1.06 SOW.pdf
PDF 179 KB Posted
- Attached to
- Foam-filled marine fenders
- Solicitation number
- N6817126QN041
About this file
Statement of Work Summary: GAETA, N31 Fenders
This Statement of Work (SOW) outlines the procurement and delivery of three new foam-filled marine fenders for the NATO pier at an Italian Navy base. The contractor's sole responsibility is to procure and deliver the fender systems; installation will be performed by government personnel. The fenders are intended to replace existing equipment purchased in 2015 that now exhibits wear and delamination, with delivery required within 120 days of contract award using Cost, Insurance, and Freight (CIF) terms to Gaeta, Italy. The receiving address is N62588: Nato Base/POL Pier - NSA Gaeta Port Ops Building 725, Via Lungormare Caboto N. 103, with deliveries accepted Monday through Friday between 0800 and 1600 local time, requiring five business days' advance notice to the point of contact, Pierre "Cheope" Saltarelli.
The three fender units must meet specific technical requirements: each must be a heavy-duty, foam-filled marine fender with closed-cell foam core and filament-reinforced polyurethane elastomer skin (black), with nominal dimensions of 11 feet diameter by 18 feet length, rated for high capacity/high energy absorption suitable for large naval vessels. Each complete system must include all required accessories: heavy-duty, hot-dip galvanized stud-link anchor chain with minimum 2.5-inch diameter, and all connecting hardware including shackles and swivels, appropriately sized and hot-dip galvanized. Government acceptance will be performed by Port Operations personnel within two business days of delivery via visual inspection to verify dimensions, physical condition, and presence of all required hardware, with formal acceptance required prior to payment certification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enclosure 2
Statement of Work (SOW)
Project: GAETA, N31 Fenders
GENERAL INFORMATION
1.0 Scope: The contractor shall procure and deliver three (3) new, foam-filled marine fenders.
These fenders are intended for use at the NATO pier, located on an Italian Navy base, to support the safe mooring, harboring, and refueling of United States Navy (USN) and allied naval vessels. This procurement action is to replace the current fenders which are in poor material condition. The contractor's responsibility is limited to the purchase and delivery of the specified items. Installation will be performed by government personnel and is not within the scope of this requirement.
2.0 Background: The current foam-filled fenders on the NATO pier fingers were purchased in
2015. Over the last decade, the fenders have worked well, but now show heavy signs of wear and tear, to include delaminating of the elastomer skins and deformation of the fender cylinder shape. To prevent any damage to harbor assets or the NATO pier, replacement of the fenders is needed.
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements & Tasks
General: The contractor shall procure and deliver three (3) complete, new, foam-filled fender systems in accordance with the specifications outlined in this SOW.
Fender Specifications: The three (3) fender units shall meet or exceed the following technical characteristics:
• Type: Heavy-duty, foam-filled marine fender with a closed-cell foam core. The fender must be unsinkable and remain functional even if the outer skin is punctured.
• Performance: High Capacity / High Energy Absorption, suitable for large naval vessels.
• Dimensions:
• Nominal Diameter: 11 feet (approximately 3.3 - 3.4 meters)
• Nominal Length: 18 feet (approximately 5.5 meters)
• Construction:
• Outer Skin: Filament-reinforced polyurethane (PU) elastomer skin.
• Color: Black.
Required Accessories: Each fender system shall be delivered complete with all hardware necessary for a through-chain installation:
• Chains: Heavy-duty, hot-dip galvanized (HDG) stud-link anchor chain with a minimum diameter of 2.5 inches.
• Fittings: All required connecting hardware, including but not limited to, heavy-duty shackles and swivels. All hardware must be appropriately sized for the fender and chain and be hot-dip galvanized (HDG).
4.0 Government Furnished Items & Services
Personnel: The Government will provide all personnel and equipment required for the offloading, staging, and installation of the fender systems upon delivery.
Services: The Government will be responsible for all customs clearance procedures and payment of any applicable duties or taxes at the port of entry in Italy.
5.0 Deliverables & Schedule
Deliverables: The contractor shall deliver the following items:
Quantity of 3, 11' x 18' Foam-Filled Fender System (Complete with chain & hardware)
Delivery Schedule:
• The complete order shall be delivered within 120 days of contract award.
• Delivery Terms: Cost, Insurance, and Freight (CIF) Gaeta, Italy (04024).
• Shipping Address:
• N62588: Nato Base/POL Pier - NSA Gaeta Port Ops BLDG 725
• Via Lungormare Caboto N. 103
• Marina Militare, USA
• Servizi Portuali/Logistics
• Gaeta (LT) Italy 04024
Coordination and Delivery Instructions:
• Point of Contact (POC): The contractor shall contact Pierre "Cheope" Saltarelli via email at pierrecheope.saltarelli.ln@us.navy.mil.
• Coordination: Contact shall be made at least five (5) business days prior to the planned delivery date to arrange for base access.
• Receiving Hours: Deliveries will only be accepted Monday through Friday, between
0800 and 1600 local time.
6.0 Inspection & Acceptance
6.1 Inspection: Government acceptance will be performed by Port Operations personnel within two (2) business days of delivery. The inspection will consist of a visual confirmation to verify fender dimensions, physical condition, and the presence of all required hardware as specified in
Section 3.0.
6.2 Acceptance: Formal acceptance shall be executed by a designated government representative upon successful completion of the inspection outlined in section 6.1. This acceptance is required prior to the certification of the contractor's invoice for payment.
https://www.google.com/url?q=mailto%3Apierrecheope.saltarelli.ln%40us.navy.mil
Item No.
Deliverable
Objective
Due
1 Upon arrival Inspection: Government acceptance will be performed by Port Operations personnel within two (2) business days of delivery. The inspection will consist of a visual confirmation to verify fender dimensions, physical condition, and the presence of all required hardware as specified in Section 3.0..
Within 2 Business
Days
6.0 Travel: N/A
7.0 Contractor’s Key Personnel: N/A
8.0 Security Requirements: N/A
9.0 Data Rights: N/A
10.0 Section 508 – Electronic and Information Technology Standards: N/A