1-RFP 3809 Variable Frequency Drive (VFD) over 100HP RFP 3809 Exhibits.pdf

PDF 1 MB Posted

Attached to
RFP-WM-3809 - VARIABLE FREQUENCY DRIVES (VFD) OVER 100HP
Solicitation number
RFP-WM-3809
Issued by
Riverside County, California

About this file

This document is a Request for Proposal (RFP 3809) issued by the Eastern Municipal Water District (EMWD), containing multiple exhibits and forms for potential contractors to complete. The RFP includes standard proposal submission documents such as Business Information, Business References, List of Subcontractors, Insurance Affidavit, and CAL/OSHA Compliance History. Contractors are required to provide detailed information about their business, including legal business name, contact information, contractor's license number, and industry code. The document provides a comprehensive checklist of required submittals, ensuring that potential vendors provide all necessary documentation for consideration.

The forms require contractors to disclose critical business details, including safety compliance history, insurance capabilities, and references from previous projects. Vendors must specify their Standard Industry Code, California State Contractor's License number, and provide information about any safety violations or serious incidents in the past seven to ten years. The RFP emphasizes the importance of comprehensive documentation, with sections dedicated to subcontractors, potential exceptions to contract terms, and proof of insurance. Contractors must carefully complete each exhibit, understanding that incomplete or inadequate submissions may result in disqualification from the bidding process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Business Information

Busi Legal Business Name:

ness Information

Date:

Address:

Street Address Suite #

City State ZIP Code

Contact: Title:

Phone: Email

Length of time in business:

Length of time at current location: Federal Tax No.

Names and titles of officers of the Business:

Is your firm incorporated? No Yes

Name and remittance address that will appear on invoices:

Is your firm a sole proprietorship doing business under a different name? No Yes

If yes, please indicate sole proprietorship name and the name you are doing business under:

California State Contractor’s License No.:

Department of Industrial Relations Registration No.:

RFP 3809 Page 1 of 8

EXHIBIT B

BUSINESS REFERENCES

Business References f Proposer Business Name:

or

Date:

Proposer shall provide a minimum of three (3) Customer References with three (3) or more years’ experience with the Proposer. Preferred references should be similar in size, scope, and complexity (to the contract requirements).

Reference 1 Name of Firm: Phone:

Address: Contact:

Project Title: Approx. Cost: $ Contact email:

Project Description:

Project Date: To:

Reference 2 Name of Firm: Phone:

Address: Contact:

Project Title: Approx. Cost: $ Contact email:

Project Description:

Project Date: To:

Reference 3 Name of Firm: Phone:

Address: Contact:

Project Title: Approx. Cost: $ Contact email:

Project Description:

Project Date: To:

RFP 3809 Page 2 of 8

EXHIBIT C

LIST OF SUBCONTRACTORS

Subcontractor #1 Information

Legal Business Name: Date:

Address:

Street Address Suite #

City State ZIP Code

California State Contractor’s License No.:

Department of Industrial Relations Registration No.

Subcontract Description:

Subcontractor #2 Information Legal Business Name: Date:

Address:

Street Address Suite #

City State ZIP Code

California State Contractor’s License No.:

Department of Industrial Relations Registration No.

Subcontract Description:

Subcontractor #3 Information Legal Business Name: Date:

Address:

Street Address Suite #

City State ZIP Code

California State Contractor’s License No.:

Department of Industrial Relations Registration No.

Subcontract Description:

RFP 3809 Page 3 of 8

EXHIBIT D

ADDITIONS, DELETIONS AND/OR EXCEPTIONS

Please state any and all Additions, Deletions and Exceptions that you are taking to any portion of this proposal. If not addressed below, then Eastern Municipal Water District assumes that the vendor will adhere to all terms and conditions listed.

District will issue an Agreement in its standard form to the successful firm(s) for the services contemplated herein; a copy of which is attached hereto and incorporated herein. Any deletion, exception, or modification taken to District contract terms and conditions will be evaluated, in addition to the specified criteria; and may, itself, result in non-acceptance by the District. Any request for deletion, exception, or modification, if so taken, must be submitted at the time of proposal. Any asserted trade secrets or other proprietary information must be identified on this exhibit with specific page references within the proposal and/or supplemental information.

