This is a Scope of Work document for the Stanton Weirsdale Drainage Retention Area project administered by Marion County, Florida. The project is designed as a stormwater retrofit and drainage improvement to enhance conveyance capacity along a portion of SE 134th Avenue Road. The primary deliverable involves constructing a new drainage retention area and associated conveyance system on Parcel 49794-000-00, with work occurring within the right-of-way and on Marion County-owned parcels. The scope encompasses all necessary site preparation, grading, drainage infrastructure installation, and related improvements required to establish functional stormwater management and conveyance systems that meet current drainage standards and improve overall system performance in the project area.

The project focuses on infrastructure improvements with specific engineering and construction requirements detailed in the scope document. The work is classified as a drainage improvement project under Marion County's capital improvement program, involving collaboration between county departments and external contractors responsible for design and construction execution. Funding for this project derives from Marion County's stormwater management and drainage improvement budget allocations. Contractors should note that all work must comply with Marion County standards, applicable Florida statutes, and environmental regulations governing stormwater management and wetland protection.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

STANTON WEIRSDALE DRAINAGE RETENTION AREA (DRA)

DESCRIPTION OF PROJECT

This construction project is located west of SE 134th Avenue Rd, south of SE 166th Place, and north of SE 167th Lane. Access to this site is via right-of-way on SE 134th Avenue Road. This project is designed as a stormwater retrofit and drainage improvement intended to improve conveyance along a portion of SE 134th Avenue Road. This project will construct a new drainage retention area and associated conveyance system on Parcel 49794-000-00. Work will take place within the right-of-way and Marion County-owned parcels. All work shall be completed in accordance with the final construction plans and specifications.

Project funding is by Community Development Block Grant (CDBG) and is subject to all terms and conditions, including Davis-Bacon Wage Requirements, for the project.

Water Management District permitting has been issued and a copy is included in the bid documents.

CONTRACT TERM

This contract will be in effect for 90 calendar days to Substantial Completion and an additional 15 calendar days to Final Completion. The COUNTY intends to issue the NOTICE TO PROCEED no later than 14 calendar days after the award of the contract by the Board of County Commissioners. Liquidated damages WILL BE ASSESSED for any days over the anticipated work schedule.

PROJECT COMMENCEMENT

Project start date shall commence within fourteen (14) days of Board approval unless otherwise approved by the County Engineer or designee.

NOTE

Any questions must be addressed to Procurement Services on or before the Last Day for Questions as noted on the Invitation Cover Page. It is the CONTRACTOR’S responsibility to attend the pre-bid and ask questions at this time. It is strongly recommended that the site be visited prior to the pre-bid so the CONTRACTOR is familiar with the scope of work and site conditions.