suspect ACBM on an area-by-area basis within ACM’s scope of work;
Bulk samples were collected in discrete or previously damaged locations when possible;
Collection and analysis of bulk samples to confirm or deny the presence of asbestos.
Positive Stop methods were utilized in the laboratory analysis
Roofing materials were not sampled during this inspection to avoid any possible leaks and voidance of the roofs warranty
Vermiculite Insulation was assumed to be an asbestos containing material
Fire Doors were assumed to contain asbestos containing material
No other materials were presumed to be asbestos containing materials
Bulk samples were not collected from any materials that are made of 100% metal, wood, foam, glass or rubber.
Vermiculite is present in the attic and also sporadically distributed on top of 2nd floor 2x4 ceiling tiles and 2x4 light fixtures. Ceiling tiles should not be moved/disturbed on the 2nd floor. Due to the nature of Vermiculite and the uncertainties in the variations with testing techniques, it has been assumed that this material contains asbestos. Removal of this material should be accomplished by an accredited abatement contractor who will properly remove the material, containerize it in the recommended containers and dispose of at a certified landfill.
Pipe Insulation (MAG) Sample # AB 182-184 were sampled from debris West of South attic access, the same insulation is present on one pipe approx. 8ft West of attic access encased in wall. Review of previous inspection report dated in 1994 shows this pipe and two pipes encased in wall near North attic access, North Pipes were not located but must be assumed to be still present. Pipe insulation may also be present in other areas such as pipe chases, walls, above ceiling tile.
Floor Tile & mastic multiple samples were positive for asbestos. Entire 2nd floor, North and West Wing of 1st floor, South wing E half basement. This building was occupied at the time of inspection with the inspector taken samples in discreet areas, and as not to cause trip hazards. Additional verifications/ quantities of tile& mastics should be performed prior to remodel. All infilled walls appear to be over tile, also exterior added walls, bottom wall plates should not be removed by general contractor, if walls are to be removed, Ceramic tiles, floor and walls in basement restrooms were not tested.
Vibration Dampeners sample # AB 188-190 cloth dampeners on old Exhaust fan ducting in attic north and south wings, neither of the two fans on the duct work were in operation when the inspector was in the attic.
Mastic/ Roofing tar Sample # AB 200-202 Roofing tar that has dripped from the duct roof penetration.
The inspector believes he witnessed the reroofing of building 24 and adjacent building 26 in approx. 2012.
The tar appears to be the original, and it appears now to have a self-adhesive flashing paper round the duct work under the roof tiles.
Inspection Number IH-23-107 Page 3 of 17 December 21, 2023
Fire Doors assumed to contain Asbestos, further investigation May be needed (if the door contains asbestos it is not visible).
Gaskets inspection performed on May 18th 2023 ,ACM 23-046 Showed that boiler room Breaching gaskets (2 EA) contain 80% C Asbestos.
Roofing materials were not sampled during this inspection. These roofing materials can be sampled at a later date under a separate contract when the assistance of the Client’s roofing contractor is available to repair the sample locations to avoid leaks and/or voidance of the current warranty.
A minimum of three (3) suspect ACBM samples were collected from random locations within the subject area. Selected suspect ACBM were limited to HA that will be impacted at the time of the renovation. When possible, suspect ACBM samples were collected from existing damaged areas. These samples were placed in pre-labeled plastic containers for shipment to the laboratory. Although every attempt was made to identify and sample suspect ACBM within ACM’s scope of services, any materials that have not been specifically evaluated by bulk sampling in this inspection must be tested prior to disturbance of these materials.
The samples were shipped, under chain-of-custody protocol for standard analyses, to SanAir Technologies Laboratory (NVLAP Lab # 200870-0) in Pawhatan, Virginia for bulk sample analysis utilizing Polarized Light Microscopy (PLM) coupled with dispersion staining for asbestos identification. The ‘Positive Stop’ method was utilized in the laboratory analysis where if a sample from a single homogenous area, asbestos is present, the rest of the samples for that homogenous area are not analyzed. However, if the sample analysis does not indicate that asbestos is present, the laboratory will continue to analyze the rest of the samples for that homogenous area. The detailed laboratory results are presented in Appendix II.
Materials in the following table that are highlighted in BOLD were found to be asbestos containing.
Table 1. Suspect ACBM that were identified, collected, shipped and analyzed at the laboratory.
