11-Exhibit K Project Manual Specs.pdf
PDF 4 MB Posted
- Solicitation number
- 2025-21
- Issued by
- Gregg County, Texas
About this file
This document is a comprehensive technical specification file for the electrical systems of a Gregg County Precinct 2 renovation project located at 800 Gilmer Road in Longview, Texas. The specification, designated as Section 260000, provides detailed requirements for electrical work, including materials, installation standards, quality assurance, submittal procedures, warranties, and coordination guidelines for electrical systems. The document covers multiple electrical system components such as conductors, cables, grounding systems, raceways, boxes, identification systems, power studies, commissioning, control components, lighting control devices, wiring devices, engine generators, and lighting installations.
The specification establishes rigorous technical standards for electrical contractors, requiring certification, compliance with federal, state, and local codes, and adherence to the latest National Electrical Code (NEC) standards. Contractors must provide comprehensive documentation, including detailed shop drawings, product data, warranty information, and close-out submittals. The specification mandates that all materials and equipment be new, free from defects, and listed by an NEC-accepted agency. The project includes provisions for additional materials, attic stock, and requires a one-year warranty on workmanship and materials, with specific manufacturers' warranties for certain components. The electrical work is part of a broader renovation project for the Gregg County Precinct 2 facility, with a focus on ensuring high-quality, code-compliant electrical infrastructure.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Precinct 2 Table of Contents
800 Gilmer Road, Longview, Tx. 75604 1 5/6/2025
Construction Documents
Project Manual/Specifications
Project: Gregg County 800 Gilmer Road Renovation
800 Gilmer Road
Longview, Texas
Owner: Gregg County
101 E. Methvin
Longview, TX 75601
Issue Date:5/6/2025
Revisions:
1105 Judson Road, Longview, Texas Phone: 903-757-7202
Longview, Tx. 75604 2 5/6/2025
TABLE OF CONTENTS
SECTION TITLE
DIVISION 1 – GENERAL REQUIREMENTS
Section 01210 Allowances
Section 01230 Alternates
Section 01311 Storm Water Pollution Prevention Requirements
Section 019100 Building Systems Commissioning
DIVISION 2 – DEMOLITION AND SITE WORK
Section 02070 Selective Demolition
Section 02110 Site Clearing
Section 02300 Earthwork
Section 02361 Termite Control
Section 02540 Onsite Sewage Disposal Systems
Section 02550 Sanitary Sewer / Wastewater Utility Pump Stations
Section 02751 Cement Concrete Paving
Section 02577 Pavement Markings and Speed Bumps
Section 02630 Storm Sewage Drainage Systems
Section 02751 Cement Concrete Paving
Section 02810 Underground Irrigation System
Section 02821 Chain Link Fencing and Gates
Section 02900 Landscape
DIVISION 3 – CONCRETE (See Engineering Drawings)
Section 03300 Cast-In Place Concrete
Section 03600 Non-Shrink Construction Grout
DIVISION 4 – MASONRY
Longview, Tx. 75604 3 5/6/2025
Section 04200 Unit Masonry
DIVISION 5 – METALS (See Engineering Drawings)
Section 05720 Handrails and Railings
DIVISION 6 – WOOD AND PLASTICS
Section 06400 Custom Casework - Plastic Laminate
Section 06600 Plastic Fabrications
Section 06650 Solid Surfacing
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
Section 07110 Emulsion Type Dampproofing Coating
Section 07210 Building Insulation
Section 07250 Weather Barrier
Section 07424 Nichiha
Section 07429 Longboard Soffit
Section 07461 Longboard Cladding
Section 07540 Thermoplastic Polyolefin (TPO) Membrane Roofing
Section 07600 Flashing and Sheet Metal
Section 07610 Metal Roofing
Section 07620 Preformed Metal Panels
Section 07712 Gutters, Scuppers and Downspouts
Section 07720 Roof Accessories
Section 07810 Applied Fireproofing
Section 07900 Joint Sealers, Dampproofing and Waterproofing
DIVISION 8 – DOORS AND WINDOWS
Section 08110 Steel Doors and Frames
Section 08117 Prefinished Steel Door Frames
Section 08216 Plastic Laminate Faced Wood Doors
Section 08400 Aluminum Entrances, Windows and Storefronts
Section 08560 Vinyl Windows
Longview, Tx. 75604 4 5/6/2025
Section 08700 Door Hardware
Section 08800 Glass and Glazing
DIVISION 9 – FINISHES
Section 09100 Metal Stud Framing System
Section 09250 Gypsum Board System and Exterior Sheathing
Section 09260 Gypsum Board Finishing
Section 09300 Tile
Section 09510 Acoustical Ceilings
Section 09650 Resilient Flooring and Base
Section 09651 Luxury Vinyl Tile Flooring
Section 09680 Carpet
Section 09900 Painting
Section 09950 3 Form
Section 09955 Vinyl Wallcoverings
DIVISION 10 – SPECIALTIES
Section 10200 Plastic Laminate Toilet Partitions
Section 10260 Wall Protection and Corner Guards
Section 10350 Flagpoles
Section 10400 Signs and Identification Devices
Section 10440 Fire Protection Specialties
Section 10500 Lockers and Locker Benches
Section 10550 Postal Specialties
Section 10731 Awnings and Canopies
Section 10800 Toilet and Bath Accessories
Section 10820 Mechanical Screen
DIVISION 11 – EQUIPMENT
DIVISION 12 - FURNISHINGS