RFP 3809 Page 4 of 8

EXHIBIT E

INSURANCE AFFIDAVIT

I, (Proposer/Company) have reviewed the Insurance Requirements (Rev. 05/2021) in its entirety and agree to furnish all insurance policies with designated limits, along with full endorsements, and waiver of subrogation, as stated in this Request for Proposal for the full term of the agreement.

I hereby agree to provide copies of insurance certificates, endorsements, and waiver of subrogation within fourteen (14) calendar days of the District’s notification of recommendation of award.

I understand and confirm that our firm is able to provide and maintain the coverage as specified.

Failure to maintain said coverage shall be sufficient cause for contract termination and shall result in termination of the awarded contract.

I understand that by signing this document, I (Proposer/Company) agree to all terms and conditions as stated in the Insurance Requirements (Rev. 05/2021).

☐ Check here if you DO NOT accept terms and conditions as stated in the Insurance Requirements (05/2021). Detail all Exceptions in, Additions, Deletions and/or Exceptions Form.

Authorized Representative’s Signature Name Authorized Representative’s Printed Name

Company Name Date

Mailing Address Telephone

City, State, Zip Code Email

RFP 3809 Page 6 of 8

EXHIBIT G

CONTRACTOR’S CAL/OSHA COMPLIANCE HISTORY AND SIC CODE

(This document is to be submitted with the proposal package) (rev. 10/08/18)

Date: Contractor’s Standard Industry Code:

Contractor’s Name: California State Contractor’s License #:

Address:

Contact Person: Phone No:

Please answer the following questions:

1. Has the contractor been cited by Cal/OSHA or any regulatory agency for a violation related to safety or environmental issues within the past seven (7) years?

No Yes

2. Within the past ten (10) years has the contractor had a serious incident or fatality on a job site?

No Yes

* If yes to # 1 or #2, please provide information specific to the incident(s) and action(s) taken to ensure that there is not a repeat violation, or incident(s) (attach additional sheets if needed)

Contractor’s Representative signature: Date:

FOR EMWD USE ONLY: Purchasing to forward to Risk Management for review

Date:

(Risk Management) Approved: No Yes

Reviewed by (Risk Management) (signature required)

RFP 3809 Page 7 of 8

EXHIBIT H

SUBMITTAL CHECK-OFF LIST

Item Required Submittals Checklist Check

Off

1 RFP Price Form

2 Proposer’s Business Information

3 Proposer’s Business References

4 List of Subcontractors

5 Additions, Deletions, and/or Exceptions

6 Product Specifications

7 Insurance Affidavit

8 CAL/OSHA Compliance History

9 Proof of Authorized Partnership

RFP 3809 Page 8 of 8

RFP #3809 PRICE FORM - PROJECT 1
RFP #3809 PRICE FORM PROJECT 2
Business Information
LIST OF SUBCONTRACTORS
ADDITIONS, DELETIONS AND/OR EXCEPTIONS
District will issue an Agreement in its standard form to the successful firm(s) for the services contemplated herein; a copy of which is attached hereto and incorporated herein. Any deletion, exception, or modification taken to District contract terms...
☐ Check here if you DO NOT accept terms and conditions as stated in the Insurance Requirements (05/2021). Detail all Exceptions in, Additions, Deletions and/or Exceptions Form.
(This document is to be submitted with the proposal package) (rev. 10/08/18)

