Federal Aviation Administration
AJW Configuration Management Support
(ACMS)
Statement of Work
(SOW)
DRAFT
October 21, 2021
AJW Configuration Management Support (ACMS) Statement of Work i
Table of Contents 1 Introduction
1.1 Background
1.2 Objectives
1.3 Scope of Work
1.4 Inherently Governmental Functions
2 References
3 Support Requirements
3.1 Configuration Management
Configuration Management Plans and Procedures Configuration Management Processes and Standards Configuration Identification and Documentation Configuration Control Configuration Status Accounting Configuration Verification and Audits System/Product/Service Disposition
3.2 Contract Program Management
Contract Management Meeting Attendance Monthly Status Reports Program Management Reviews (PMRs) Task Order Management Transition-In / Transition-Out Requirements
4 End Results/Deliverables
5 Period of Performance
6 Place of Performance
7 Hours of Operation
8 Travel and Other Direct Costs (ODCs)
Appendix A: Acronyms and Abbreviations.............................................................................................. A-1
C-1
1 Introduction This Statement of Work (SOW) describes the requirements for the AJW Configuration Management Support (ACMS) contract. ACMS is an Indefinite Delivery, Indefinite Quantity (IDIQ) contract for configuration management services to support the FAA Technical Operations (AJW) organization’s mission. Each Task Order (TO) established under the ACMS contract will have an associated statement of work (SOW) and will identify project-specific requirements such as programs to be supported, the place of performance, deliverables, and other pertinent information.
1.1 Background
AJW is part of the FAA’s Air Traffic Organization (ATO). AJW’s mission is to ensure a safe and efficient National Airspace System (NAS) through the effective management of air navigation services and infrastructure. The scope of AJW’s mission includes the integration, management, operation, maintenance, and modernization of the systems and services that comprise the NAS.
The following three AJW directorates are anticipated to be the primary users of services provided under the ACMS contract:
• Operations Support, AJW-1 – responsible for providing the support structure, methodology, tools, procedures, performance monitoring, and assurance necessary for the proper operation and maintenance of the NAS.
• Air Traffic Control (ATC) Facilities/Engineering Support, AJW-2 – responsible for the safe and effective lifecycle management of the facilities infrastructure of the National Airspace System (NAS).
• NAS Security and Enterprise Operations (NASEO), AJW-B – responsible for providing operational and cybersecurity management of NAS services.
1.2 Objectives
The primary objective of the ACMS contract is to obtain configuration management services to support the fulfillment of AJW’s mission. With the ACMS contract, AJW is seeking to integrate the support provided to improve efficiency, communications, and collaboration – both across the contractor support staff and relative to their interaction with AJW. ACMS is intended to provide a contract that:
• Is focused on AJW’s mission;
• Facilitates a uniform contracting approach to support AJW and the programs, systems, and services that it manages; and
• Meets the changing needs of AJW across the period of performance as the NAS operating environment evolves.
1.3 Scope of Work
The scope of TOs established under the ACMS contract may include configuration management support to any program, system, or service managed by AJW. Specific requirements within the scope of these functional work areas will be identified, defined, and issued under individually funded TOs.
1.4 Inherently Governmental Functions
In its performance of the ACMS contract, the Contractor must not perform any inherently governmental functions, as identified in the Office of Federal Procurement Policy Letter 11-01.
Inherently governmental functions are those that are so intimately related to the public interest as to require performance by Federal Government employees. The term includes functions that require either the exercise of discretion in applying Federal Government authority or the making of value judgments in making decisions for the Government. This would include, among other things, binding the Government to take or not to take some action by contract, policy, regulation, authorization, order, or otherwise, and exerting ultimate control over the acquisition, use, or disposition of the property of the United States, including the collection, control, or disbursement of appropriations and other Federal funds.
2 References The Contractor must adhere to all applicable FAA Orders. The Contractor must research and employ appropriate FAA Orders, where necessary, under the guidance of the Contracting Officer’s Representative (COR) regarding existing materials and specifications for Government systems. Other business and financial systems must be used.