Section 12491 Horizontal Louver Blinds – Manual Shades
Longview, Tx. 75604 5 5/6/2025
DIVISION 13 – SPECIAL CONSTRUCTION (See Engineering Drawings)
DIVISION 14 – CONVEYING SYSTEMS
Section 14010 Vacuum Tube System
DIVISION 15 – MECHANICAL AND PLUMBING
Section 15010 General Provisions - Mechanical
Section 15400 Plumbing
Section 15500 Heating, Ventilation and Air Conditioning
DIVISION 16 - ELECTRICAL
Section 16050 Basic Electrical Materials and Methods
DIVISION 22 – PLUMBING (Engineer)
220000 Basic Plumbing Requirements
220090 Plumbing Submittal Procedures
220554 Plumbing Identification
220720 Piping Insulation
220800 Commissioning of Plumbing
221117 Domestic Water Piping and Appurtenances Copper
221118 Domestic Water Piping and Appurtenances CPVC/PEX
221317 Soil, Waste and Sanitary Drain Piping, Vent Piping, and Appurtenances
221318 Condensate Piping
223334 Access Doors
224001 Plumbing Fixtures and Fixture Carriers
DIVISION 23 - HEATING, VENTILATING AND AIR-CONDITIONING (HVAC) (Engineer)
230000 Basic Mechanical Requirements
230090 HVAC Submittal Procedures
230519 Meters and Gauges for HVAC Piping
230529 Hangers and Supports for HVAC Piping and Equipment
230532 Roof Curbs
Longview, Tx. 75604 6 5/6/2025
230533 Roof Curb Adapters
230553 Identification for HVAC Piping and Equipment
230593 Testing, Adjusting, and Balancing for HVAC
230713 Duct and Grille Insulation
230721 Refrigerant Piping Insulation
230800 Commissioning of Heating, Ventilating and Air Conditioning (HVAC)
230913 Programmable Control Devices for HVAC (Thermostats)
230923A Sequence of Operations General
230923I Sequence of Operations Rooftop Unit Sequences
232300 Refrigerant Piping
233113 Metal Ductwork
233333 Access Doors
233713 Diffusers, Registers, and Grilles
234323 Bipolar Ionization Air Purification System
238119 Packaged HVAC Units
238127 Small Capacity Split System Units
DIVISION 26 – ELECTRICAL (Engineer)
260000 Electrical
260505 Selective Demolition for Electrical
260519 Low Voltage Electrical Power Conductors and Cables
260526 Grounding and Bonding for Electrical Systems
260533 Raceways and Boxes for Electrical Systems
260553 Identification for Electrical Systems
260573 Power System Studies
260800 Commissioning of Electrical Systems
260916 Electrical Control Components
Longview, Tx. 75604 7 5/6/2025
260923 Lighting Control Devices
262726 Wiring Devices
263213 Engine Generators
265000 Lighting
DIVISION 27 – COMMUNICATIONS (Engineer)
271030 Data Cable Plant
274018 Audio Video Equipment, Brackets and Cabling
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY (Engineer)
280544 Emergency Responder Radio Coverage System
Project Name Section 01210
Project Address 8 Date
DIVISION 1 – GENERAL REQUIREMENTS
SECTION 01210 – ALLOWANCES
1.1 SUMMARY
A. This Section includes administrative and procedural requirements governing the following: Lump sum allowances, Unit cost allowances, Miscellaneous allowances, Materials Testing Allowance
1. Allow for $100,000 for:
a. Landscaping
b. Irrigation
1.2 MISCELLANEOUS ALLOWANCES
A. Use of the Miscellaneous Allowance for Extra Work is only as directed by the Architect for the Owner’s purposes and only by Change Orders that indicate amounts to be charged to the Miscellaneous Allowance for Extra Work. The Owner must approve all changes to this allowance prior to commencement of the Work.
B. Contractor’s related costs for products and equipment ordered by Owner under the
Miscellaneous Allowance for Extra Work are included in the allowance. These costs include delivery, installation, insurance, equipment rental, and similar costs.
1.3 UNUSED MATERIALS
A. Return unused materials purchased under an allowance to manufacturer or supplier for credit to Owner, after installation has been completed and accepted.
3.1 PREPARATION
A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.
END OF SECTION 01210
Precinct 2 Section 02110
Longview, Tx. 75604 9 5/6/2025
SECTION 01230 - ALTERNATES
1.1 DEFINITIONS
A. Alternate: An amount proposed by Contractor or Subcontractor for certain work that may be added to or deducted from the Base Bid amount if Owner decides to accept the corresponding change.
1.2 PROCEDURES
A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation.
2.1 ALTERNATES Describe in detail here each Alternate – coordinate carefully with Drawings.
A. Alternate #1: ALT - FIBERON CONCORIDA, SYMMETRY COLLECTION - BURNT UMBER.
INSTALLED ON A METAL FENCE FRAME PER MANUFACTURER RECOMMENDATION FOR
FRAME SPACING. VERTICAL & HORIZONTAL. See exterior elevations
END OF SECTION 01230
SECTION 01311 – STORM WATER POLLUTION PREVENTION REQUIREMENTS
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 GENERAL REQUIREMENTS
A. This item shall consist of the work required to provide storm water pollution prevention meeting the requirements of the Texas Commission on Environmental Quality (TCEQ) and the City of Longview. The TCEQ requirements are specified in the Texas Pollutant
Discharge Elimination System (TPDES) Construction General Permit (CGP) No.
TXR150000. The City of Longview requirements are specified in the City of Longview
Drainage Criteria and Erosion Control (DC&EC) Manual.