SUBMITTAL CHECK-OFF LIST

Name:
Address:
Date:
City:
State:
ZIP Code:
Contact:
Phone:
in business:
current location:
undefined:
Names and titles of officers of the Business 1:
Names and titles of officers of the Business 2:
Names and titles of officers of the Business 3:
Is your firm incorporated: Off
Is your firm a sole proprietorship doing business under a different name: Off
Name_2:
Date_2:
Firm:
Phone_2:
Address_2:
Contact_2:
Description:
Date_3:
Firm_2:
Phone_3:
Address_3:
Contact_3:
Title_2:
Description_2:
Date_4:
Firm_3:
Phone_4:
Address_4:
Contact_4:
Title_3:
Description_3:
Date_5:
Name_3:
Date_6:
Address_5:
Contractors License No:
Registration No:
Subcontract Description:
Name_4:
Date_7:
Contractors License No_2:
Registration No_2:
Subcontract Description_2:
Name_5:
Date_8:
Address_7:
Contractors License No_3:
Registration No_3:
Subcontract Description_3:
supplemental information 1:
supplemental information 2:
supplemental information 3:
supplemental information 4:
supplemental information 5:
supplemental information 6:
supplemental information 7:
supplemental information 8:
supplemental information 9:
supplemental information 10:
supplemental information 11:
supplemental information 12:
supplemental information 13:
Requirements Rev 052021 in its entirety and agree to furnish all insurance policies with:
Check here if you DO NOT accept terms and conditions as stated in the Insurance: Off
Company Name:
Mailing Address:
City State Zip Code:
Authorized Representatives Printed Name:
Date_9:
Telephone:
Date_10:
Contractors Standard Industry Code:
Contractors Name:
California State Contractors License:
Address_8:
Contact Person:
Phone No:
Please answer the following questions 1 Has the contractor been cited by CalOSHA or any regulatory agency for a violation related to safety or environmental issues within the past seven 7 years No Yes 2 Within the past ten 10 years has the contractor had a serious incident or fatality on a job site No Yes If yes to 1 or 2 please provide information specific to the incidents and actions taken to ensure that there is not a repeat violation or incidents attach additional sheets if neededRow1:
Please answer the following questions 1 Has the contractor been cited by CalOSHA or any regulatory agency for a violation related to safety or environmental issues within the past seven 7 years No Yes 2 Within the past ten 10 years has the contractor had a serious incident or fatality on a job site No Yes If yes to 1 or 2 please provide information specific to the incidents and actions taken to ensure that there is not a repeat violation or incidents attach additional sheets if neededRow2:
Please answer the following questions 1 Has the contractor been cited by CalOSHA or any regulatory agency for a violation related to safety or environmental issues within the past seven 7 years No Yes 2 Within the past ten 10 years has the contractor had a serious incident or fatality on a job site No Yes If yes to 1 or 2 please provide information specific to the incidents and actions taken to ensure that there is not a repeat violation or incidents attach additional sheets if neededRow3:
Please answer the following questions 1 Has the contractor been cited by CalOSHA or any regulatory agency for a violation related to safety or environmental issues within the past seven 7 years No Yes 2 Within the past ten 10 years has the contractor had a serious incident or fatality on a job site No Yes If yes to 1 or 2 please provide information specific to the incidents and actions taken to ensure that there is not a repeat violation or incidents attach additional sheets if neededRow4:
Please answer the following questions 1 Has the contractor been cited by CalOSHA or any regulatory agency for a violation related to safety or environmental issues within the past seven 7 years No Yes 2 Within the past ten 10 years has the contractor had a serious incident or fatality on a job site No Yes If yes to 1 or 2 please provide information specific to the incidents and actions taken to ensure that there is not a repeat violation or incidents attach additional sheets if neededRow5:
Contractors Representative signature:
Date_11:
FOR EMWD USE ONLY:
Date Risk Management:
Reviewed by Risk Management:
signature required:
Check OffRFP Price Form:
Check OffProposers Business Information:
Check OffProposers Business References:
Check OffList of Subcontractors:
Check OffAdditions Deletions andor Exceptions:
Check OffQualifications and Experience:
Check OffProcess to Complete Work:
Check OffTimeframe to Complete the Work:
Check OffInsurance Affidavit:
Check OffCALOSHA Compliance History:
Check OffProof of Authorized Partnership:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Text7:
0:
1:
2:
undefined_2:
0:
0:
2:
1:
Title:
Email:
Text8:
0:
1:
2:
3:
4:
0:
1:
Email 1:
0:
1:
2:
Address_6:
1:
2:
0:
0:
1:

File details come from the government source that posted it. Updated .