The Contractor must ensure all work is in full compliance with:
• FAA orders, standards and guidelines
• ATO orders, standards and guidelines
Websites where additional supporting information is available are listed below:
• Orders and Notices:
http://www.faa.gov/regulations_policies/orders_notices/index.cfm/go/document.list/parentTo picID/184
• Forms:
http://www.faa.gov/library/forms/
• Acronyms and Abbreviations:
https://www.faa.gov/jobs/abbreviations/
• Contractor & Industrial Security Program:
http://www.faa.gov/regulations_policies/orders_notices/index.cfm/go/document.information/ documentid/15573 http://www.faa.gov/regulations_policies/orders_notices/index.cfm/go/document.list/parentTopicID/184 http://www.faa.gov/regulations_policies/orders_notices/index.cfm/go/document.list/parentTopicID/184 http://www.faa.gov/library/forms/ http://www.faa.gov/regulations_policies/orders_notices/index.cfm/go/document.information/documentid/15573 http://www.faa.gov/regulations_policies/orders_notices/index.cfm/go/document.information/documentid/15573
3 Support Requirements This section identifies the range of support that must be provided by the Contractor when identified within a TO established under the ACMS contract. Additional requirements and details, including but not limited to written deliverables and/or place and period of performance, may be specified in individual TOs, as applicable. The Contractor must provide the full range of support capabilities defined in the TOs issued under this contract.
In the performance of TOs established under the ACMS contract, Contractor personnel may be required to possess in-depth knowledge of the FAA operating environment including, but not necessarily limited, to FAA Financial Management systems, FAA/ATO orders, policies, and standard operating procedures.
The Contractor must furnish the necessary personnel, materials, equipment, and facilities required to satisfy the requirements of the individual TOs.
3.1 Configuration Management
The Contractor must provide configuration management (CM) support for systems, products, and services that are currently in operation within the NAS or are planned for implementation in the NAS. The Contractor must support all aspects of FAA CM involving establishment, monitoring, and administration of change control procedures, collecting, processing, distributing and tracking modification request forms of hardware, software, facilities, data, interfaces, tools, and documentation. The following subparagraphs identify CM requirements across the AMS life cycle for AJW-managed systems, products, and services.
Configuration Management Plans and Procedures
The Contractor must develop and maintain CM plans and standard operating procedures for the CM of AJW-managed systems, products, and services. Specific tasks may include, but are not limited to:
• Ensure CM plans and procedures for AJW-managed systems, products, and services are consistent with applicable FAA policies;
• Develop and maintain technical documentation needed to the support the CM of AJW-managed systems, products, and services;
• Review existing CM plans and CM programs for AJW-managed systems, products, and services; and
• Prepare reports for AJW management on significant CM events.
Configuration Management Processes and Standards
The Contractor must develop and implement CM processes and standards for AJW-managed systems, products, and services. Specific tasks may include, but are not limited to:
• Support development of requirements for engineering documentation, change orders, and releases in accordance with established FAA CM policies and standard operating procedures;
• Review and monitor the implementation of system/product/service acceptance plans;
• Implement FAA configuration management standards, configuration management plans, and procedures for AJW-managed systems, products, and services;
• Implement and maintain standard operating procedures for processing change proposals for AJW-managed systems, products, and services;
• Coordinate with regional, service area and service center communications, infrastructure, and network CM personnel and Headquarters program offices to assist in the resolution of any facility baseline issues associated with AJW-managed systems, products, and services;
• Evaluate and provide recommendations on configuration management tools; and
• Recommend changes to standard operating procedures as automation is introduced into CM processes.
Configuration Identification and Documentation
The Contractor must identify and document the CM baseline for AJW-managed systems, products, and services. Specific tasks may include, but are not limited to:
• Assist AJW program offices with developing the configuration structure of its systems, products, services;
• Assist AJW program offices with: (1) developing configuration documentation, and (2) assigning identifiers to the documentation and to any electronic media on which the documentation is recorded;
• Ensure that all CM documentation is in compliance with the latest NAS CM policy guidance;
• Assist AJW program offices with providing required information to the Operations Planning, NAS Configuration Management Branch; and
• Assist with the determination of which documents constitute the operational baseline AJW-managed systems, products, and services.