1. REQUIREMENTS – 5 OR MORE ACRES DISTURBED. For construction activities that will disturb 5 or more acres, the Contractor shall perform all activities required by
TCEQ and the City of Longview DC&EC Manual. TCEQ requirements include, but are not limited to the following tasks:
a. Obtain a copy of the TCEQ CGP (TPDES Permit No. TXR150000).
b. Develop a storm water pollution prevention plan (SWP3) meeting the requirements of the TCEQ General Permit and the DC&EC Manual.
c. Complete and submit a Notice of Intent (NOI) to the TCEQ using the TCEQ form. Include all necessary fees with the NOI submittal. The NOI and all fees must be submitted at least two (2) days prior to commencement of construction.
d. Complete and submit an annual Project fee to the TCEQ.
e. Provide the Owner and the Engineer with a copy of the NOI and a copy of the check to the TCEQ and a written notice indicating the date that the NOI was submitted to the TCEQ.
f. Implement the SWP3. Perform maintenance and inspection as required by the SWP3.
g. Continue to submit the annual project fee as the project continues.
h. Modify the SWP3 during construction as necessary.
Longview, Tx. 75604 10 5/6/2025
i. Complete and submit a Notice of Termination (NOT) to the TCEQ once the site has reached final stabilization.
2. REQUIREMENTS – 1 OR MORE ACRES BUT LESS THAN 5 ACRES DISTURBED. For construction activities that will disturb 1 or more acres, but less than 5 acres, the
Contractor shall perform all activities required by TCEQ and the City of Longview
DC&EC Manual. TCEQ requirements include, but are not limited to the following tasks:
a. Obtain a copy of the TCEQ CGP (TPDES Permit No. TXR150000).
b. Develop a storm water pollution prevention plan (SWP3) meeting the requirements of the TCEQ General Permit and the DC&EC Manual.
c. Complete and submit a Construction Site Notice (CSN) to the TCEQ using the TCEQ form. Include all necessary fees with the CSN submittal. The CSN and all fees must be submitted at least two (2) days prior to commencement of construction.
d. Post the Construction Site Notice at the Project Site.
e. Complete and submit an annual Project fee to the TCEQ.
f. Provide the Owner and the Engineer with a copy of the CSN and a copy of the check written to the TCEQ and a written notice indicating the date that the CSN was submitted to the TCEQ.
g. Implement the SWP3. Perform maintenance and inspection as required by the SWP3.
h. Continue to submit the annual project fee as the project continues.
i. Modify the SWP3 during construction as necessary.
3. REQUIREMENTS – LESS THAN 1 ACRE DISTURBED. For construction activities that will disturb less than one acre, coverage under the TCEQ permit is not required.
The Contractor shall, regardless of the size of the area disturbed, provide storm water pollution prevention measures meeting the criteria of the City's DC&EC
Manual. If construction activity increases and the disturbed area increases to 1 or more acres, the Contractor will be required to comply with the applicable sections above.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01311
Z:\HLH DESIGN\GREGG COUNTY\1 292 1403 001 #800 GILMER RD PREC 2\_SPECS 1 292 1403 001\_WORKING\019100 TOC - GENERAL
REQUIREMENTS.DOCX
EMA REGISTRATION NO. F-893
DIVISION 01 - GENERAL REQUIREMENTS
019100 Building Systems Commissioning
05-01-2025
Precinct 2 Section 019100
Longview, Tx. 75604 1 5/2/2025 EMA Engineering & Consulting
SECTION 019100 - BUILDING SYSTEMS COMMISSIONING
PART 1 - GENERAL
1.1 DESCRIPTION
A. Commissioning this project shall include MEP systems installation and operations. The commissioning process shall generally follow the ASHRAE Guideline 0 and ASHRAE Std 90.1 I- P. Commissioning for this project shall be as necessary for full compliance with 2021 IECC commissioning requirements.
B. Commissioning Agent (CA): The owner will engage the CA under separate contract.
C. Mechanical and plumbing commissioning shall be done by the registered design professional or approved agency.
D. For electrical commissioning, the registered design professional shall provide evidence that the system is operating in accordance with the construction documents.
E. Commissioning: Commissioning is a systematic process of ensuring that all building systems perform interactively according to the design intent and the owner's operational requirements. Commissioning during the construction phase is intended to achieve the following specific objectives according to the Contract Documents:
1. Observe and document equipment and systems installations and operations.
2. Observe and document proper performance of equipment and systems per the construction documents.
3. Review systems manual and closeout documentation.
F. The commissioning process does not take away from or reduce the responsibility of the system designers or installing contractors to provide a finished and fully functioning product, equipment, or system.
G. Abbreviations: The following are common abbreviations used in the specifications and in the Commissioning Plan.
A/E Architect & Design Engineers FT Functional Performance Test CA/CxA Commissioning Agent GC General Contractor
CC Construction Manager MC Mechanical Contractor Cx Commissioning PC Project Checklist
CxP Commissioning Plan Subs Sub Contractors EC Electrical Contractor MC Mechanical Contractor PLC Plumbing Contractor TAB Test And Balance Contractor FC Fire Alarm Contractor SC Security Contractor
CTC Controls Contractor TC Technology Contractor
Longview, Tx. 75604 2 5/2/2025 EMA Engineering & Consulting
H. Divisional specifications sections related to commissioning activities are as follows:
1. Division 01 - General Requirements
2. Division 22 - Plumbing
3. Division 23 - HVAC&R
4. Division 26 - Electrical
1.2 COORDINATION
A. Commissioning Team: The members of the commissioning team consist of the Commissioning Agent (CA), the owner’s Project Manager (PM), the designated representative of the owner’s Construction Management firm (CM), the General Contractor (GC or Contractor), the architect and design engineers (particularly the mechanical engineer), the Mechanical Contractor (MC), the Electrical Contractor (EC), the TAB representative, the Controls Contractor (CC), any other installing subcontractors or suppliers of equipment. If known, the Owner’s building or plant operator/engineer is also a member of the commissioning team.