Sample Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-01 M-1
12x12 Vinyl
Tile Off White with
Black Dots, Mastic Yellow
Basement Lunchroom
ND N/A N/A N/A AB-02 Basement Room 120
AB-03 Basement Lunchroom
AB-04
M-2
Carpet Green and Tan
Speckled, Mastic Yellow
Basement Lunchroom
ND N/A N/A N/A AB-05 Basement Hall by Room 105
AB-06 Basement Hall by Room 123
AB-07
M-3
Carpet Light Green, Basement Room 105 Good
CAT I ~1600 SF
Removal by an
Accredited
Inspection Number IH-23-107 Page 4 of 17 December 21, 2023
Sample Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-08
Mastic
Basement Room 127 3% C Mastic
Non- Friable
Abatement Contractor
Prior to Demolition Renovation
AB-09 Basement Room 128
AB-10
M-4 Cove Base
Tan, Mastic
Tan
Basement Lunchroom
ND N/A N/A N/A AB-11 Basement Storage Room
AB-12 Basement Room 120
AB-13
M-5 Carpet Gray, Mastic Yellow
South Wing in Basement
ND N/A N/A N/A AB-14 South Wing in Basement
AB-15 South Wing in Basement
AB-16
M-6 Carpet Tan, Mastic Yellow
South Wing Basement
ND N/A N/A N/A AB-17 South Wing Basement
AB-18 South Wing Basement
AB-19 M-7
Vinyl Floor
Tile Tan, Mastic Yellow
Under MS and M6 in Basement
2% C Vinyl Floor
Good
CAT I
Non-
Friable
~2016 SF
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-20
Under MS and M6 in
Basement
AB-21
Under MS and M6 in
Basement
AB-22
Ceiling Tile, Large Fissure
(Wide) 2x2
South Wing Basement
ND N/A N/A N/A AB-23 South Wing Basement
AB-24 South Wing Basement
Inspection Number IH-23-107 Page 5 of 17 December 21, 2023
Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-25
M-9 Ceiling Tile 2x4
Pinholes No Fissures
Basement IT Room South Wing
ND
N/A
N/A N/A AB-26
Basement IT Room South
Wing
AB-27
Basement IT Room South
Wing
AB-28
M-10 Carpet
Squares Mastic
Floor fFill
1st Floor North Wing Over Ceramic
N/A AB-29
1st Floor North Wing Under Ceramic
AB-30
1st Floor North Wing Under
Ceramic
AB-31
M-11 Ceramic Tile
6x6 Red
Under M-10
ND N/A N/A N/A AB-32 Under M-10
AB-33 Under M-10
AB-34
M-12 Grout Gray
N/A N/A AB-35 Under M-10
AB-36 Under M-10
AB-37
M-13 Mortar/
Concrete
N/A N/A N/A AB-38 Under M-10
AB-39 Under M-10
AB-40 M-14
Carpet Blue
Mastic Yellow
North Wing Over M-11, M- 12, M-13
ND N/A N/A N/A
AB-41
North Wing Over M-11, M-
12, M-13
Inspection Number IH-23-107 Page 6 of 17 December 21, 2023
Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-42
North Wing Over M-11, M-
12, M-13
AB-43
M-15 Carpet Tan
Mastic yellow
1st Floor North Wing
N/A N/A AB-44 1st Floor North Wing
AB-45 1st Floor North Wing
AB-46
M-16 Floor Tile tan
Mastic Black
Under M-15 3% C
Floor Tile
2% Mastic Black
Good
CAT I
NON-
Friable
~3,256SF
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-47 Under M-15
AB-48 Under M-15
AB-49
M-17
Carpet Mastic Yellow Vinyl Floor
Tile Tan
Mastic Black Fiberboard
1st floor North Wing 3% C
Floor tile
< 1% C black
Good
CAT I
Non-
Friable
Quantity included
With M-16
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-50 1st Floor North Wing
AB-51 1st Floor North Wing
AB-52
M-18
Carpet Square Blue
Mastic Yellow Mastic Black?
on Fiberboard
1st Floor North Wing
2% C Mastic black
Good
CAT I
Non-
Friable
Quantity included
With M-16
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-53 1st Floor North Wing
AB-54 1st Floor North Wing
AB-55
M-19
Carpet Tan Mastic Yellow Vinyl Floor
Tile White
Mastic Black on Fiberboard
1st floor North Wing to West Wing 3% C
Floor tile
2% C
Black
Good
CAT I
Non-
Friable
Quantity included
M-16
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-56
1st Floor North Wing to
West Wing
AB-57
1st Floor North Wing to
West Wing
AB-58
M-20
Cove Base Brown
1st floor North Wing to West Wing Office
ND N/A N/A N/A
Inspection Number IH-23-107 Page 7 of 17 December 21, 2023
Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-59
Mastic Brown
1st Floor North Wing to West Wing Office
AB-60
1st Floor North Wing to West
Wing Office
AB-61
M-21
Carpet Squares
Blue Mastic Clear, Yellow Vinyl Floor
Tile White Mastic
Black
West Wing Hall 3% C
Floor tile
2% C Mastic Black
Good
CAT I
Non-
Friable
~2,422SF
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-62 West Wing Office
AB-63 West Wing Office
AB-64
M-22 Fiberboard
Mastic?
West Wing Under M-21
2% C Mastic Black
Good
CAT I
Non-
Friable
~2,422SF
Assumed On fir tongue
Groove
Floor
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-65 West Wing Under M-21
AB-66 West Wing Under M-21
AB-67
M-23
Carpet Green
Mastic Yellow Wood
Mastic Black?
Reception
ND N/A N/A N/A AB-68 Reception
AB-69 Reception
AB-70
M-24 Carpet
Squares 12x12
Reception entry E
ND N/A N/A N/A AB-71 Reception entry W
AB-72 Reception Entry W
AB-73
M-25
Carpet Grey Diamond
Pattern, Mastic Yellow, Fiberboard, Black Mastic?, Wood
South Wing
ND N/A N/A N/A AB-74 South Wing
AB-75 South Wing
Inspection Number IH-23-107 Page 8 of 17 December 21, 2023
Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-76
M-26
Cove Base White, Mastic
Closet South Wing
ND N/A N/A
AB-77 Men’s Restroom South Wing
AB-78
Women’s Restroom South
Wing
AB-79
M-27
2x4 Ceiling Tile Fat Fissure, Pinhole
South Wing
AB-80 South Wing
AB-81 South Wing
AB-82
M-28
2x4 Ceiling Tile Pinhole No
Fissure
Basement South Side
AB-83 Basement South Side
AB-84 Basement South Side
AB-85
M-29
Ceiling Tile Medium Fissure
West Wing
N/A N/A N/A AB-86 West Wing
AB-87 West Wing
AB-88
M-30
Seam Sealant
HVAC
South Wing
N/A N/A AB-89 West Wing
AB-90 North Wing
AB-91
M-31
Vinyl Sheet Flooring
Off White, South Wing Custodian
ND N/A N/A N/A
AB-92 Men’s Room
Inspection Number IH-23-107 Page 9 of 17 December 21, 2023
Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-93
Mastic Yellow Men’s Room
AB-94 M-32
Carpet Tan, Mastic Yellow, Gypcrete
South Wing East End
ND N/A N/A N/A AB-95 South Wing East End
AB-96 South Wing East End
AB-97 M-33
Carpet Blue, Mastic Yellow, Black on Concrete
South Wing Stair to Basement
ND N/A N/A N/A AB-98
South Wing Door to mechanical (No Black Mastic on Ceramic Tile)
AB-99
South Wing Office (No Black
Mastic- Floor Fill Grey)
AB-100 M-34
Carpet Blue, Mastic Yellow, Fiberboard, Wood
Hall
ND N/A N/A N/A AB-101 Hall
AB-102
Hall (With Paper Under
Wood)
AB-103
M-35
Carpet Grey, Mastic Yellow
South Wing Staircase (Landing with Concrete)
ND N/A N/A N/A AB-104
South Wing Staircase (Stairs on Wood)
AB-105
South Wing Staircase (Stairs on Wood)
AB-106 M-36
Carpet (Blue, Brown, Tan Dots), Mastic Yellow, Vinyl Floor
Second Floor North Wing 4% C Floor Tile
2% C Mastic Black
Good
CAT I
Non-
Friable
~14,166
SF
Removal by an
Accredited Abatement Contractor
Prior to Demolition
AB-107 Closet
Inspection Number IH-23-107 Page 10 of 17 December 21, 2023
Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-108
Tile, Black Mastic, Fiberboard Hall
AB-109
M-37
Carpet Tan, Yellow, Vinyl Floor Tile, Mastic Black, Fiberboard, Mastic?