Configuration Control
The Contractor must support the configuration control of AJW-managed systems, products, and services. Specific tasks may include, but are not limited to:
• Support Configuration Control Board (CCB) activities including, but not limited to:
o Plan, schedule, and coordinate CCB meetings as directed by the CCB chairperson(s), o Develop and distribute CCB agendas, o Record and distribute minutes of CCB meetings, o Develop, distribute, and maintain status of CCB decisions, o Establish and maintain liaison with other CCBs, o Maintain and publish status information and efficiency measures of CCB activities, o Log case file for each proposed change into the FAA Document Control (DOCCON) Library, o Coordinate the assignment of a NAS Change Proposal (NCP) number for each case file and log it into DOCCON, o Distribute each NCP via e-mail to all CCB members, o Prepare Configuration Control Documents (CCDs) for each NCP and obtain the CCB Chairperson(s)’s signatures, and o Log signed CCDs into DOCCON;
• Assist with the development and coordination of NAS change proposals;
• Provide administrative and technical support to AJW program offices in resolving comments received on its NAS change proposals;
• Support AJW program offices in completing actions assigned by the CCB in the configuration control decision document;
• Assist AJW program offices with the implementation of configuration control decisions;
• Assist AJW program offices with maintaining the documentation that constitutes the operational baseline;
• Maintain and add new material to the CM libraries for AJW-managed systems, products, and services;
• Implement and maintain a screening process in accordance with CM standard operating procedures to ensure NAS Change Proposals do not have operational impacts on AJW-managed systems, products, and services;
• Participate in NAS Configuration Control Board (CCB) activities and ensure that configuration management impacts to AJW-managed systems, products, and services are identified;
• Maintain versioning of all artifacts including but not limited to requirements documentation, design documentation, test cases, test report, release notes, and project plans;
• Assist AJW program offices in evaluating the quality of prime contractor change control processes and how well the contractor’s change control processes map to the requirements of the associated contract;
• Assist AJW program offices in reviewing and processing engineering change proposals submitted by prime contractors;
• Develop and assist with the processing of NAS Program Initiatives (NPIs);
• Develop and assist with the processing of Baseline Management Notices (BMNs);
• Establish and maintain the CM Program Support Library (PSL) for individual AJW-managed systems, products, and services;
• Assist AJW program offices with CM data control and maintenance; and
• Implement a CM status accounting system that accounts for all engineering product and service documents and authorized changes to product and service documentation.
Configuration Status Accounting
The Contractor must support the configuration status accounting of AJW-managed systems, products, and services. Specific tasks may include, but are not limited to:
• Assist AJW program offices with recording the status of configuration documentation and tracking revisions to the documentation;
• Assist AJW program offices with determining whether prime contractors have a documented configuration status accounting processes;
• Assist AJW program offices in determining whether prime contractors are collecting applicable CM information and whether that information is available for display or retrieval in a timely manner; and
• Assist AJW program offices in determining whether information collected by prime contractors is consistent with the information needed by the program offices.
Configuration Verification and Audits
The Contractor must support the configuration verification and audits of AJW-managed systems, products, and services. Specific tasks may include, but are not limited to:
• Assist AJW program office with the planning, scheduling, and conduct of system/product/ service configuration audits;
• Support AJW program offices in reviewing documented audit results and verifying the disposition of audit findings;
• Conduct verifications and audits on operational equipment in coordination with regional, service area, and service center personnel;
• Establish new baselines, if required, based on the results of configuration audits; and
• As applicable, verify that the operational equipment has been restored to its original configuration.
System/Product/Service Disposition
The Contractor must assist AJW program offices with the preparation of NCPs required to decommission/discontinue AJW-managed systems, products, and services.
3.2 Contract Program Management
This section describes work efforts that must be performed by the Contractor as part of the management and administration of the ACMS contract.
Contract Management
The Contractor must efficiently and accurately manage this contract to ensure compliance with all technical, business, and management (e.g., cost, schedule, and deliverable) requirements of this SOW. The Contractor must designate a Program Manager and other primary points of contact for work to be performed under this Statement of Work and individual task orders issued under the ACMS contract. In support of the management of the ACMS contract, the Contractor must perform the following efforts, at a minimum:
• Provide program management support to ensure that identified tasks are performed efficiently, accurately, on time, and in compliance with the requirements;
• Conduct sufficient oversight and supervision of the contract and its employees in order to ensure both are functioning within designated labor categories and performing at acceptable levels;
• Ensure all assignments are completed in a thorough and timely manner;
• Prepare detailed written documentation of accomplishments as stipulated in the monthly report submission;
• Inform the Contracting Officer (CO) and COR of any potential problems and make recommendations for solutions;
• Participate as a member of a government-led team as required by the CO or COR; and
• Provide sufficient personnel, both in number and qualification, to successfully perform work described herein.