B. Management: The CA will report directly to the Owner for commissioning related functions and copy the Architect and Contractor as required. The CA directs and coordinates the commissioning activities and reports with the CM and PM. All team members work together to fulfill their contracted responsibilities and meet the objectives of the Contract Documents.
C. Scheduling: The CA will work with the CM and GC according to established protocols to schedule the commissioning activities. The CM will notify the CA as to the readiness of systems and equipment for functional testing. The CA will provide sufficient notice to the CM and GC for scheduling commissioning activities for such equipment and systems upon notification from the CM that said systems will be ready for testing and or commissioning.
The GC will integrate all commissioning activities into the master project schedule and will provide a copy of the schedule, including all updates, to the CA for his use in commissioning this project. All parties will address scheduling problems and make necessary notifications in a timely manner in order to expedite the commissioning process. It is understood that the progress for commissioning of systems will be dependent upon the progress of the following:
1. Response Times: Timelines for delivering information requested, required, or providing responses to the CA are essential to providing the construction product to the owner on time as well as facilitating the commissioning process. The contractor shall adhere to the following to meet this objective:
a. Written response to Issue Log, Punchlist, Site Observation report, or request for information, clarification, or other documentation necessary to facilitate and carry out the commissioning process: 07 Calendar days from the date request was received by contractor in writing.
b. Discrepancies identified in record drawings during the construction phase: 15 calendar days.
1.3 COMMISSIONING PROCESS
Longview, Tx. 75604 3 5/2/2025 EMA Engineering & Consulting
A. Commissioning Plan: The Commissioning Plan provides guidance in the execution of the commissioning process. The CA will update the plan which is then considered the “final” plan, though it will continue to evolve and expand and be updated on a regular basis for content by the CA as the project progresses. The Specifications will take precedence over the Commissioning Plan.
B. Commissioning Process: The following narrative provides a brief overview of the typical commissioning tasks during construction and the general order in which they occur.
C. Equipment documentation is submitted to the CA during normal submittals and concurrent with the design team submittal submission, including detailed start-up procedures.
D. In general, the check-out and performance verification proceeds from simple to complex;
from component level to equipment to systems and intersystem levels with CHECKLISTS being completed before functional testing.
E. The Subs, under their own direction, execute and document the CHECKLISTS and perform start-up and initial check-out.
F. The checklist procedures are executed by the contractor responsible for their respective systems and under their respective scope of work. An example of a coordinated procedure would be an AHU that requires Electrical, FA Duct Smoke Detector, DDC Controls, and a VFD for operation. This would require a signature from the Mechanical, Electrical, Fire Alarm, Controls contractor, and TAB sub.
G. Functional Testing of the MEP SYSTEMS shall be scheduled by the CA and GC and shall be conducted by the appropriate sub-contractor. The CA will direct the testing and sub-contractor will carry out the test.
H. Items of non-compliance in material, installation, or setup are corrected and the system is to be retested at the contractor’s expense.
I. The CA reviews the O&M documentation for completeness.
J. Commissioning is completed before Substantial Completion.
K. Deferred or seasonal testing is to be conducted as specified and as required.
1.4 RESPONSIBILITIES
A. Commissioning Team: The responsibilities of various parties in the commissioning process are provided in this section and are typically referenced as follows: Division 01 - General Requirements, Division 22 - Plumbing, Division 23 - HVAC & R, and 26 - Electrical. It is noted that the services for the Owner’s Project Manager, Construction Manager, Architect, MEP, Special systems design consultants, and Commissioning Agent are not provided for in this contract. That is, the Contractor is not responsible for providing their services except where stated in other divisional specs sections. Their responsibilities are listed here to clarify the commissioning process.
Longview, Tx. 75604 4 5/2/2025 EMA Engineering & Consulting
1. The commissioning team, at a minimum, shall consist of the following:
a. Owner
b. Commissioning Authority
c. Architect
d. Design Engineer
e. Prime Contractor
f. Divisional Contractors and Subcontractors
g. Vendors or Factory reps where required by the divisional specs
B. All Parties
1. Follow the Commissioning Plan and specifications.
2. Attend commissioning scoping meetings and commissioning meetings as necessary.
3. Assist the CA in carrying out commissioning process activities.
C. Architect (A/E)
1. Construction and Acceptance Phase
a. Owner Manages the CA contract.
b. Attend the commissioning scoping meeting and selected commissioning team meetings.
c. Perform normal submittal review, construction observation, as-built drawing preparation, O&M manual preparation, etc., as contracted. Provide submittals for MEP the CA concurrent with the design consultant’s submittal review.
d. Provide all design narrative documentation and updates as requested by the CA for systems to be commissioned.
e. Coordinate resolution of system and component deficiencies identified during commissioning activities.
f. Copy the CA on all responses to RFI/RFC/Revisions as issued by the design team related to systems being commissioned.
g. Furnish a copy of all construction documents, addenda, change orders, RFI’s, ASI’s, and approved submittals and shop drawings related to commissioned equipment to the CA.
h. Review and approve O&M documentation.
i. Warranty Period: Coordinate resolution of design non-conformance issues, design deficiencies, and contractor related deficiencies identified during warranty-period commissioning.