Conference Storage Room
3% C Floor Tile
2% C Mastic Black
Good
CAT I
Non-
Friable
Quantity included
M-36
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-110 Conference Storage Room
AB-111
Conference Room Entry
(Carpet Blue)
AB-112
M-38
6 Inch Cove Base Dark
Brown, Mastic Yellow
Second Floor North Wing Curve Wall
ND N/A N/A N/A AB-113
Second Floor North Wing
Curve Wall
AB-114
Second Floor North Wing
Curve Wall
AB-115
M-39
4 Inch Cove Base Brown, Mastic Brown
Storage Room North Wing (Attic Access)
ND N/A N/A N/A AB-116
Storage Room North Wing
(Attic Access)
AB-117
Storage Room North Wing (Attic Access)
AB-118
M-40
9x9 Vinyl Floor Tile, Mastic Black
Storage Room North Wing (Attic Access)
3% C Floor Tile
2% C Mastic Black
Good
CAT I
Non-
Friable
Quantity included
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-119
Storage Room North Wing
(Attic Access)
AB-120
Storage Room North Wing
(Attic Access)
AB-121
M-41
Carpet Tan, Mastic Yellow, White Vinyl Floor Tile, Mastic Black
Second Floor North Wing 2% C Vinyl Floor
Tile
6% C
Black
Good
CAT I
Non-
Friable
Quantity included
Accredited Abatement Contractor
Prior to
AB-122
Second Floor North Wing
(With Fiberboard)
AB-123
Second Floor North Wing
(Closet)
Inspection Number IH-23-107 Page 11 of 17 December 21, 2023
Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-124
M-42
Carpet
Gray Diamond Mastic Yellow Vinyl Floor Tile Mastic Black Fiberboard
2nd Floor W. Wing
ND N/A N/A N/A AB-125 2nd Floor W. Wing
AB-126 2nd Floor W. Wing
AB-127
M-43
Carpet Square
Blue Mastic Yellow Vinyl Floor
Tile White, Green
Stripes Mastic Black Fiberboard
2nd Floor S. Wing
2% C Vinyl Floor
Tile
Good
CAT I
Non-
Friable
Quantity included
Accredited Abatement Contractor
Prior to
AB-128 2nd Floor S. Wing
AB-129 2nd Floor S. Wing
AB-130
M-44
Carpet Blue, Tan, Maroon Mastic Yellow
Vinyl Floor Tile
Rose Mastic
Floor Fill
2nd Floor S. Wing
2% C Vinyl Floor
Tile
Good
CAT I
Non-
Friable
Quantity included
Accredited Abatement Contractor
Prior to
AB-131 2nd Floor S. Wing
AB-132 2nd Floor S. Wing
AB-133
M-45
Glazing Gray
Window 2nd Floor S. Wing
<1% C glazing
N/A N/A Follow
OSHA
Regulations AB-134 Window 2nd Floor W. Wing
AB-135 Window 2nd Floor N. Wing
AB-136
S-1 Drywall
Mud Tape
2nd Floor S. Wing E. End
ND N/A N/A N/A AB-137 2nd Floor S. Wing E. End
AB-138 2nd Floor S. Wing E. End
AB-139
S-2
Drywall Mud
2nd Floor S. Wing W. End ND
Inspection Number IH-23-107 Page 12 of 17 December 21, 2023
Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-140
Tape
2nd Floor S. Wing W. End
AB-141 2nd Floor S. Wing W. End
AB-142
S-3 Drywall
Mud Tape
2nd Floor W. Wing
N/A AB-143 2nd Floor W. Wing
AB-144 2nd Floor W. Wing
AB-145
S-4 Drywall
Mud Tape
2nd Floor N. Wing E. End
ND N/A
N/A AB-146 2nd Floor N. Wing E. End
AB-147 2nd Floor N. Wing E. End
AB-148
S-5 Drywall
Mud Tape
Smooth
2nd Floor N. Wing (Hardlid Area)
ND N/A N/A N/A AB-149
2nd Floor N. Wing (Hardlid
Area)
AB-150
2nd Floor N. Wing (Hardlid
Area)
AB-151
S-6 Drywall
Mud Tape
Smooth
2nd Floor N. Wing W. End
ND N/A N/A N/A AB-152 2nd Floor N. Wing W. End
AB-153 2nd Floor N. Wing W. End
AB-154
S-7
Plaster Gray
Skim Coat White
2nd Floor S. Wing
ND N/A N/A N/A AB-155 2nd Floor S. Wing
AB-156 1st Floor N. Wing
Inspection Number IH-23-107 Page 13 of 17 December 21, 2023
Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-157 1st floor N. Wing
AB-158 Basement N. Wing
AB-159 Basement S. Wing
AB-160 Boiler room
AB-161
S-8
Drywall, Mud, Tape
1st Floor S. Wing E. End
AB-162 1st Floor S. Wing E. End
AB-163 1st Floor S. Wing E. End
AB-164
S-9
1st Floor S. Wing
N/A N/A N/A AB-165 1st Floor S. Wing
AB-166 Men’s Restroom
AB-167
S-10
1st Floor W. Wing
N/A N/A N/A AB-168 1st Floor W. Wing
AB-169 1st Floor W. Wing
AB-170
S-11
1st Floor N. Wing
N/A N/A
AB-171 1st Floor N. Wing
AB-172 1st Floor N. Wing
AB-173
S-12
Basement W. Wing ND N/A
Inspection Number IH-23-107 Page 14 of 17 December 21, 2023
Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-174
Tape
Basement W. Wing
AB-175 Basement W. Wing
AB-176
S-13
Drywall, Mud, Tape
Basement W. Wing
ND N/A N/A N/A AB-177 Basement W. Wing
AB-178 Basement W. Wing
AB-179
S-14
Drywall, Mud, Tape
Basement N. Wing
ND N/A N/A N/A AB-180 Basement N. Wing
AB-181 Basement N. Wing
AB-182
TS1-1
Insulation Pipe Debris
(Mag)
South Attic (N. of Access)
20% A 2% C
Poor
RACM
Friable
Uknown Pipe chases Encased in walls
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-183 South Attic (N. of Access)
AB-184 South Attic (N. of Access)
AB-185
TS1-2
Insulation Pipe Fiberglass, (Newer) Paper, paint
Attic
ND N/A N/A N/A AB-186 Attic
AB-187 Attic
AB-188
M-46
Cloth Vibration
Dampener
South Attic (West of Access)
(also in West attic)
20% C Cloth
Good
CAT I
Non-
Friable