Key Personnel
The Program Manager is defined as “Key Personnel” under the ACMS contract. Key Personnel may only be replaced with the approval of the FAA CO, in accordance with AMS Clause 3.8.2-22.
Proposed Key Personnel must be available to work on the ACMS contract and serve in the assigned role for at least six months from their start of performance on the contract.
The following are the required responsibilities of the ACMS Program Manager:
• ACMS Program Manager – The Contractor’s primary focal point for the ACMS contract.
Has overall responsibility for the execution of the contract including questions regarding any of the task orders and their sub-activities. The Program Manager interfaces with the Government management points-of-contact for the contract.
Meeting Attendance
The Contractor must attend and/or participate in meetings at locations identified in Paragraph 6 of this SOW and other locations as may be requested by the Government.
Monthly Status Reports
The Contractor must provide Monthly Status Reports (MSRs). The MSRs must document task order accomplishments and demonstrate value-added activities of the previous month and identify future planned activities. The reports must be delivered to the COR and contain three parts: a narrative of accomplishments, a cost summary, and a personnel listing by Task Order. MSRs must include the following monthly information by Task Order, at a minimum:
• Narrative overview of work completed, work in progress, and work planned for each task by personnel;
• Status of all task deliverables;
• Identification of risk areas with recommended remedial actions;
• Status of all outstanding risks identified in previous MSRs;
• Labor/CLINs used during month by cost and hours funded and expended;
• Projected date when 75% of funds will be expended by task;
• Projected date when funds will be 100% expended by task;
• Funds and hours remaining by labor/CLINs;
• Other direct costs (ODCs) estimated, used, and remaining by month;
• Summary of expenditures by task by resource and CLIN, both for the monthly reporting period as well as cumulative year-to-date totals, for the performance period;
• Personnel listing by task, start and end dates, on or off Government site status, and primary and secondary phone number; and
• Any additional information pertinent to the FAA in administering the performance of tasks or as required by the COR.
Program Management Reviews (PMRs)
The Contractor must conduct quarterly PMRs. The PMRs must be conducted on dates and locations acceptable to the government, and on a consistent schedule, and will generally be held at, or in the general vicinity of, the FAA headquarters location in Washington, DC. The PMRs must include review of documentation submitted in draft to the COR no less than two (2) business days before the PMR. The PMR and documentation must address the following information:
Schedule by Task Order and Project
• Schedule status and progress against all tasks
• Schedule variance and recommended corrective actions
• Issues requiring schedules of events and deliverables
Cost by Task Order and Project
• Current and cumulative costs traceable to the SOW tasks
• Variance from projected costs
• Cost projections for each task
Performance by Task Order and Project
• Achievements against milestones
• Performance and quality issues
• Significant risks
• Communication/Personnel issues
Task Order Management
The Contractor must designate a Project Lead to provide the appropriate program management and project control necessary to manage each task order issued under this contract, so that task order cost, schedule and quality requirements are continually tracked, status is appropriately communicated to the FAA, and the task order is performed successfully. The Contractor must separately track the individual task orders.
Transition-In/Transition-Out Requirements
The following subsections identify required actions on the part of the Contractor upon contract start-up (i.e., Transition-In) and upon contract close-out (i.e., Transition-Out).
3.2.6.1 Transition-In Requirements
The Contractor must ensure all staff have completed their DOT personnel security requirement(s) (SF-85P) and have received all necessary approvals prior to starting work on the contract. The Contractor shall be fully staffed and operational within 60 days of the effective date of contract award, barring any delays or issues that are beyond the control of the Contractor. At a minimum, the Contractor must accomplish the following transition-in activities with the incumbent Contractor and/or the Government as applicable:
• Assume full responsibility for providing the support services required under newly issued task orders;
• Assume version control of historic data, documentation, processes, and training as applicable;
• Assume user and system administration responsibilities for all systems and tools;
• Obtain facility and network access (keys, cards, security codes/PINs) and required training;
and
• Conduct introduction/orientation activities as required to meet the requirement of task orders issued under this contract.