D. MEP & Special Systems Designers/Engineers (of the A/E)
1. Construction and Acceptance Phase
a. Perform normal submittal review, construction observation, as-built drawing preparation, etc., as contracted. Conduct site observations as contracted and required by the owner and A/E.
b. Provide an updated design narrative and sequences documentation requested by the CA for functional testing of MEP systems. The designers shall assist (along with the contractors) in clarifying the operation and control of commissioned MEP equipment in areas where the specifications, control drawings, or equipment
Longview, Tx. 75604 5 5/2/2025 EMA Engineering & Consulting documentation is not sufficient for writing detailed testing procedures.
c. Attend commissioning scoping meetings and other selected commissioning team meetings.
d. Participate in the resolution of system deficiencies identified during commissioning, according to the contract documents.
e. Prepare and submit the final as-built design intent and operating parameters documentation. Review and approve the O&M manuals.
f. Review, comment and approve the functional test procedures for sufficiency prior to their use.
g. Utilizing the sampling method, review and provide comments and recommendations for the checklists for major pieces of equipment for sufficiency prior to their use.
h. Warranty Period: Participate in the resolution of non-compliance, non-conformance, and design deficiencies identified during warranty-period commissioning.
E. Commissioning Agent (CA)
1. Construction and Acceptance Phase
a. The CA is not responsible for design concepts, design criteria, compliance with codes and industry design standards, design or general construction scheduling, cost estimating, test and balance, or construction management. The CA may assist with issue resolution for non-conformance or deficiencies, but ultimately that responsibility resides with the general contractor and the A/E. The primary function of the CA is to develop and coordinate the execution of a testing plan, observe and document and verify using sampling techniques that systems are functioning in accordance with the documented OPR and the Construction Documents. The Contractors will provide all of their own tools to install, start, check out, and functionally test equipment and systems.
b. Coordinates and directs the commissioning activities in a logical, sequential, and efficient manner using consistent protocols and forms, centralized documentation, clear and regular communications and consultations with all necessary parties, frequently updated timelines and schedules, and technical expertise.
c. Coordinate the commissioning work and, with the GC and CM, ensure that commissioning activities are being scheduled into the master project schedule.
d. Revise the Commissioning Plan during the construction phase as necessary.
e. Request and review information required to perform commissioning tasks, including O&M materials, contractor start-up, and check-out procedures as necessary.
f. Before start-up, gather and review the current control sequences and interlocks and work with contractors and design engineers until sufficient clarity has been obtained, in writing, to be able to write testing procedures as necessary.
g. Write and distribute systems functional performance Test requirements.
h. Attend selected planning and job-site meetings to obtain information on construction progress. Review construction meeting minutes for revisions and
Longview, Tx. 75604 6 5/2/2025 EMA Engineering & Consulting substitutions relating to the Commissioning process. Assist in resolving discrepancies.
i. Perform site observations as necessary to observe component and system installations for testing of systems.
j. Oversee sufficient functional testing of the control system.
k. With assistance from installing contractors and A/E, write the functional performance test procedures for equipment and systems. This may include energy management control system trending or manual functional testing.
l. Analyze any functional performance trend logs and monitoring data as required to verify performance.
m. Coordinate, witness, and approve manual functional performance tests performed by installing contractors. Coordinate retesting with the GC and A/E as necessary or required.
n. Maintain a master issue and resolution log and a separate testing record. Provide the owner and CM/GC with periodic written progress reports and test results with recommended actions.
o. Witness performance testing of control systems and document these tests and include this documentation in Commissioning Record in O&M manuals.
p. Compile and maintain a commissioning record and review building systems manual.
q. Review and approve the preparation of the O&M manuals.
r. Provide a final commissioning report.
s. Warranty Period: Coordinate and supervise required seasonal or deferred testing and deficiency corrections.
F. Construction Manager-Owner’s Representative (CM) as applicable
1. Construction and Acceptance Phase
a. Facilitate the coordination of the commissioning work by the CA, working with the GC, to ensure that commissioning activities are being scheduled into the master project schedule.
b. Review and be familiar with the commissioning specifications and final Commissioning Plan-Construction Phase.
c. Attend the commissioning scoping meeting and other commissioning team meetings.
d. Perform the normal review of Contractor submittals.
e. Furnish a copy of all construction documents, addenda, change orders, and approved submittals and shop drawings related to commissioned equipment to the
CA.
f. Review the functional performance test procedures submitted by the CA, prior to testing.
g. When necessary, observe and witness checklists, start-up, and functional testing of selected equipment.
h. Review commissioning progress and deficiency reports.
Longview, Tx. 75604 7 5/2/2025 EMA Engineering & Consulting
i. Coordinate the resolution of non-compliance and design deficiencies identified in all phases of commissioning.
j. Sign-off (final approval) on individual commissioning tests as completed and passing. Recommend completion of the commissioning process to the Project Manager.
k. Assist the GC in coordinating the training of owner personnel.
l. Warranty Period: Assist the CA as necessary in the seasonal or deferred testing and deficiency corrections required by the contract documents.
G. Owner’s Project Manager (PM)
1. Construction and Acceptance Phase
2. Assist the CA as necessary to carry out commissioning activities.
3. Manage the contract of the CA, A/E, and GC.
4. Arrange for facility operating and maintenance personnel to attend various field commissioning activities and field training sessions.
5. Provide final approval for the completion of the commissioning work.
6. Warranty Period: Ensure that any seasonal or deferred testing and any deficiency issues are addressed or that a plan is in place to address issues pending resolution.
H. General Contractor (GC)
1. Contractor and their subcontractors and vendors shall assign capable, skilled, and knowledgeable representatives with expertise and authority to act on their behalf and schedule them to participate in and perform commissioning process activities.