~12 SF
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-189
South Attic (West of
Access)
AB-190
South Attic (West of
Access)
Inspection Number IH-23-107 Page 15 of 17 December 21, 2023
Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-191
M-47
Insulation Foil Faced
Attic
ND N/A N/A N/A AB-192 Attic
AB-193 Attic
AB-194
M-48
Insulation Black Paper
Faced
Attic
ND N/A N/A N/A AB-195 Attic
AB-196 Attic
AB-197
M-50 Insulation Fiberglass Tan paper faced
Attic
AB-198 Attic
AB-199 Attic
AB-200
M-50 Sealant
(tar) black
Attic Duct work penetrating roof (dripped down from exterior sealing)
8% C Tar
Sealant
Good
CAT I
Non-
Friable
~10 SF
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-201
Attic Duct work penetrating roof (dripped down from exterior sealing)
AB-202
Attic Duct work penetrating roof (dripped down from exterior sealing)
AB-203
TSI-3
Insulation
Paper wrapped Black mastic fiberglass
Interstitial space between 1st and 2nd floor
ND N/A N/A N/A AB-204
Interstitial space between 1st and 2nd floor
AB-205
Interstitial space between 1st and 2nd floor
AB-206
TSI-4
Insulation Cloth rapped
Interstitial space between 1st and 2nd floor
Inspection Number IH-23-107 Page 16 of 17 December 21, 2023
Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-207
fiberglass
Interstitial space between 1st and 2nd floor
AB-208
Interstitial space between 1st and 2nd floor
AB-209
TSI-5
Mudded
Pipe insulation elbow
Interstitial space between 1st and 2nd floor
AB-210
Interstitial space between 1st and 2nd floor
AB-211
Interstitial space between 1st and 2nd floor
Vermiculite Attic and on top of 2nd floor ceiling tiles
Assumed Not tested as per EPA Guidelines
Friable
RACM
~14,166
SF
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
Firedoors Throughout Assumed Not tested
Friable
RACM
Uknown
Removal by an
Accredited Abatement Contractor
Prior to Demolition
10-12
Gasket Breaching Sampled 5-18-2023
ACM IH 23-
Boiler room Breaching 80% C Gasket
Good
CAT I
Non-
Friable
2EA
8 LF
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
LEGEND
ND None Detected N/A Not Applicable LF Linear Feet SF Square Feet EA Each S Surfacing Material M Miscellaneous TSI Thermal System Insulation C Chrysotile A Amosite RACM Regulated Asbestos Containing Material
Our inspection has revealed the presence of ACM at the subject property. This inspection was limited to the materials which will be impacted at the time of renovation and may not have located any potentially hidden ACBM within the subject property. However, we have taken every effort to sample all obvious and accessible suspect materials within the scope of this inspection. Most of these materials appeared to be in a good condition at the time of our inspection.
ACM recommends that any materials highlighted in BOLD in Table 1 above shall be removed by an accredited abatement contractor prior to disturbance of these materials. These materials should be handled, Inspection Number IH-23-107 Page 17 of 17 December 21, 2023 containerized and disposed of according to State and Federal Regulations. Quantities of the above mentioned materials are estimates only. The abatement contractor should verify all quantities prior to bidding work.
Limitations
This asbestos inspection summary was prepared based on information gathered during our site visit, phone conversations and interpretations of laboratory results of bulk samples collected during the inspection. The inspection was limited to accessible areas within the structure. All samples were collected from previously damaged or inconspicuous locations to help retain the aesthetics of the building for the occupants. Although ACM’s Inspector took every effort to evaluate all of the materials that will be impacted during the renovation, it is possible that other hidden materials may exist. Therefore, any materials that have not been discovered AND have not been specifically evaluated by bulk sampling in this inspection report must be tested and evaluated for asbestos content prior to disturbance of these materials. Additional sampling may be required if additional HA’s are exposed during material removal, or the scope of work is expanded to include HA’s that have not been inspected or analyzed for asbestos content.
Any ACBM that might be impacted during renovation activities must be addressed prior to start of such activities by a qualified and accredited abatement company.
Abatement Contractors of Montana (ACM) greatly appreciates this opportunity to assist Mosaic and look forward to providing our services to you on future projects. If you have any questions regarding this sampling report, please call us at 406-549-8489. We look forward to working with you in the future.
Sincerely, Brian Betts
Montana DEQ-Accredited Asbestos Inspector: MTA-1878
Enclosures:
SanAir Technologies Laboratory Analysis Report Sample Location Diagrams Positive ACBM Location Diagrams Photographs City Permit Letter
APPENDIX II
ANALYTICAL RESULTS
SanAir ID#: 23068520
Project #: IH23-107 Project Name: USFS Bldg. 24 Report Date: 12/21/2023
Analysis Report prepared for Abatement Contractors of Montana, LLC
Dear Brian Betts, We at SanAir would like to thank you for the work you recently submitted. The 48 sample(s) were received on Thursday, December 14, 2023 via UPS. The final report(s) is enclosed for the following sample(s): AB-01, AB-02, AB-03, AB-04, AB-05, AB-06, AB-07, AB-08, AB-09, AB-10, AB-11, AB-12, AB-13, AB-14, AB-15, AB-16, AB-17, AB-18, AB-19, AB-20, AB-21, AB-22, AB-23, AB-24, AB-25, AB-26, AB-27, AB-28, AB-29, AB-30, AB-31, AB-32, AB-33, AB-34, AB-35, AB-36, AB-37, AB-38, AB-39, AB-40, AB-41, AB-42, AB-43, AB-44, AB-45, AB-46, AB-47, AB-48.
These results only pertain to this job and should not be used in the interpretation of any other job. This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report.
Sincerely, Maureen Y. Haley Asbestos Laboratory Manager SanAir Technologies Laboratory
Final Report Includes:
- Cover Letter
- Analysis Pages
- Disclaimers and Additional Information
Sample conditions:
- 48 samples in Good condition.
11709 Chesterdale Rd., Cincinnati, OH 45246 | 513.438.6006 | Fax: 804.897.1177 | www.SanAir.com | IAQ@SanAir.com
IH23-107Project Number:
P.O. Number:
Project Name: USFS Bldg. 24
10/27/2023Collected Date:
12/14/2023 12:00:00 PMReceived Date:
12/21/2023 5:26:48 PM
23068520 SanAir ID Number
FINAL REPORT
Abatement Contractors of Montana, LLCName:
Address: 208 Commerce St.
Missoula, MT 59808
406-549-8489Phone:
Analyst: Farnsworth-Pinkerton, Shoshauna
Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
AB-01 / 23068520-001
Vinyl Floor Tile 12x12 Mastic Basement Lunch Rm., Floor Tile
Off-White Non-Fibrous
Homogeneous
100% Other None Detected
AB-01 / 23068520-001
Vinyl Floor Tile 12x12 Mastic Basement Lunch Rm., Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-02 / 23068520-002
Vinyl Floor Tile 12x12 Mastic Basement Rm 120, Floor Tile
Off-White Non-Fibrous
Homogeneous
100% Other None Detected
AB-02 / 23068520-002
Vinyl Floor Tile 12x12 Mastic Basement Rm 120, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-03 / 23068520-003
Vinyl Floor Tile 12x12 Mastic Basement Lunch Rm., Floor Tile
Off-White Non-Fibrous
Homogeneous
100% Other None Detected
AB-03 / 23068520-003
Vinyl Floor Tile 12x12 Mastic Basement Lunch Rm., Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-04 / 23068520-004
Carpet Mastic Basement Lunch Rm., Carpet
Various Fibrous
Homogeneous
80% Synthetic 20% Other None Detected
AB-04 / 23068520-004
Carpet Mastic Basement Lunch Rm., Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-05 / 23068520-005
Carpet Mastic Basement Hall By Rm. 105, Carpet
Various Fibrous
Homogeneous
80% Synthetic 20% Other None Detected
AB-05 / 23068520-005
Carpet Mastic Basement Hall By Rm. 105, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
Analyst:
Analysis Date: 12/21/2023 Date: 12/21/2023
Approved Signatory:
IH23-107Project Number:
P.O. Number:
Project Name: USFS Bldg. 24
10/27/2023Collected Date:
12/14/2023 12:00:00 PMReceived Date:
12/21/2023 5:26:48 PM
23068520 SanAir ID Number
FINAL REPORT
Abatement Contractors of Montana, LLCName:
Address: 208 Commerce St.
Missoula, MT 59808
Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
AB-06 / 23068520-006
Carpet Mastic Basement Hall 123, Carpet
Various Fibrous
Homogeneous
80% Synthetic 20% Other None Detected
AB-06 / 23068520-006
Carpet Mastic Basement Hall 123, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-07 / 23068520-007
Carpet Basement Rm 105, Carpet
Green Fibrous
Homogeneous
80% Synthetic 20% Other None Detected
AB-07 / 23068520-007
Carpet Basement Rm 105, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-08 / 23068520-008
Carpet Basement Rm 127, Carpet
Green Fibrous
Homogeneous
80% Synthetic 20% Other None Detected
AB-08 / 23068520-008
Carpet Basement Rm 127, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-09 / 23068520-009
Carpet Basement Rm 128, Carpet
Green Fibrous
Homogeneous
80% Synthetic 20% Other None Detected
AB-09 / 23068520-009
Carpet Basement Rm 128, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-09 / 23068520-009
Carpet Basement Rm 128, Mastic
Black Non-Fibrous
Homogeneous
97% Other 3% Chrysotile
AB-10 / 23068520-010
Cove Base, Mastic Basement Lunch Room, Cove Base
Tan Non-Fibrous
Homogeneous
100% Other None Detected
Analyst:
Analysis Date: 12/21/2023 Date: 12/21/2023
Approved Signatory:
11709 Chesterdale Rd., Cincinnati, OH 45246 | 513.438.6006 | Fax: 804.897.1177 | www.SanAir.com | IAQ@SanAir.com
IH23-107Project Number:
P.O. Number:
Project Name: USFS Bldg. 24
10/27/2023Collected Date:
12/14/2023 12:00:00 PMReceived Date:
12/21/2023 5:26:48 PM
23068520 SanAir ID Number
FINAL REPORT
Abatement Contractors of Montana, LLCName:
Address: 208 Commerce St.
Missoula, MT 59808
Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
AB-10 / 23068520-010
Cove Base, Mastic Basement Lunch Room, Mastic
Tan Non-Fibrous
Homogeneous
100% Other None Detected
AB-11 / 23068520-011
Cove Base, Mastic Basement Storage Room, Cove Base
Tan Non-Fibrous
Homogeneous
100% Other None Detected
AB-11 / 23068520-011
Cove Base, Mastic Basement Storage Room, Mastic
Tan Non-Fibrous
Homogeneous
100% Other None Detected
AB-12 / 23068520-012
Cove Base, Mastic Basement Rm 120, Cove Base
Tan Non-Fibrous
Homogeneous
100% Other None Detected
AB-12 / 23068520-012
Cove Base, Mastic Basement Rm 120, Mastic
Tan Non-Fibrous
Homogeneous
100% Other None Detected
AB-13 / 23068520-013
Carpet, Mastic South Wing Basement, Carpet
Gray Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
AB-13 / 23068520-013
Carpet, Mastic South Wing Basement, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-14 / 23068520-014
Carpet, Mastic South Wing Basement, Carpet
Gray Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
AB-14 / 23068520-014
Carpet, Mastic South Wing Basement, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-15 / 23068520-015
Carpet, Mastic South Wing Basement, Carpet
Gray Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
Analyst:
Analysis Date: 12/21/2023 Date: 12/21/2023
Approved Signatory:
11709 Chesterdale Rd., Cincinnati, OH 45246 | 513.438.6006 | Fax: 804.897.1177 | www.SanAir.com | IAQ@SanAir.com
IH23-107Project Number:
P.O. Number:
Project Name: USFS Bldg. 24
10/27/2023Collected Date:
12/14/2023 12:00:00 PMReceived Date:
12/21/2023 5:26:48 PM
23068520 SanAir ID Number
FINAL REPORT
Abatement Contractors of Montana, LLCName:
Address: 208 Commerce St.
Missoula, MT 59808
Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
AB-15 / 23068520-015
Carpet, Mastic South Wing Basement, Mastic
White Non-Fibrous
Homogeneous
100% Other None Detected
AB-16 / 23068520-016
Carpet, Mastic South Wing Basement, Carpet
Tan Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
AB-16 / 23068520-016
Carpet, Mastic South Wing Basement, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-17 / 23068520-017
Carpet, Mastic South Wing Basement, Carpet
Tan Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
AB-17 / 23068520-017
Carpet, Mastic South Wing Basement, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-18 / 23068520-018
Carpet, Mastic South Wing Basement, Carpet
Tan Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
AB-18 / 23068520-018
Carpet, Mastic South Wing Basement, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-19 / 23068520-019
Vinyl Floor Tile, Mastic Under M5 + M6 Basement, Floor Tile
Tan Non-Fibrous
Homogeneous
98% Other 2% Chrysotile
AB-19 / 23068520-019
Vinyl Floor Tile, Mastic Under M5 + M6 Basement, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-20 / 23068520-020
Vinyl Floor Tile, Mastic Under M5 + M6 Basement, Floor Tile
Not Analyzed
Analyst:
Analysis Date: 12/21/2023 Date: 12/21/2023
Approved Signatory:
11709 Chesterdale Rd., Cincinnati, OH 45246 | 513.438.6006 | Fax: 804.897.1177 | www.SanAir.com | IAQ@SanAir.com
IH23-107Project Number:
P.O. Number:
Project Name: USFS Bldg. 24
10/27/2023Collected Date:
12/14/2023 12:00:00 PMReceived Date:
12/21/2023 5:26:48 PM
23068520 SanAir ID Number
FINAL REPORT
Abatement Contractors of Montana, LLCName:
Address: 208 Commerce St.
Missoula, MT 59808
Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
AB-20 / 23068520-020
Vinyl Floor Tile, Mastic Under M5 + M6 Basement, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-21 / 23068520-021
Vinyl Floor Tile, Mastic Under M5 + M6 Basement, Floor Tile
Not Analyzed
AB-21 / 23068520-021
Vinyl Floor Tile, Mastic Under M5 + M6 Basement, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-22 / 23068520-022
Ceiling Tile Large Fissure (Wide) 2x2 South Wing Basement
Tan Fibrous
Homogeneous
40% Cellulose 10% Glass
5% Min. Wool
45% Other None Detected
AB-23 / 23068520-023
Ceiling Tile Large Fissure (Wide) 2x2 South Wing Basement
Tan Fibrous
Homogeneous
40% Cellulose 10% Glass
5% Min. Wool
45% Other None Detected
AB-24 / 23068520-024
Ceiling Tile Large Fissure (Wide) 2x2 South Wing Basement
Tan Fibrous
Homogeneous
40% Cellulose 10% Glass
5% Min. Wool
45% Other None Detected
AB-25 / 23068520-025
Ceiling Tile 2x4 Small + Large Pinholes, No Fissures
Tan Fibrous
Homogeneous
40% Cellulose 15% Glass
45% Other None Detected
AB-26 / 23068520-026
Ceiling Tile 2x4 Small + Large Pinholes, No Fissures South
Tan Fibrous
Homogeneous
40% Cellulose 15% Glass
45% Other None Detected
AB-27 / 23068520-027
Ceiling Tile 2x4 Small + Large Pinholes, No Fissures South
Tan Fibrous
Homogeneous
40% Cellulose 15% Glass
45% Other None Detected
AB-28 / 23068520-028
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Carpet
Various Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
Analyst:
Analysis Date: 12/21/2023 Date: 12/21/2023
Approved Signatory:
11709 Chesterdale Rd., Cincinnati, OH 45246 | 513.438.6006 | Fax: 804.897.1177 | www.SanAir.com | IAQ@SanAir.com
IH23-107Project Number:
P.O. Number:
Project Name: USFS Bldg. 24
10/27/2023Collected Date:
12/14/2023 12:00:00 PMReceived Date:
12/21/2023 5:26:48 PM
23068520 SanAir ID Number
FINAL REPORT
Abatement Contractors of Montana, LLCName:
Address: 208 Commerce St.