During the first 120 calendar days of contract performance, the Contractor must conduct, as directed by the CO or COR, Weekly Transition Status Meetings to provide active and planned status on all Transition-In activities.
3.2.6.2 Transition-Out Requirements
No less than 30 calendar days prior to the contract end date, the Contractor must:
• Provide the most recent version of all documentation for which the contractor is responsible to manage or maintain version control;
• Provide a final financial summary report that is cumulative across the full contract period of performance;
• Provide a final status report that includes a projection of activities for the remainder of the Task Order;
• Conduct a close-out meeting with the FAA (details and participants to be determined by the FAA); and
• Turn in all FAA-issued PIV cards to the COR no later than the final day of the period of performance under the last Task Order.
4 End Results/Deliverables This section describes the products and tangible end results that are expected from the activities contained in 1) Section 3; 2) the date each deliverable is due; and 3) the government acceptance criteria.
All days are business days unless otherwise specified.
SOW
Para. # End Result / Deliverable Due Date Acceptance Criteria
3.4.3 Monthly Status Reports (MSRs) 10th day of
the month, reporting on the previous month
The MSRs are accurate, complete, submitted on time in conjunction with invoice submission and in accordance with (IAW) SOW Section 3
3.4.4 Program Management Reviews
(PMRs)
Quarterly The PMRs are accurate, complete, and submitted on time and prepared IAW SOW Section 3
Additional deliverable requirements may be identified in individual task orders.
5 Period of Performance The period of performance of the ACMS contract will be five years.
6 Place of Performance The place of performance for this contract will be at both the Contractor facilities and the Government facilities at, but not limited to, FAA Headquarters in Washington, DC; FAA Air Traffic Control System Command Center (ATCSCC); William J Hughes Technical Center (WJHTC); Mike Monroney Aeronautical Center (MMAC); FAA Service Centers; Network Operations Control Centers and Security Operations Control Centers operated by FAA service providers; and NAS Operational facilities throughout the continental United States such as the NEMCs in Hampton, Georgia and Salt Lake City, Utah.
7 Hours of Operation General hours of operation this contract will be 8:00am to 5:00pm local time. The “hours of operation” correspond to the timeframe within a work week for the Contractor must provide the required support. Any task order-specific hours of operation will be identified in the task order as applicable. Alternate work schedules or telework, or both, must be approved in advance by the Contracting Officer, with agreement from the COR. Furthermore, any requests to the Contracting Officer for Contractor employee telework, either intermittent or regularly scheduled, may only be requested if the Contractor Company has a Telework policy and their employee has met the requirements and been approved thereunder.
When FAA offices close, contractor employees may work in their local offices, telework if previously approved by the Contracting Officer, or be granted access to Government buildings, if appropriate, as directed by the FAA.
8 Travel and Other Direct Costs (ODCs) Travel may be required and ODCs may be incurred as part of the performance of individual Task Orders. Travel may include trips to FAA field locations to support work performed on specific contract tasks. ODCs are costs charged directly to the contract that have not been included in proposed material, direct labor, indirect costs, or any other category of costs. Examples of ODCs include special tooling, shipping expenses, reproduction costs, royalties, and federal excise taxes. All ODC expenses must be consistent with the costs of comparable items or services. The Contractor must submit requests for authorization to the Government-designated point of contact, and all ODCs and travel must be approved in advance and in writing before any such costs are incurred.
A-1
Appendix A: Acronyms and Abbreviations
3PAO 3rd Party Independent Assessment
A2LA American Association for Laboratory Accreditation
A&A Assessment and Authorization
ACG ATO Cybersecurity Group
AISS AJW Integrated Support Services
AJM Organization Code for the FAA’s Program Management organization
AJW Organization Code for the FAA’s Technical Operations organization
AMS Acquisition Management System
API Application Programming Interface
ARS Advanced Reporting System
ASRB Acquisition Strategy Review Board
ATC Air Traffic Control
ATCSCC Air Traffic Control System Command Center
ATO Air Traffic Organization
BET Budget Execution Tool
BMN Baseline Management Notice
BOMS Back- fill Overtime Management System
ACMS Business, Financial, and Administrative Support
BPR Business Process Reengineering
CAD Computer-Aided Design
CAI Contractor Acceptance Inspection
CCB Configuration Control Boards
CO Contracting Officer
COR Contracting Officer’s Representative
COTS Commercial-off-the-Shelf
DELPHI FAA accounting and financial management system
DoD Department of Defense
DOT Department of Transportation
DT Development Testing
ECP Engineering Change Proposal
EME Electromagnetic Emissions
ESM Enhanced Security Monitoring
EVM Earned Value Management
FAA Federal Aviation Administration
F&E Facilities and Equipment
FedRAMP Federal Risk and Authorization Management Program
FIPS Federal Information Processing Standards
FMS Financial Management System
FSR Financial Status Review
FY Fiscal Year
GFE Government Furnished Equipment
GIS Geographic Information System
HF Human Factors
HQ Headquarters
IDIQ Indefinite Delivery, Indefinite Quantity
IGCE Independent Government Cost Estimates
ILSP Integrated Logistics Support Plan
IOC Initial Operating Capability
IP Internet Protocol
IPSF IP Supplemental Form
IRAT Independent Risk Assessment and Testing
ISCM Information System Continuous Monitoring
ISPD Implementation Strategy and Planning Document
ISR In-Service Review
ISS Information System Security
IT Information Technology
KML Keyhole Mark-up Language
KSN Knowledge Sharing Network
LOB Line of Business
MIBC Major Investment Business Case
MMAC Mike Monroney Aeronautical Center
MSR Monthly Status Report
NAS National Airspace System
NASEO NAS Security and Enterprise Operations
NCO NAS Cyber Operations
NCP NAS Change Proposal
NDI Non-development Item
NEMC National Enterprise Management Center
NOCC Network Operations Control Center
NPI NAS Program Initiative
NIST National Institute Standards and Technology
NOCC National Operations Control Center
NOG National Operations Group
NOM National Operations Manager
OAG Official Airline Guide
ODC Other Direct Cost
O&M Operations and Maintenance
OMB Office of Management and Budget
OPI Office of Primary Interest
OS Operations Support
OT&E Operational Test and Evaluation
PA Project Authorization
PC Personal Computer
PgSA Program Scope Agreements
PIN Personal Identification Number
PIV Personal Identification Verification
PLA Project Level Agreement
PMR Program Management Review
PO Program Office
POA&M Plan of Actions and Milestones
POC Point of Contact
PSP Program Safety Plan
PTR Problem Tracking Report
QA Quality Assurance
QC Quality Control
R&D Research and Development
RBAT Radar Beacon Analysis Tool
RE&D Research, Engineering, and Development
REGIS Regional Information System
ROE Rules of Engagement
RMA Reliability, Maintainability, and Availability
RPD Resource Planning Document
RSS Radar Support System
SAPS Staffing and Payroll System
SCRB Support Contracts Review Board
SDLC Software Development Life Cycle
SIEM Security Information and Event Management
SLE Second Level Engineering
SOA Service Order Agreement
SOP Standard Operating Procedure
SOW Statement of Work
SP Special Publication
SSD System Support Directive
TBD To Be Determined
TO Task Order
TOM Transition to Operations and Maintenance
TTP Tactics, Techniques, and Procedures
WINPLOT Windows Plot
WJHTC William J. Hughes Technical Center
| 1 Introduction |
| 1.1 Background |
| 1.2 Objectives |
| 1.3 Scope of Work |
| 1.4 Inherently Governmental Functions |
| 2 References |
| 3 Support Requirements |
| 3.1 Configuration Management |
| 3.1.1 Configuration Management Plans and Procedures |
| 3.1.2 Configuration Management Processes and Standards |
| 3.1.3 Configuration Identification and Documentation |
| 3.1.4 Configuration Control |
| 3.1.5 Configuration Status Accounting |
| 3.1.6 Configuration Verification and Audits |
| 3.1.7 System/Product/Service Disposition |
| 3.2 Contract Program Management |
| 3.2.1 Contract Management |
| 3.2.2 Meeting Attendance |
| 3.2.3 Monthly Status Reports |
| 3.2.4 Program Management Reviews (PMRs) |
| 3.2.5 Task Order Management |
| 3.2.6 Transition-In/Transition-Out Requirements |
| 3.2.6.1 Transition-In Requirements |
| 3.2.6.2 Transition-Out Requirements |
| 4 End Results/Deliverables |
| 5 Period of Performance |
| 6 Place of Performance |