2. Construction and Acceptance Phase
a. Facilitate the coordination of the commissioning work by the CA and ensure that commissioning activities are being addressed in the master construction project schedule.
b. Include the cost of commissioning tasks to be carried out by the contractor and subs, for commissioning of the building systems in the contract price. This will not include the CA’s contract. The CA’s contract for commissioning services shall be between the owner and CA.
c. In each purchase order or subcontract written, include requirements for submittal data, O&M data, commissioning tasks, and training.
d. Ensure that all Subs execute their commissioning responsibilities according to the Contract Documents and schedule.
e. A representative shall attend a commissioning scoping meeting and other necessary meetings scheduled by the CA to facilitate the Cx process.
f. Coordinate and conduct owner training on building and systems operation for equipment provided and installed.
g. Prepare close-out documents including O&M documents, according to the Contract Documents, including clarifying and updating the original control sequences of operation and As-built drawings.
h. Warranty Period: Ensure that Subs execute seasonal or deferred functional performance testing, to be witnessed by the CA, according to the specifications.
Longview, Tx. 75604 8 5/2/2025 EMA Engineering & Consulting
i. Ensure that Subs correct deficiencies and make necessary adjustments to O&M manuals and final as-built drawings and warranty documents for applicable issues identified in any seasonal and deferred testing.
I. Equipment Suppliers
1. Construction and Acceptance Phase
a. Provide all requested submittal data, including detailed start-up procedures, blank start-up docs and checklists, and specific responsibilities of the Owner to keep warranties in force.
b. Assist in equipment start-up, energizing, and pre-testing per agreements with Subs.
c. Include all special tools and instruments (only available from vendor, specific to a piece of equipment) required for testing equipment according to these Contract Documents in the base bid price to the Contractor, except for stand-alone data logging equipment that may be used by the CA. Such tools not required for routine maintenance, operation, and service and not required to be turned over to the owner under other divisional spec sections, shall be returned to the user providing such tools. Examples of this intent would be a flow hood used by the TAB contractor would be returned and remain the property of the TAB contractor whereas a special key for unlocking the chiller control cabinet would be turned over to the owner.
d. Provide information requested by CA regarding equipment sequence of operation and testing procedures.
e. Review system start-up and test procedures for equipment installed by factory representatives.
J. Mechanical Contractor
1. Provide start-up for all HVAC equipment.
2. Assist and cooperate with the TAB contractor and CA by:
a. Putting all HVAC equipment and systems into operation and continuing the operation during each working day of TAB and commissioning, as required.
b. Including cost of sheaves and belts that may be required by TAB.
c. Providing test holes in ducts and plenums where directed by TAB to allow air measurements and air balancing. Provide an approved rubber or steel plug to seal traverse holes.
d. Providing temperature and pressure taps according to the Construction Documents for TAB and commissioning testing.
3. Install a P/T plug at each water sensor which is an input point to the control system and both inlet and discharge side of ALL pumps for TAB.
4. List and clearly identify on the as-built drawings the locations of all air-flow stations.
5. Notify the GC or CA depending on protocol, when pipe and duct system testing, flushing, cleaning, start-up of each piece of equipment, and TAB will occur. Be responsible to notify the GC or CA, ahead of time, when commissioning activities not yet performed or not yet scheduled could delay construction. Be proactive in seeing that commissioning processes are executed and that the CA has the scheduling information needed to efficiently execute the commissioning process.
Longview, Tx. 75604 9 5/2/2025 EMA Engineering & Consulting
K. Controls Contractor
1. Sequences of Operation Submittals: The Controls Contractor’s submittals of control drawings shall include complete detailed sequences of operation for each piece of equipment, regardless of the completeness and clarity of the sequences in the specifications or drawings. The engineer shall be provided written documentation for any revisions to the HVAC&R design documents including engineered approved control sequences. Upon review of the DDC control submittals, the engineer shall provide his approval or rejection in writing to the controls contractor. The Controls Contractor’s submittals of control drawings shall include:
a. An overview narrative of the system (1 or 2 paragraphs) generally describing its purpose, components, and function.
b. All interactions and interlocks with other systems.
c. Detailed delineation of control between any packaged controls and the building automation system, listing what points the BAS monitors only and what BAS points are control points and are adjustable.
d. Written sequences of control for packaged controlled equipment. (Equipment manufacturers’ stock sequences may be included but will generally require additional narrative).
e. Start-up sequences.
f. Warm-up mode and Optimum Start sequences.
g. Normal operating mode sequences.
h. Unoccupied mode sequences.
i. Shutdown sequences.
j. Capacity control sequences and equipment staging.
k. Temperature and pressure control: setbacks, setups, resets, etc.
l. Detailed sequences for all control strategies, e.g., economizer control, optimum start/stop, staging, optimization, demand limiting, etc.
m. Effects of power or equipment failure with all standby components including HVAC and Emergency powered systems with VFD’s and responses (Restart, Alarm, etc.).
n. Sequences for all alarms and emergency shutdowns.
o. Seasonal operational differences and recommendations.
p. Initial and recommended values for all adjustable settings, set points parameters that are typically set or adjusted by operating staff; and any other control settings or fixed values, delays, etc. that will be useful during testing and operating the equipment.
q. Schedules, if known and provided by owner.
r. All sequences shall be written in small statements, each with a number for reference. For a given system, numbers will not repeat for different sequence sections, unless the sections are numbered.
2. Control Drawings Submittal
a. The control drawings shall have a key and legend for all abbreviations and symbols.
b. The control drawings shall contain graphic schematic depictions of the systems and each component.