Missoula, MT 59808
Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
AB-28 / 23068520-028
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-28 / 23068520-028
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Leveling Compound
Gray Non-Fibrous
Homogeneous
100% Other None Detected
AB-28 / 23068520-028
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Mastic
Tan Non-Fibrous
Homogeneous
100% Other None Detected
AB-28 / 23068520-028
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Leveling Compound
White Non-Fibrous
Homogeneous
100% Other None Detected
AB-29 / 23068520-029
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Carpet
Various Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
AB-29 / 23068520-029
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-29 / 23068520-029
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Leveling Compound
Gray Non-Fibrous
Homogeneous
100% Other None Detected
AB-29 / 23068520-029
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Mastic
Tan Non-Fibrous
Homogeneous
100% Other None Detected
AB-29 / 23068520-029
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Leveling Compound
White Non-Fibrous
Homogeneous
100% Other None Detected
Analyst:
Analysis Date: 12/21/2023 Date: 12/21/2023
Approved Signatory:
11709 Chesterdale Rd., Cincinnati, OH 45246 | 513.438.6006 | Fax: 804.897.1177 | www.SanAir.com | IAQ@SanAir.com
IH23-107Project Number:
P.O. Number:
Project Name: USFS Bldg. 24
10/27/2023Collected Date:
12/14/2023 12:00:00 PMReceived Date:
12/21/2023 5:26:48 PM
23068520 SanAir ID Number
FINAL REPORT
Abatement Contractors of Montana, LLCName:
Address: 208 Commerce St.
Missoula, MT 59808
Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
AB-30 / 23068520-030
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Carpet
Various Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
AB-30 / 23068520-030
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-30 / 23068520-030
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Leveling Compound
Gray Non-Fibrous
Homogeneous
100% Other None Detected
AB-30 / 23068520-030
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Mastic
Tan Non-Fibrous
Homogeneous
100% Other None Detected
AB-30 / 23068520-030
Carpet Squares 2x2, Mastic Floor Fill 1st Floor North Wing, Felt
Brown Non-Fibrous
Heterogeneous
15% Glass 85% Other None Detected
AB-31 / 23068520-031
Ceramic Tile 6x6 1st Floor Under M10
Red Non-Fibrous
Homogeneous
100% Other None Detected
AB-32 / 23068520-032
Ceramic Tile 6x6 1st Floor Under M10
Red Non-Fibrous
Homogeneous
100% Other None Detected
AB-33 / 23068520-033
Ceramic Tile 6x6 1st Floor Under M10
Red Non-Fibrous
Homogeneous
100% Other None Detected
AB-34 / 23068520-034
Grout (6x6 Tile Grout) 1st Floor Under M10, Grout
Gray Non-Fibrous
Homogeneous
100% Other None Detected
AB-34 / 23068520-034
Grout (6x6 Tile Grout) 1st Floor Under M10, Leveling Compound
White Non-Fibrous
Homogeneous
100% Other None Detected
Analyst:
Analysis Date: 12/21/2023 Date: 12/21/2023
Approved Signatory:
11709 Chesterdale Rd., Cincinnati, OH 45246 | 513.438.6006 | Fax: 804.897.1177 | www.SanAir.com | IAQ@SanAir.com
IH23-107Project Number:
P.O. Number:
Project Name: USFS Bldg. 24
10/27/2023Collected Date:
12/14/2023 12:00:00 PMReceived Date:
12/21/2023 5:26:48 PM
23068520 SanAir ID Number
FINAL REPORT
Abatement Contractors of Montana, LLCName:
Address: 208 Commerce St.
Missoula, MT 59808
Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
AB-34 / 23068520-034
Grout (6x6 Tile Grout) 1st Floor Under M10, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-35 / 23068520-035
Grout (6x6 Tile Grout) 1st Floor Under M10, Grout
Gray Non-Fibrous
Homogeneous
100% Other None Detected
AB-35 / 23068520-035
Grout (6x6 Tile Grout) 1st Floor Under M10, Leveling Compound
White Non-Fibrous
Homogeneous
100% Other None Detected
AB-35 / 23068520-035
Grout (6x6 Tile Grout) 1st Floor Under M10, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-36 / 23068520-036
Grout (6x6 Tile Grout) 1st Floor Under M10
Gray Non-Fibrous
Homogeneous
100% Other None Detected
AB-37 / 23068520-037
Mortar, Concrete? 1st Floor Under M10
Tan Non-Fibrous
Heterogeneous
100% Other None Detected
AB-38 / 23068520-038
Mortar, Concrete? 1st Floor Under M10
Tan Non-Fibrous
Heterogeneous
100% Other None Detected
AB-39 / 23068520-039
Mortar, Concrete? 1st Floor Under M10
Tan Non-Fibrous
Heterogeneous
100% Other None Detected
AB-40 / 23068520-040
Carpet, Mastic 1st Floor Over M-11-13 North Wing, Carpet
Gray Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
AB-40 / 23068520-040
Carpet, Mastic 1st Floor Over M-11-13 North Wing, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
Analyst:
Analysis Date: 12/21/2023 Date: 12/21/2023
Approved Signatory:
11709 Chesterdale Rd., Cincinnati, OH 45246 | 513.438.6006 | Fax: 804.897.1177 | www.SanAir.com | IAQ@SanAir.com
IH23-107Project Number:
P.O. Number:
Project Name: USFS Bldg. 24
10/27/2023Collected Date:
12/14/2023 12:00:00 PMReceived Date:
12/21/2023 5:26:48 PM
23068520 SanAir ID Number
FINAL REPORT
Abatement Contractors of Montana, LLCName:
Address: 208 Commerce St.
