10-Addendum 1 - RFP 26-004-PW- Remove and Replace- SOW.pdf
PDF 227 KB Posted
- Attached to
- Loma Colorado Blvd. Extension
- Solicitation number
- RFP 26-004-PW
- Issued by
- Sandoval County, New Mexico
About this file
This is Addendum One to RFP 26-004-PW issued by the City of Rio Rancho Department of Financial Services Purchasing Division in New Mexico for the Loma Colorado Boulevard Extension Project. The addendum modifies the Scope of Work for Task Phase B, Detailed Evaluation of Alternatives, specifically revising the fourth bullet point regarding the Preliminary Drainage Report. The revision expands the scope to include a Drainage Analysis of the existing arroyo crossing at Broadmoor Boulevard in addition to the preliminary drainage report preparation. The addendum was issued on March 16, 2026, and forms part of the official Contract Documents. Bidders are required to acknowledge receipt of Addendum One, with all other provisions of the Contract Documents remaining unchanged.
The underlying RFP establishes a contract for the design of Loma Colorado Boulevard's extension from Silent Springs Drive to Broadmoor Boulevard, encompassing a two-lane roadway with auxiliary turn lanes, striping, lighting, and signal improvements. The project includes development of a box culvert for the road crossing over Arroyo de Los Montoyas and addition of a roundabout at the Chessman Drive and Silent Springs Drive intersection. No pricing terms, set-asides, award dates, contract term information, or funding details are specified in this addendum document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 26-004-PW
Addendum #1
CITY OF RIO RANCHO
DEPARTMENT OF FINANCIAL SERVICES
PURCHASING DIVISION
3200 CIVIC CENTER CIRCLE NE 3rd FLOOR
RIO RANCHO, NEW MEXICO 87144
TELEPHONE: 505-891-5064
ADDENDUM ONE
RFP 26-004-PW
Loma Colorado Blvd. Extension Project
March 16, 2026
Addendum One (1) forms part of the Contract Documents and modifies them in the manner set forth below.
ATTENTION CONTRACTORS
• Remove and Replace Revision- Exhibit A- Scope of Work
REMOVE: Exhibit A Scope of Work – Task Phase B – Detailed Evaluation of Alternatives
(fourth bullet)
• Prepare a Preliminary Drainage Report.
REPLACE: Exhibit A Scope of Work – Task Phase B – Detailed Evaluation of Alternatives
(fourth bullet)
• Prepare a Preliminary Drainage Report. This will include a Drainage Analysis of the existing arroyo crossing at Broadmoor Blvd.
Bidders shall acknowledge receipt of Addendum One. All other provisions of the
Contract Documents shall remain unchanged.