Longview, Tx. 75604 10 5/2/2025 EMA Engineering & Consulting
c. The schematics will include the system and component layout of any equipment that the control system monitors, enables, or controls, even if the equipment is primarily controlled by packaged or integral controls.
d. Provide a full points list with at least the following included for each point:
1) Controlled system Point abbreviation
2) Point description
3) Display unit
4) Control point or set point (Yes / No)
5) Monitoring point (Yes / No)
6) Intermediate point (Yes / No)
7) Calculated point (Yes / No)
(a) Key:
(1) Point Description: DB temp, airflow, etc.
(2) Control or Setpoint: Point that controls equipment and can have its set points changed (OSA, SAT, etc.)
(3) Intermediate Point: A Point whose value is used to make a calculation which then controls equipment (space temperatures that are averaged to a virtual point to control reset).
(4) Monitoring Point: A Point that does not control or contribute to the control of equipment; but is used for the operations, maintenance, or performance verification.
(5) Calculated Point: “Virtual” point generated from calculations of other point values. The Controls Contractor shall keep the CA informed of all changes to this list during programming and setup in all phases of the project.
3. An updated as-built version of the control drawings and sequences of operation shall be included in the final controls O&M manual submittal.
4. Assist, coordinate, and cooperate with the TAB contractor in the following manner:
a. Meet with the TAB contractor prior to beginning TAB work and review the TAB plan to determine the capabilities of the control system toward completing TAB. Provide the TAB any needed unique instruments for setting terminal unit boxes and instruct TAB in their use (handheld control system interface for use around the building during TAB, etc.).
b. For a given area, have all required checklists, calibrations, start-up, and selected Pre-commissioning documentation of the system available during TAB activities.
c. Provide a qualified technician to operate the controls, to assist the TAB contractor in performing TAB work, during scheduled TAB activities. Remote operation of control system, during scheduled TAB and Functional Testing, will not be acceptable. The Controls contractor may provide training to the TAB technician for inputting data into the control software and logic. However, the controls contractor shall be ultimately responsible for entering and saving the data, provided by the TAB contractor, into the control system.
5. Assist and cooperate with the CA in the following manner:
Longview, Tx. 75604 11 5/2/2025 EMA Engineering & Consulting
a. Execute the functional testing of the controls system as specified for the controls contractor in Controls Specification Section.
b. Assist in the functional testing of all equipment specified.
c. Execute all control system trend logs specified.
6. Provide a signed and dated certification to the CA and GC upon completion of the check-out of each controlled device, equipment, and system prior to TAB and functional testing. This shall be for each piece of equipment or system, Confirmation that all system programming, installation of control components, debugging, pre-testing, checkout is complete, and the control system is made fully operational as to all respects of the Contract Documents. This shall be completed prior to any TAB work or functional testing of the building systems under DDC control.
7. Beyond the control points necessary to execute all documented control sequences provide monitoring, control, and virtual points.
8. List and clearly identify on the as-built duct and piping drawings the locations of ALL:
static and differential pressure sensors (air, water, and building pressure), hydronic control valves/actuators, electrical control relays for lighting, and control boards.
9. The Controls Contractor shall be responsible for Pre-commissioning of all control systems and components provided and installed by the controls contractor. See other sections of this specification and divisional specifications for training requirements.
During TAB and functional testing, the controls contractor shall produce, at the request of the engineer or commissioning authority, graphic screenshots of the building systems operation as indicated on the building controls graphics.
L. Test and Balance Contractor (TAB)
1. Prior to starting TAB, submit to the CA and GC, the lead TAB technicians contact information.
2. Submit the outline of the TAB plan, to the CA, GC, and Controls Contractor prior to starting the TAB. The TAB contractor will be provided with a set of final approved mechanical and HVAC&R control submittals by the GC, 60 calendar days prior to beginning TAB activities.
3. The submitted TAB plan may include:
a. Certification that the TAB contractor has reviewed the construction documents and the systems with the design engineers and contractors to sufficiently understand the design intent for each system.
b. An explanation of the intended use of the building control system. The controls contractor will comment on feasibility of the plan.
c. All field check-out sheets and logs to be used that list each piece of equipment to be tested, adjusted, and balanced with the data cells to be gathered for each.
d. Discussion of what notations and markings will be made on the duct and piping drawings during the process.
e. Final test report forms to be used.
f. Detailed step-by-step procedures for TAB work for each system and issue.
g. Terminal flow calibration (for each terminal type), diffuser proportioning, branch and submain proportioning, total flow calculations, rechecking, diversity issues, Longview, Tx. 75604 12 5/2/2025 EMA Engineering & Consulting expected problems and solutions, etc. Criteria for using air flow straighteners or relocating flow stations and sensors will be discussed. Provide analogous explanations for the waterside.
h. List of all airflow, water flow, sound level, system capacity, and efficiency measurements to be performed and a description of specific test procedures, parameters, and formulas to be used.
i. Details of how total flow will be determined (Air: sum of terminal flows via BAS calibrated readings or via hood readings of all terminals, supply (SA), and return air (RA) pitot traverse, SA or RA flow stations. Water: pump curves, circuit setter, flow station, ultrasonic, etc.).
j. The identification and types of measurement instruments to be used and their most recent calibration date.
k. Specific procedures that will ensure that both air and water side are operating at the lowest possible pressures and provide methods to verify this.
l. Confirmation that TAB understands the outside air ventilation criteria under all operational conditions.
m. Details of whether and how minimum outside air CFM will be verified and set and for what level (total building, zone, etc.).
n. Details of how building static and exhaust fan/relief damper capacity will be checked.
o. Proposed selection points for sound measurements and sound measurement methods.
p. Details of methods for making any specified coil or other system plant capacity measurements.
q. Details of any TAB work to be done in phases (by floor, etc.), or of areas to be built out later.
r. Details regarding specified deferred or seasonal TAB work.
s. Details of any specified false loading of systems to complete TAB work.
t. Details of all exhaust fan balancing and capacity verifications, including any required room pressure differentials.
u. Details of any required interstitial cavity differential pressure measurements and calculations.
v. Plan for hand-written field technician logs of discrepancies, deficient or uncompleted work by others, contract interpretation requests, and lists of completed tests (scope and frequency).
w. Plan for formal progress reports (scope and frequency).
x. Plan for formal deficiency reports (scope, frequency, and distribution).