Missoula, MT 59808
Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
AB-41 / 23068520-041
Carpet, Mastic 1st Floor Over M-11-13 North Wing, Carpet
Gray Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
AB-41 / 23068520-041
Carpet, Mastic 1st Floor Over M-11-13 North Wing, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-42 / 23068520-042
Carpet, Mastic 1st Floor Over M-11-13 North Wing, Carpet
Gray Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
AB-42 / 23068520-042
Carpet, Mastic 1st Floor Over M-11-13 North Wing, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-43 / 23068520-043
Carpet, Mastic 1st Floor North Wing, Carpet
Tan Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
AB-43 / 23068520-043
Carpet, Mastic 1st Floor North Wing, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
AB-44 / 23068520-044
Carpet, Mastic 1st Floor North Wing, Carpet
Tan Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
AB-44 / 23068520-044
Carpet, Mastic 1st Floor North Wing, Mastic
Various Non-Fibrous
Homogeneous
100% Other None Detected
AB-45 / 23068520-045
Carpet, Mastic 1st Floor North Wing, Carpet
Tan Fibrous
Homogeneous
90% Synthetic 10% Other None Detected
AB-45 / 23068520-045
Carpet, Mastic 1st Floor North Wing, Mastic
Yellow Non-Fibrous
Homogeneous
100% Other None Detected
Analyst:
Analysis Date: 12/21/2023 Date: 12/21/2023
Approved Signatory:
11709 Chesterdale Rd., Cincinnati, OH 45246 | 513.438.6006 | Fax: 804.897.1177 | www.SanAir.com | IAQ@SanAir.com
IH23-107Project Number:
P.O. Number:
Project Name: USFS Bldg. 24
10/27/2023Collected Date:
12/14/2023 12:00:00 PMReceived Date:
12/21/2023 5:26:48 PM
23068520 SanAir ID Number
FINAL REPORT
Abatement Contractors of Montana, LLCName:
Address: 208 Commerce St.
Missoula, MT 59808
Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
AB-46 / 23068520-046
Floor Tile, Mastic 1st Floor N.
Wing Under M15 (Partition, Floor Tile
White Non-Fibrous
Homogeneous
97% Other 3% Chrysotile
AB-46 / 23068520-046
Floor Tile, Mastic 1st Floor N.
Wing Under M15 (Partition, Mastic
Black Non-Fibrous
Homogeneous
96% Other 4% Chrysotile
AB-47 / 23068520-047
Floor Tile, Mastic 1st Floor N.
Wing Under M15 (Partition, Floor Tile
Not Analyzed
AB-47 / 23068520-047
Floor Tile, Mastic 1st Floor N.
Wing Under M15 (Partition, Mastic
Not Analyzed
AB-48 / 23068520-048
Floor Tile, Mastic 1st Floor N.
Wing Under M15 (Partition, Floor Tile
Not Analyzed
AB-48 / 23068520-048
Floor Tile, Mastic 1st Floor N.
Wing Under M15 (Partition, Mastic
Not Analyzed
Analyst:
Analysis Date: 12/21/2023 Date: 12/21/2023
Approved Signatory:
11709 Chesterdale Rd., Cincinnati, OH 45246 | 513.438.6006 | Fax: 804.897.1177 | www.SanAir.com | IAQ@SanAir.com
IH23-107Project Number:
P.O. Number:
Project Name: USFS Bldg. 24
10/27/2023Collected Date:
12/14/2023 12:00:00 PMReceived Date:
12/21/2023 5:26:48 PM
23068520 SanAir ID Number
FINAL REPORT
Abatement Contractors of Montana, LLCName:
Address: 208 Commerce St.
Missoula, MT 59808
Disclaimer
The final report cannot be reproduced, except in full, without written authorization from SanAir. This report is the sole property of the client named on the SanAir Technologies Laboratory chain-of-custody (COC). Results in the report are confidential information intended only for the use by the client named on the COC. Neither results nor reports will be discussed with or released to any third party without our client's written permission to assure that parts of the report are not taken out of context and to maintain client confidentiality. The information provided in this report applies only to the samples submitted in the condition they were received at the laboratory and is relevant only for the date, time, and location of sampling. Samples were received in good condition unless otherwise noted on the report. Fibers smaller than 5 microns cannot be seen with this method due to scope limitations. The accuracy of the results is dependent upon the client’s sampling procedure and information provided to the laboratory by the client, which includes the project name, project number, po number, sample collection dates, special instructions, samples collected by, sample numbers, sample identifications/ location, sample type, selected analysis type, and total area or volume that may affect the validity of the results. SanAir assumes no responsibility for the sampling procedure and will provide evaluation reports based solely on the sample and information provided by the client. SanAir assumes no responsibility or liability for the manner in which results are used or interpreted. This report does not constitute and shall not be used to claim product certification, approval, or endorsement by NVLAP, NIST, AIHA LAP, LLC or any other agency of the U.S. government. Samples are held for a period of 60 days.
Polarized- light microscopy is not consistently reliable in detecting asbestos in floor covering and similar non-friable organically bound materials. Quantitative transmission electron microscopy is currently the only method that can be used to determine if this material can be considered or treated as non-asbestos containing.
Asbestos Accreditations, Licenses, or Certificates NVLAP Lab Code 600227-0
State of Rhode Island Department of Health, Certification Number: PLM00144, TEM00144 State of West Virginia Bureau for Public Health, Analytical Laboratory Number: LT000637
Rev#01 2/3/2023 Page 13 of 18
P a g e o f g e o f g e o f g e o f
SanAir ID#: 23068874
Project #: IH23-107 Project Name: USFS Bldg 24 Report Date: 12/19/2023
Analysis Report prepared for Abatement Contractors of Montana, LLC
Dear Brian Betts, We at SanAir would like to thank you for the work you recently submitted. The 72 sample(s) were received on Monday, December 18, 2023 via UPS. The final report(s) is enclosed for the following sample(s): AB-49, AB-50, AB-51, AB-52, AB-53, AB-54, AB-55, AB-56, AB-57, AB-58, AB-59, AB-60, AB-61, AB-62, AB-63, AB-64, AB-65, AB-66, AB-67, AB-68, AB-69, AB-70, AB-71, AB-72, AB-73, AB-74, AB-75, AB-76, AB-77, AB-78, AB-79, AB-80, AB-81, AB-82, AB-83, AB-84, AB-85, AB-86, AB-87, AB-88, AB-89, AB-90, AB-91, AB-92, AB-93, AB-94, AB-95, AB-96, AB-97, AB-98, AB-99, AB-100, AB-101, AB-102, AB-103, AB-104, AB-105, AB-106, AB-107, AB-108, AB-109, AB-110, AB-111, AB-112, AB-113, AB-114, AB-115, AB-116, AB-117, AB-118, AB-119, AB-120.
These results only pertain to this job and should not be used in the interpretation of any other job. This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report.
Sincerely, Sandra Sobrino Asbestos & Materials Laboratory Manager SanAir…