4. A running log of events and issues shall be kept by the TAB field technicians. Submit hand-written reports of discrepancies, deficient or uncompleted work by others, contract interpretation requests, and lists of completed TAB work. All issues found during daily TAB activities shall be provided to the GC on-site and prior to leaving the job site for the day.
5. Communicate in writing to the controls contractor all set point and parameter changes made or problems and discrepancies identified during TAB which affect the control
Longview, Tx. 75604 13 5/2/2025 EMA Engineering & Consulting system setup and operation.
6. Provide a draft TAB report within five calendar days of starting Functional Testing of the
HVAC & R systems. Field notes that are legible shall be allowed to be submitted in place of a full draft TAB report.
7. Provide the CA with requested system data findings, gathered or collected during TAB work, but not shown on the TAB reports.
8. Provide a final and complete TAB report for the CA and A/E within 15 calendar days from end of TAB work and as requested by the CA. Punch list items or issues discovered during scheduled TAB activities, reported to the GC for correction by the GC’s subs or vendors, which cause delay in the TAB contractor's ability to complete his work on time per the project schedule, will have the additional time required to complete the TAB work, charged to the GC who may choose to back charge his/her subs. Charges shall be on a Time and Material basis and shall be documented with a line item breakdown for Manpower, time, systems TAB’d, and date of work. Such documentation shall be made available for review by the GC and A/E, prior to any approval by the GC.
9. Assist the CA as needed and required to carry out all HVAC & R functional testing.
Conduct functional performance tests and checks on the original TAB as specified for TAB in Division 23 and controls specification section. Make follow-up visits to the site as necessary and required to correct any work deficiencies or variances to contract documents made by the TAB technician.
M. Electrical Contractor
1. Include the cost of commissioning by the electrical sub in the contract price.
2. Include requirements for submittal data, O&M data, and owner training.
3. Attend a commissioning scoping meeting and other necessary meetings scheduled by the CA to facilitate the Cx process.
4. Contractor shall provide normal cut sheets and shop drawing submittals to the CA of electrical systems to be commissioned.
5. Provide requested electrical systems documentation to the CA when requested by the
CA, for development of functional testing procedures.
a. Typically, this will include detailed manufacturer installation and start-up, operating, troubleshooting and maintenance procedures, full details of any owner-contracted tests, fan and pump curves, full factory testing reports, if any, and full warranty information, including all responsibilities of the Owner to keep the warranty in force clearly identified. In addition, the installation and check-out materials that are actually shipped inside the equipment and the actual field check-out sheet forms to be used by the factory or field technicians shall be submitted to the Commissioning Agent.
b. The Commissioning Agent may request further documentation necessary for the commissioning process.
c. This data request may be made prior to or post normal submittals.
6. Provide a copy of the electrical systems O&M manuals submittals of commissioned equipment, through normal channels, to the CA.
7. Contractors shall assist (along with the design engineers) in clarifying the operation and control of electrical commissioned equipment in areas where the specifications, control
Longview, Tx. 75604 14 5/2/2025 EMA Engineering & Consulting drawings, or equipment documentation is not sufficient for writing detailed electrical testing procedures.
8. Provide assistance to the CA in developing and conducting all CA directed electrical testing. Subs shall review all test procedures to ensure feasibility, safety, and equipment protection and provide necessary written alarm limits to be used during the tests.
9. In a clear and legible format, document all completed installation, start-up, and system operational check-out procedures, providing a copy to the A/E and CA.
10. Address current A/E punch list and Cx Issues Log items before final payment is released.
11. Provide skilled technicians to execute energizing and starting of electrical equipment and to execute all required electrical tests. Ensure that they are available and present during the agreed upon schedules and for sufficient duration to complete the necessary tests, adjustments, and issue resolution.
12. Perform functional performance testing under the direction of the CA or A/E for specified electrical equipment tests. Assist the CA in interpreting any monitoring data, as necessary.
13. Correct deficiencies (differences between specified and observed performance) as interpreted by the CA, GC, and A/E and retest the equipment.
14. Prepare O&M manuals and red-line as-built drawings according to the Contract Documents, including updating the electrical as-built conditions.
15. Provide training of the Owner’s operating personnel as specified.
16. Coordinate with equipment manufacturers to determine specific requirements to maintain the validity of the warranty.
17. Warranty Period: Execute and assist the CA in carrying out deferred functional performance testing according to the specifications.
18. Correct deficiencies and make necessary adjustments to electrical systems O&M manuals and electrical as-built drawings for applicable issues identified in any seasonal or deferred testing.
N. Plumbing Contractor
1. Provide installation and operation for all plumbing equipment.
2. Assist and cooperate with the CA by putting all plumbing equipment, fixtures, domestic water systems, water heaters, recirc pumps, etc., into operation as requested by the CA for testing and confirming the operation of such equipment and components installed under the plumbing scope of services.
3. List and clearly identify on the as-built drawings the locations of all plumbing valves installed above ceiling, in building walls, and underground.
4. Be responsible to notify the GC and CA, ahead of time, when commissioning…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .