Exhibit M_DID_Review_Guide.pdf

PDF 13 MB Posted

Attached to
General Services Administration (GSA) seeks to lease Office space in Santa Barbara, CA
Solicitation number
0CA3254
Issued by

About this file

This file is the Design Intent Drawing (DID) Review Guide published by the U.S. General Services Administration (GSA) as Exhibit M to a leasing agreement template. The guide serves as a comprehensive reference document to assist tenant agencies and GSA personnel in reviewing and understanding Design Intent Drawings during the space design phase of federal real estate projects.

The guide defines two levels of DID complexity: Level 1 covers basic design content including cover sheets, demolition plans, construction/partition plans, power/communications plans, furniture plans, and finish plans; Level 2 includes all Level 1 elements plus reflected ceiling plans, interior elevations, interior sections, partition wall sections, and door/hardware schedules. Each drawing type is systematically described with its required elements, such as general notes, key notes, symbol legends, room numbering, dimensions, and finish specifications. The document provides extensive supplemental materials including common electrical and furniture symbols, finish specification schedule examples, a project schedule example, and detailed reference guides covering applicable codes and standards (PBS-100, IBC, NFPA standards, ABAAS accessibility requirements), common DID abbreviations, lock functions, and door hardware terminology. A comprehensive glossary defines over 100 terms relevant to the DID process, and downloadable checklists for both Level 1 and Level 2 DIDs are provided to help reviewers systematically evaluate drawing submissions against agency requirements documents such as Programs of Requirements or Agency Specific Requirements.

View the file

Other files

File Type Posted
Exhibit G_GSA Form 1217 (Nov. 2016).pdf PDF
Exhibit J_GSAR Representation 552.270-33 (Nov. 2024).pdf PDF
Exhibit A_2026.6.16_L100.pdf PDF
Exhibit B_3516 Solicitation Provisions (Mar. 2026).pdf PDF
Exhibit C_Agency Special Requirements.pdf PDF
Exhibit C2_Adjacency Diagram_v.260616.pdf PDF
Exhibit D Security FSL Level III.pdf PDF
Exhibit C4_Millwork v.260616.pdf PDF
Exhibit E_3517B General Clauses (Apr. 2026).pdf PDF
Exhibit K_ RLP - Broker Project (May 2026).pdf PDF
Exhibit K1_Lease - Broker Project (May 2026).pdf PDF
Exhibit L_ Lease - CA Tax (May 2026).pdf PDF
Request for Lease Proposals (RLP).pdf PDF
Exhibit C1_Room List v.260616.pdf PDF
Exhibit C3_USCDC RDS v.260616.pdf PDF
Exhibit F_Form 1364 Proposal to Lease Space (Jan. 2023).pdf PDF
Exhibit H_Prelease Evaluation Form 12000 (May 2015).pdf PDF
Exhibit I_Seismic Forms A - F with Instructions.pdf PDF
RLP Amendment No 6.pdf PDF
RLP Amendment 5.pdf PDF
RLP Amendment 4.pdf PDF
RLP Amendment 3.pdf PDF
Exhibit E Form 3517B Dec. 2023.pdf PDF
RLP Amendment 2.pdf PDF
Exhibit D Form 3516 Dec. 2023.pdf PDF
RLP Amendment 1.pdf PDF
Exhibit E Form 3517.pdf PDF
Exhibit J Wage Determination.pdf PDF
Exhibit G From 1217.pdf PDF
Exhibit K For Ownership.pdf PDF
Exhibit L FAR-24.pdf PDF
Sensitive Information Notice.pdf PDF
Exhibit A Form L100.pdf PDF
Exhibit B I ASR.pdf PDF
0CA3254 SB RLP.pdf PDF
Exhibit B III ASR.pdf PDF
Exhibit C Security.pdf PDF
Exhibit D Form 3516.pdf PDF
Exhibit F Form 1364.pdf PDF
Exhibit H Form 12000.pdf PDF
Exhibit I Seismic.pdf PDF
Exhibit B II ASR.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A.

U.S. General Services Administration

EXHIBIT M

LESSOR:______GOVERNMENT:______

Table of Contents Introduction

Welcome!

Background

Purpose and Benefits

How to Use this Guide

Elements of Design Intent Drawing Set

Introduction

Design Intent Drawings (DID) Elements

1. Cover Sheet - Level 1 and Level 2

2. Demolition Plan (If applicable) - Level 1 and Level 2

3. Construction (Partition) Plan - Level 1 and Level 2

4. Power/Communications (Electrical) Plan - Level 1 and Level 2

5. Furniture Plan (generic) - Level 1 and Level 2

6. Finish Plan - Level 1 and Level 2

7. Reflected Ceiling Plan - Level 2

8. Interior Elevations - Level 2

9. Interior Sections - Level 2

10. Partition (Wall) Sections - Level 2

11. Door/Hardware Schedule - Level 2

Design Intent Drawing Set Examples

DID Level 1 Example

DID Level 2 Example

Supplemental Examples and Schedules

Common Electrical Symbols

Examples of common furniture symbols

Finish Specification Schedule Example (Finish Plan alternate)

DID Project Schedule Example

Typical Space Alteration Process

Reference Guides and Standards

Applicable Codes, Standards and Guidelines

Common DID Abbreviations

Common Lock Functions

Door Hardware Glossary of Common Terms

DID Checklists

DID Level 1 Checklist

DID Level 2 Checklist

DID Glossary of Terms

Introduction

Welcome!

Are you reading this Guide because you are part of a project team working with GSA? You may have been asked to review design drawings and provide input to ensure your agency gets the space that meets the needs and fulfills all the requirements provided to GSA at the beginning of either the lease process or your future move to or in Federal space.

If this sounds familiar, or if you currently find yourself involved in a space alteration project, this Guide will help make the review process more understandable and easier to navigate. The Guide will acquaint you with the look and layout of Design Intent Drawings (DID). You'll find a Glossary of Terms at the end to help you with all the new terminology you may hear during the meetings and workshops. You can find what you need by using the PDF reader ‘find’ function, or you can fully read through the Guide to understand the overall process. Either way, using this reference ensures your voice will be heard during the drawing review process. In addition, the Guide contains two DID Checklists (Level 1 and Level 2) that you may download and print to help you keep track of all the reviewed information in an orderly manner and make notes for items that need further review and clarification.

Background

In the summer of 2014, GSA conducted a lessons learned meeting with two of our client agencies to find out what went well, did not go well, and in what areas GSA might improve upon in subsequent projects. One concern centered on the review of DID submittals by agency personnel. Many did not fully understand what needed to be reviewed. Often, their primary work functions fell outside of facilities management, space planning, or architecture/engineering disciplines and they felt like they were trying to understand a new language with visuals like hieroglyphics.

To address this concern, GSA convened a diverse, cross-regional team to prepare a guide that project teams could use to help review basic and detailed DIDs. This document resulted from the team’s effort. For those with DID experience, some aspects of the Guide may be simplistic, but for others it will provide the first steps toward learning and understanding a new language, with examples and guidance to demystify common details found in DIDs (which may carry-over into architectural or engineering drawings).

GSA will post this Guide on our regional and national website, creating a collaborative environment for comments, clarifications and improvements, to refine the Guide and make it a useful tool for our clients as they review Design Intent Drawings.

Design Intent Drawing Review Guide | 1

Purpose and Benefits

This Guide serves several purposes. Altering or acquiring space is a multi-step process, whether reconfiguring existing space, or acquiring new space. This Guide offers a comprehensive checklist or ‘road map’ to aid both tenant agencies and GSA personnel that review Design Intent Drawing sets during the space design phase of a project. The document:

• Uses graphic examples and descriptive narratives to identify and describe key elements of a DID set, so the end-user may review DIDs and ensure the documents accurately reflect tenant requirements.

• Defines, describes, and explains the content included in DIDs for leased and federal space alterations.

• Provides a common language and expectation for the review process and outcome of a formal DID review, and establishes a checkpoint for missing items in a DID set.

• Defines the differences between Level 1 and Level 2 DIDs by setting parameters for projects with different complexity levels, by illustrating what should or should not be included in each type of DID set.

• Provides a list of the most commonly referenced codes and standards applicable to developing DIDs, and their respective website links.

• Provides a Glossary of Terms that relate to Design Intent Drawings.

The Guide will be useful for GSA customer agencies and GSA personnel whose experience, mission or normal course of work does not include reading design and construction drawings. Additionally, those familiar with the DID process may also benefit from the checklist's consistent format. Regions may determine which level of DID review is most appropriate for projects.

How to Use this Guide

During a DID review, this Guide should always be used in conjunction with the tenant agency’s design/construction requirements document (e.g. a Program of Requirements or Agency Specific Requirements).The Guide has been organized into Chapters so information may be easily located.

Throughout the Guide, words or phrases shown in blue bold typeface signify additional information (e.g.

definition, examples) may be found elsewhere in the Guide. Click on the bold word or phrase to take you directly to the additional information.

The Guide begins by breaking down the Elements of content for both Level 1 and Level 2 DID sets using written descriptions with graphic examples of each drawing sheet and/or cross-references to an example elsewhere in the Guide. Element descriptions are lettered in bold type and indicated on the drawing sheet example(s) below the descriptions. Click on the link below each example for an enlarged view of the sheet.

The designation of “Level 1” and “Level 2” for the two differing levels of content within DIDs has been established for the communication objective of this DID Review Guide, and are not an industry and/or governmental standard.

Design Intent Drawing Review Guide | 2

DID Checklists for both Level 1 and Level 2 drawing sets are also provided to complement this information.

GSA highly recommends reviewers fully read through the Guide before using the DID Checklists. Many references made on the Checklists are more fully explained in the Elements of a Design Intent Drawing Set section.

Supplemental examples, schedules, and other helpful drawing references are also provided in the Guide, including an extensive DID Glossary of Terms.

Design Intent Drawing Review Guide | 3

Note: while some Elements are commonly found in both Level 1 and Level 2 DID sets, there may be some differences in Element content between the two Levels.

Content differences are noted within each Element description, if applicable, with graphic examples for both Levels then provided, where appropriate. For example, Cover Sheets for a Level 1 and a Level 2 DID set contain the same information, so one graphic example is provided to represent both Levels.

Construction/Partition Plans for Level 1 and Level 2 , however, have a few differences, so graphic examples are provided for each one.

Elements of Design Intent Drawing Set

Introduction

Design Intent Drawings (DID) serve as a critical means to communicate a tenant agency’s space requirements for constructing and assembling interior spaces, cabinetry/millwork, the placement of furniture and other details throughout the space. They are produced after a final floor plan layout (usually a Block Plan; sometimes a Test Fit) is approved by the tenant agency, but prior to the Construction Documents (CD) development phase (see a project Typical Space Alteration Process overview in Supplemental Examples and Schedules section of this Guide). DIDs are drawn-to-scale and, although there is no one way to produce them. DIDs do follow established GSA and architectural/design industry graphic standards and conventions, both in how drawing sets are constructed, and the content they provide. The information in DIDs expresses the foundation of design criteria that will be further developed and engineered during the CD phase.

As referenced in this Guide, an ‘Element’ refers to design information organized and presented on an individual drawing sheet in a set of drawings, and pertaining to a specific aspect or discipline of the overall design package. For example, the Element information on a Power/Communications Plan is dedicated to expressing the electrical and data requirements of a space, while the Element information on a Finish Plan is dedicated to showing what finishes have been selected or approved and where they are to be located.

Elements of a Design Intent Drawing Set can typically be expressed in two “levels” of content during drawing set development. The more common Level 1 drawing set will show the required minimum level of design content. In some instances, however, a more inclusive Level 2 drawing set may be provided, which includes more detailed (but not engineered) design (and some construction) information. The Elements for Level 1 and Level 2 are presented here together, since some Elements are applicable for both.

While the DID Elements presented here are each individually presented on a separate drawing sheet in the drawing set, there may be instances (usually on a smaller project) where certain Elements may be shown

Design Intent Drawing Review Guide | 4 combined on a single sheet (e.g. Power/Communications information included on the Construction/Partition Plan sheet, Interior Sections included on the Interior Elevations sheet).

The drawing sheet content found in Level 1 and Level 2 drawing sets as discussed in this DID Review Guide, is as follows:

# Type of Drawing Level 1 DID Level 2 DID 1 Cover Sheet x x 2 Demolition Plan (if applicable) x x

3 Construction (or Partition) Plan x x 4 Power/Communications (or Electrical) Plan x x 5 Furniture Plan x x 6 Finish Plan x x 7 Reflected Ceiling Plan x

8 Interior Elevations x 9 Interior Sections x 10 Partition Types/Sections x 11 Door/Hardware Schedule x

Design Intent Drawing Review Guide | 5

Design Intent Drawings (DID) Elements

1. Cover Sheet - Level 1 and Level 2

The Cover Sheet, although basic in nature, serves as a very important page in a DID set of drawings. It typically shows:

a. The project name and location/address.

b. Name of the design contractor, GSA designer and/or other consultants involved in developing the DIDs.

c. An Index of Drawings in the set listed in the order they appear.

d. Dates of the initial and any revised DID submittals.

e. General Notes that set the standard for reference information applicable throughout the DID set, including applicable Codes and Standards that have jurisdiction over the design of the project.

And may include:

f. Total Usable Square Footage (USF) of the project.

Combined Level 1/Level 2 Cover Sheet Examples.

Click Cover Sheet - Level 1 and Level 2 to view larger.

Design Intent Drawing Review Guide | 6

2. Demolition Plan (If applicable) - Level 1 and Level 2

The Demolition Plan, in a DID set, is a drawn-to-scale floor plan that shows a horizontal section looking down through a building, typically at about three to four feet above the finished floor. This plan denotes all existing constructed elements and specifically highlights (usually in dotted line) any existing area/element (and/or sometimes finishes) that needs to be demolished or removed prior to beginning construction of the approved Construction Plan. A Demolition Plan is only needed if there are existing conditions to be removed before new construction can begin. The Demolition Plan typically shows:

a. General Notes that provide overall references to the drawing.

b. Key Notes that provide specific reference to tagged elements within the drawing.

c. A Symbol Legend that identifies specific symbols used in the drawing.

d. Total Usable Square Footage (USF) of the project.

Combined Level 1/Level 2 Demolition Plan Example.

Click Demolition Plan - Level 1 and Level 2 to view larger.

Design Intent Drawing Review Guide | 7

3. Construction (Partition) Plan - Level 1 and Level 2

The Construction Plan in a DID set is a drawn-to-scale floor plan that shows a horizontal section looking down through a building, typically at about three to four feet above the finished floor, and expresses a graphic representation of the constructed elements (e.g. partitions, doors, etc.) of a space. Furniture (in generic form) is not, typically, shown on the Construction Plan, but on a separate Furniture Plan. A DID Construction Plan typically shows:

a. General Notes that provide overall references to the drawing.

b. Key Notes that provide specific reference to tagged elements in the drawing.

c. A Symbol Legend that identifies specific symbols used in the drawing.

d. Total Usable Square Footage (USF) of the project.

e. Room/area names/numbers (and door numbers on a Level 2 set) for each room/open area; Numbering will typically be identified by the floor number, starting at the tenant agency suite entry and continuing clockwise (e.g. if on floor 11, Reception is #1101, with #1102, 1103, etc., continuing clockwise. Note: DID numbering does not, necessarily, correlate to a building-assigned suite number).

f. Column locations.

g. Door and window locations.

h. Critical dimensions.

i. Common areas (e.g. stairs, elevators, restrooms).

j. Nominal dimensions for wall/partition thicknesses.

k. On a Level 1 Construction Plan, new partitions are typically either tagged with a Key Note identifying each different construction type, or they are drawn using different patterns or line types that cross-reference a description of their construction in the drawing legend. (Note: Sometimes only partitions needing special construction [e.g. ballistic material, security mesh] are identified on the plan with a General Note, giving further reference to the tenant agency’s general and/or special requirements for detailed construction information).

l. On a Level 2 Construction Plan, new partitions are assigned a tag symbol (refer to Symbol Legend) with a letter or number that refers to a Partition Section drawing (located elsewhere in the drawing set) that shows how it is will be constructed.

m. On a Level 2 Construction Plan, Elevation markers noting locations of any built-in construction or millwork. The arrow on an elevation marker points to the object on the plan for which there is an elevation drawn elsewhere in the DID set. Numbers in the marker indicate the elevation drawing number and sheet location. (Note: In lieu of Elevations, Level 1 Construction Plans may note locations for built-in construction or millwork, and give direction that refers to the tenant agency for specific design/construction requirements).

Design Intent Drawing Review Guide | 8

Level 1 Construction (Partition) Plan Example.

Level 2 Construction (Partition) Plan Examples.

Click Construction (Partition) Plan - Level 1 or Level 2 to view larger.

Design Intent Drawing Review Guide | 9

4. Power/Communications (Electrical) Plan - Level 1 and Level 2

The Power/Communications Plan is a drawn-to-scale floor plan that shows all required power and communications outlet/receptacle types and locations. These plans typically show:

a. General Notes that provide overall references to the drawing.

b. Key Notes that provide specific reference to tagged elements in the drawing.

c. A Symbol Legend that identifies specific symbols used in the drawing (see Supplemental Examples and Schedules section for examples of industry Common Electrical Symbols).

Note: Power/Communications symbols are purposely drawn larger than in scaled reality in order to be more easily read.

d. Total Usable Square Footage (USF) of the project.

e. All standard and any specialty outlet/receptacle (e.g. cable TV, ISDN line, furniture mounted) types and locations.

f. Security requirement locations that require electrical connections (e.g. cameras, doorbell, an Aiphone-intercom system) may also be shown, if appropriate.

g. An Equipment Schedule may be included (details provided by agency) if specialty or extensive equipment power/communication needs exist.

Combined Level 1/Level 2 Power/Communications (Electrical) Plan Example.

Click Power/Communications (Electrical) Plan - Level 1 and Level 2 to view larger.

Furniture is not typically shown on the Power/Communications Plan unless specific furniture requires electrical/data connections (e.g.

workstations). If shown, furniture should be noted as included ‘for reference purposes, only’ and drawn in half-tone for easier reading. It should also be noted on the plan that outlets/receptacles located on furniture provide quantity and outlet type information, only. The furniture vendor is responsible for final locations.

Design Intent Drawing Review Guide | 10

5. Furniture Plan (generic) - Level 1 and Level 2

The Furniture Plan is a drawn-to-scale floor plan that shows the layout of all furnishings and equipment in generic form/configuration and provides initial definition of furniture needs in terms of type, size, and quantity. This may include systems furniture workstations, free-standing furniture or both, as well as basic ‘footprint’ locations of equipment (e.g. fax, copier). The Furniture Plan typically shows:

a. General Notes that provide overall references to the drawing.

b. Key Notes that provide specific reference to tagged elements in the drawing.

c. Total Usable Square Footage (USF) of the project.

d. Furniture needs in terms of location, type, size, and quantity.

e. Furniture groupings and access orientation.

f. Actual overall dimensions of furniture and equipment pieces.

And may include:

g. A Symbol Legend that identifies various pieces of furniture shown on the plan. (See Supplemental

Examples and Schedules section for examples of Common Furniture Symbols).

Combined Level 1/Level 2 Furniture Plan Example.

Click Furniture Plan (generic) - Level 1 and Level 2 to view larger.

Typically, this plan reflects new furniture and equipment, but may also include existing (in generic form), if tenant agency provides existing (size, quantity) information.

Design Intent Drawing Review Guide | 11

6. Finish Plan - Level 1 and Level 2

The Finish Plan is a floor plan with coded indicators showing where each selected finish will be applied. These include, but are not limited to finish materials for: flooring, cabinets, countertops, wall finish and wall base. The Finish Plan typically shows:

a. General Notes that provide overall references to the drawing.

b. A Symbol Legend that identifies specific symbols used in the drawing.

c. Total Usable Square Footage (USF) of the project.

d. A legend or schedule of selected finishes, specifying material, manufacturer, catalog number and color, and any other specific information for installation (e.g. carpet tile installation is quarter-turned).

e. An alpha-numeric designation on the schedule for each selected finish (e.g. CPT-1 = carpet selection #1) that is cross-referenced to each location on the Finish Plan where that finish will be applied.

f. Area/room finish (target) markers are placed on the plan wherever interior finishes will be applied. A finish marker is a divided symbol wherein alpha-numeric finish designations are noted to indicate application placement in a given room. The example in this Guide shows a circle with a triangle-shaped ‘arrow’ placed on each of the four sides. The circle denotes the floor finish, while each arrow denotes a wall finish and points to the wall where it will be applied. Note, while conceptually similar, finish marker graphics may vary, depending on the drafter. Refer to the Finish Legend for definition of the specific finish marker symbol that is used in the drawing set being reviewed.

g. Cabinetry/millwork (built-ins) finish (target) markers are placed on the plan where cabinetry/millwork is located. The example in this Guide shows a box format, with one or more (usually one to three) boxes that each denote a finish selection for different parts of a built-in element. For example: a three-box finish marker pointing to a pantry cabinet would include one box to denote the base cabinet finish, a second for the countertop finish and a third for the upper cabinet finish. While conceptually similar, finish marker graphics may vary, depending on the drafter. Refer to the Finish Legend for symbol definition specific to the drawing set being reviewed. Note, alternately, finishes for cabinetry/millwork are sometimes included on Elevation drawings (in a Level 2 set), rather than on the Finish Plan. In these instances, a General Note indicating this should be included on the Finish Plan, for reference.

Sometimes locations for application of finishes are denoted within a tabular spreadsheet format (typically called a Finish Specification Schedule), rather than shown on a Finish Plan. This type of finish application schedule lists each room/area by name/number along the left side of the grid, with columns across the top labeled for each wall surface (north, south, etc), floor, base, etc. that can be found in a given room. The respective alpha-numeric designation for each finish selection is then shown in the corresponding “box” where that finish will be applied within the office space. (See Supplemental Examples and Schedules section for an example of a Finish Specification Schedule.)

Design Intent Drawing Review Guide | 12

And may include:

h. Key Notes that provide specific reference to tagged elements in the drawing.

Combined Level 1/Level 2 Finish Plan Example.

Click Finish Plan - Level 1 and Level 2 to view larger.

Design Intent Drawing Review Guide | 13

7. Reflected Ceiling Plan - Level 2

The Reflected Ceiling Plan is a drawn-to-scale plan view of the ceiling and anything attached to it, such as light fixtures, and soffits. Note, it is not a mirrored or reversed image of the floor plan but, rather, the view one would see if looking down at a mirrored floor that reflects what is on the ceiling. Walls are shown as ‘cut through’ as are the headers above doors and windows. Anything at floor level is generally not shown. A Reflected Ceiling Plan typically shows:

a. General Notes that provide overall references to the drawing.

b. Key Notes that provide specific reference to tagged elements in the drawing.

c. A Symbol Legend that identifies specific symbols and fixtures used in the drawing.

d. Total Usable Square Footage (USF) of the project.

e. Ceiling grid location/size (Note: often the ceiling grid and fixture type is a building standard and any deviations, if allowed by the lessor/owner, will be a tenant expense).

f. Types of light fixture and their locations.

g. Any ceiling height changes.

h. Any soffit locations.

i. Any decorative or structural item that touches the ceiling.

j. Basic switch locations (where light fixture gets turned on).

Level 2 Reflected Ceiling Plan Example.

Click Reflected Ceiling Plan - Level 2 to view larger.

New or relocations of HVAC elements (exhaust fans, air vents, etc), sprinkler heads and/or emergency egress lighting and signs are part of CD and engineering development and not provided within the DID scope of work.

Existing locations, however, of these elements may be indicated within this drawing.

Design Intent Drawing Review Guide | 14

8. Interior Elevations - Level 2

Drawn at a larger scale than floor plans, interior elevations provide a pictorial view of built-in and/or architectural elements (e.g. cabinetry, transaction counters, and interior windows). Elevations express how a front, side, or back vertical surface will appear if the viewer stands directly facing the vertical surface. Interior Elevations typically show:

a. Basic structure of the built-in or architectural element in relation to the finished floor below and finished ceiling above.

b. Call-out notes that describe details shown on each elevation.

c. Vertical dimensions, shown in feet/inches (horizontal dimensions are typically on the Construction Plan and, therefore, omitted here, but may still be shown for clarity).

d. Base moldings, trims, door/window casings, etc.

e. Any step backs or other changes in the vertical plane of the elevation.

f. Hidden lines and section lines, if applicable (e.g. shelf location behind a closed cabinet door).

g. Most elevations will include vertical target markers that indicate where on the Elevation a drawing of a cut-through view (called a Section) has been done and the location within the DID set where that drawing can be found. Section target markers should be located on the Elevation drawing where a cut-through view will best illustrate relationships between significant components and show key details needed for construction.

h. Any complex item that cannot be fully articulated on the floor plan(s).

And may include:

i. General Notes that provide overall references to the drawing.

j. Key Notes that provide specific reference to tagged elements in the drawing.

k. Electrical cover plate locations for outlets and switches.

l. Finish Specification information, if not provided on Finish Plan.

Elevation drawings are not the same as Shop Drawings, which provide additional fabrication and/or installation detailed information and are typically produced by a construction contractor or specific manufacturer.

Design Intent Drawing Review Guide | 15

Level 2 Interior Elevations Example.

Click Interior Elevations - Level 2 to view larger.

Design Intent Drawing Review Guide | 16

9. Interior Sections - Level 2

Drawn at a larger scale than floor plans, DID Section drawings show an imaginary ‘vertical slice’ or cut-through view of a built-in element (e.g.

cabinets, millwork) for which a ‘front view’ detail has already been expressed in an Elevation drawing. Sections should ‘cut through’ the element where they can best illustrate the relationships between its significant components. Section drawings illustrate the basic construction details of how a built-in element will be constructed.

Section drawings typically shows:

a. Call-out notes that describe details shown on each Section.

b. Vertical and depth dimensions.

And may include:

c. Designation of finish selections and applications (if not shown on

Finish Plan).

d. General Notes that provide overall references to the drawing.

e. Key Notes that provide specific reference to tagged elements in the drawing.

Level 2 Interior Sections Example.

Click Interior Sections - Level 2 to view larger.

Section drawings are not the same as Shop Drawings, which provide additional fabrication and/or detailed installation information, and are typically produced by a construction contractor or specific manufacturer.

Design Intent Drawing Review Guide | 17

10. Partition (Wall) Sections - Level 2

Drawn at a larger scale than floor plans, elevations and sections, partition sections are a type of section drawing that provides a cut through view of a particular wall/partition construction ‘type’ (per locations denoted on the Construction Plan). Sometimes referred to as a wall ‘assembly.’ Each partition type is assigned with a letter (e.g.

Type A). Partition Section drawings typically show:

a. General Notes that provide overall references to the drawing.

b. Materials used for partition construction.

c. How a partition type is constructed in relation to the existing structure (called the floor deck or slab) above. (e.g. slab to slab, anchored to underside of deck).

d. Whether or not a partition type has a Sound Transmission Class (STC) rating. (Usually noted with an STC number and illustrated by sound attenuation batt insulation in the wall cavity).

e. Finished floor to finished ceiling dimension denoted or referenced.

f. Whether or not a partition type has a fire rating (typically only used on demising walls).

g. Any specialty construction required within partition construction (e.g. expanded metal mesh, ballistic panel).

Level 2 Partition (Wall) Sections Example.

Click Partition (Wall) Sections - Level 2 to view larger.

While partition thicknesses on the Construction Plan are typically drawn in nominal dimensions, Partition Sections are drawn at their actual dimensioned thickness (e.g. plan partitions drawn at a nominal 5” thick have an actual Section construction dimension of 4 7/8”). Finishes are not denoted on Partition Section drawings.

Design Intent Drawing Review Guide | 18

11. Door/Hardware Schedule - Level 2

The Door/Hardware Schedule provides detailed information in tabular format. Each door is identified by the number assigned to it on the Construction Plan, which corresponds to the room number into which it opened (e.g. the door into room #101 will be door #101). Rooms with multiple doors are further defined using an alpha designation (e.g. door #101A, #101B). Door/Hardware Schedules typically show:

a. Elevations of the different door Types used throughout the space with alpha designations assigned to each Type (e.g. Type A – single door, Type B – double door with a sidelight).

b. An ordered listing of assigned door Types and Door Numbers (Door No.) as described above.

c. Dimensions of each door opening.

d. Door construction material (e.g. hollow core wood, glass, steel) and the generic finish (e.g. stain, paint) to be used for each door.

e. Door frame construction material (e.g. hollow metal) and the generic finish (e.g. paint) to be used for each door frame.

f. Type of Hardware Set (see below) assigned to each door.

g. Additional (numbered) notes (under Remarks) for any special instructions or requirements (e.g. fire rated, existing door to remain, kickplate) for each, as applicable.

And may include:

h. General Notes that provide overall references for the Schedule.

i. Key Notes referenced to specific doors in the Schedule.

The other key section of the Door/Hardware Schedule is the Hardware (type) Descriptions, which are typically in tabular format elsewhere on the same drawing sheet. Each different type of Hardware Set (Hdwe Set) noted in the Hardware Descriptions is assigned an alpha-numeric designation (e.g. HW-1).

Hardware Sets that are similar, but have a minor difference (e.g. two sets are the same except one has a closer, one doesn’t) are listed separately, and further defined by assigning an alpha designation (e.g. HW-1A, HW-1B). Hardware descriptions include, but are not limited to:

j. Number of hinges needed per door (based on height) and if they’re removable or non-removable.

k. Type of lockset function to be used for each Hardware Type (see Reference Guides and Standards section for examples of Common Lock Functions).

l. Type of door closer (if applicable).

m. Electric strike (if applicable).

n. Any specialty hardware requirement (e.g. magnetic alarm switch, security exit device, hold open device).

Design Intent Drawing Review Guide | 19

Level 2 Door/Hardware Schedule Example.

Click Door/Hardware Schedule - Level 2 to view larger.

Design Intent Drawing Review Guide | 20

Design Intent Drawing Set Examples

DID Level 1 Example

Click full set of DID Level 1 Example to view larger.

Cover Sheet

Demolition Plan

Construction (Partition) Plan

Power/Communications (Electrical) Plan

Furniture Plan

Finish Plan

DID Level 2 Example

Click full set of DID Level 2 Example to view larger.

Cover Sheet

Demolition Plan

Construction (Partition) Plan

Power/Communications (Electrical) Plan

Finish Plan

Reflected Ceiling Plan

Interior Elevations

Interior Sections

Partition (Wall) Sections

Door/Hardware Schedule

Design Intent Drawing Review Guide | 21

Supplemental Examples and Schedules Common Electrical Symbols

Symbols Descriptions

Wall mounted duplex outlet

Wall mounted quadruplex outlet

Wall mounted 20 amp, 120v separate circuit duplex outlet

Wall mounted telephone outlet

Wall mounted data outlet

Wall mounted tele/data outlet

Floor mounted duplex outlet

Floor mounted quadruplex outlet

Floor mounted telephone outlet

Floor mounted data outlet

Floor mounted tele/data outlet

Ground fault interrupter

Wall mounted proximity (key-card) reader at 48"

Ceiling mounted security camera

Door bell

Doorbell chime

Cable TV feed

Duress alarm/panic button

Wall-mounted electrical junction box with feed to system furniture base raceway

Wall-mounted data/communications junction box with feed to system furniture base raceway

Floor-mounted power junction box with feed to system furniture base raceway

Floor-mounted data/communications junction box with feed to system furniture base raceway

Note: If agency-specific symbols are used, refer to Symbol Legend on Power/Communications Plan for details.

Design Intent Drawing Review Guide | 22

Examples of common furniture symbols

Symbols Descriptions

Office task chair with casters

Office pull-up chair

Lounge chair

3-cushion sofa

L-shaped workstation

U-shaped workstation

Vertical file cabinet

Horizontal file cabinet

Round meeting table

Boat-shaped conference table

Design Intent Drawing Review Guide | 23

Finish Specification Schedule Example (Finish Plan alternate)

Click Finish Specification Schedule Example to view larger.

Design Intent Drawing Review Guide | 24

DID Project Schedule Example

Click DID Project Schedule Example to view larger.

Design Intent Drawing Review Guide | 25

Typical Space Alteration Process

While Design Intent Drawings (DID) are the focus of this Guide, a brief overview of the main steps involved in a typical space alteration project is provided, below, giving broad-brush insight into how a project progresses and where DIDs occur in the overall process.

1. Requirements Development

2. Space is awarded

3. Block Plans are prepared

4. Design Intent Drawings - may include a DID workshop or Design Charrette

5. Pre-Design conference/meeting

6. Schematic Designs (SD) initial interpretation of DIDs 35% complete

a. Revisions following comments

b. Review outline specifications

c. Review proposed product submittals

7. Design Development Document (DD) 70% complete

a. Revisions following comments

b. Review outline specifications

c. Review proposed product submittals

8. Pre-Final Construction Documents (CD) 90% complete

a. Revisions following comments

9. Construction Documents (CD) 100%

a. Review for completeness and inclusion of all prior comments

b. Review Specifications

c. Review Product Submittals

10. Construction/Build-out

11. Occupancy

Design Intent Drawing Review Guide | 26

Reference Guides and Standards

Applicable Codes, Standards and Guidelines

Design Intent Drawings (and any additional or subsequent drawings developed by the Architect and Engineer of Record) shall comply with the following codes and standards. The current edition of each applicable code and standard at the time of design contract award shall apply. Users of this Guide may obtain more detailed information from a subject matter expert (SME) regarding codes, standards or guidelines by contacting their primary GSA representative.

• The Facility Standards for the Public Building Service (PBS-100) http:// www.gsa.gov/portal/content/104821

• Agency Specific Requirements (ASR) or Program Of Requirements (POR)

• One of the following nationally recognized model building codes:

• International Building Code (IBC)

• International Congress of Building Officials (ICBO)

• State Specialty and Structural codes

• Requirements of Authorities Having Jurisdiction (AHJ) GSA Regional and Local City/County officials http://www.gsa.gov/portal/category/21056

• Fire and Life Safety - National Fire Protection Association (NFPA72)

• The egress requirements of the NFPA Life Safety Code (NFPA 101)

• The requirements of the Architectural Barriers Act Accessibility Standard (ABAAS), most current edition.

Wherever the terminology (ABA) occurs in this set, reference is made to the Architectural Barriers Act Accessibility Standard.

http://www.access-board.gov/guidelines-and-standards/buildings-and-sites www.gsa.gov/portal/category/21630

• All applicable state and local building codes

When and/or where applicable, the most current edition of these standards or guidelines may also apply:

• Historic Preservation http://www.gsa.gov/portal/category/21506

• Leadership in Energy & Environmental Design (LEED) http://www.gsa.gov/portal/category/21083

• National Environmental Policy Act (NEPA) Desk Guide http://www.gsa.gov/portal/content/104676

• Leasing Desk Guide http://www.gsa.gov/portal/content/163635

Design Intent Drawing Review Guide | 27 http://www.gsa.gov/portal/content/104821 http://www.gsa.gov/portal/content/104821 http://www.gsa.gov/portal/category/21056 http://www.access-board.gov/guidelines-and-standards/buildings-and-sites http://www.gsa.gov/portal/category/21506 http://www.gsa.gov/portal/category/21083 http://www.gsa.gov/portal/content/104676 http://www.gsa.gov/portal/content/163635

Common DID Abbreviations Design Intent Drawing sets often use industry-common abbreviations, similar to those seen in Construction Documents, although not as extensively. Commonly used DID abbreviations include, but are not limited to:

ABV Above AFF Above Finished Floor ALT Alternate ARCH Architect BLDG Building CD Construction Document CL Center Line CLG Ceiling

COL Column CONT Continuous DEMO Demolition DIA Diameter DIM Dimension DN Down D/W Dishwasher DWG Drawing

ELEV Elevation EQ Equal EQUIP Equipment EST Estimate EXIST Existing EXT Exterior FIN Finish FIXT Fixture

FLR Floor GA Gauge GC General Contractor GFI Ground Fault Interrupt GL Glass GYP Gypsum (Board) HC Hollow core HDW Hardware HGT Height HOR Horizontal

HVAC Heating, Ventilation & Air Conditioning INT Interior J-Box Junction box JCT Junction LAM Laminate LAV Lavatory LTG Lighting MECH Mechanical

MFG Manufacturing MTL Metal (steel) MUL Mullion NIC Not In Contract NTS Not to scale NOM Nominal OC On center OH Overhead

OPNG Opening PWR Power REF Refrigerator RMV Remove SC Solid core SCHED Schedule SECT Section SIM Similar SPECS Specifications SQ FT Square feet

SQ IN Square inches STC Sound Transmission Coefficient STD Standard SYS System TYP Typical VIF Verify in field WC Toilet (water closet) WD Wood

Design Intent Drawing Review Guide | 28

Common Lock Functions

Door/Hardware specifications include a “function” that indicates how a lockset needs to operate for a given location. Commonly used lock functions include, but are not limited to:

Classroom Lockset: Inside lever always unlocked and operable. Outside lever locked and unlocked by key only. Key retracts latch bolt. Common applications: classrooms, public entry doors, any room usually open, but locked during off hours, requiring locking ability by authorized persons only.

Exit Lockset: Unlocked by inside lever only. Outside lever always locked, preventing re-entry. Common applications: emergency exit doors, or any door requiring egress access, but preventing re-entry.

Dummy Trim: Dummy trim is a non-functioning door pull/lever. Half dummy is for one side of a door. Full dummy is for both sides of a door. Common applications: closets, non-active door of a double door entry, or any door requiring a “pull” function only.

Office Function Set: Inside lever always unlocked and operable. Outside lever locked by key from outside or by depressing and/or turning a button on the inside. When outside lever is locked, a key is used to retract the latch bolt. Common applications: office doors or any room requiring both locked and unlocked options.

Passage Function Lockset: Both levers always unlocked and free to operate at all times on either side of the door. Either lever retracts latch. Common applications: closets, stairways, or any room that does not require locking.

Privacy Lockset: Inside lever always unlocked and operable. Outside lever can be locked by depressing and/or turning a button on the inside. When locked, outside can be (overridden) unlocked by use of a simple tool (e.g. allen key, small screwdriver). This is usually referred to as ‘emergency release.’ Commercial versions of this may automatically unlock inside push button upon closing the door. Common applications:

single-use restrooms, changing rooms.

Storeroom Lockset: Inside lever always unlocked and operable and retracts latch bolt. Outside lever always locked, with entry accessed by key use. It is often paired with a door closer to assure door closed when not in use. Common applications: storage rooms, computer rooms, any access controlled door (with an electric strike, if electric key card/keypad is used), or any other space requiring authorization to access.

Design Intent Drawing Review Guide | 29

Door Hardware Glossary of Common Terms

Active Leaf: The operation side or active leaf of a double door system to which the lockset is installed and normal passage expected.

Astragal: A vertical member attached to the closing stile edge of one or both doors of a pair of doors covering the clearance gap to provide a weather seal, minimize light passage between the doors, or slow the smoke or flame passage during a fire. Some astragals overlay; others meet at the centerline of the gap.

Ball-bearing Butt Hinge: A hinge equipped with ball bearings between the hinge knuckles or hinge pin loops, to reduce friction.

Butt Hinge: A type of hinge designed to be mortised into both the door edge and the frame.

Construction Core: A temporary interchangeable or removable core designed for use during the construction phase of a building. The cores are normally keyed alike and, upon completion of construction, they are to be replaced by the permanent system’s cores.

Coordinator: A mechanism used on a pair of doors equipped with door closers to control the order in which they close. Often used with overlapping astragals or with panic hardware that requires one door to close before the other.

Core: The central part of a cylinder which is rotated by a key to operate the lock.

Crash Bar: A cross bar or level of an exit device which operates as a push bar to release the lock. Typically used to provide egress in an emergency situation.

Cylinder: The cylindrically shaped part of a lock assembly that contains the tumbler mechanism and the keyway, and permits only the correct key to enter and turn to operate the locking mechanism.

Deadbolt: A lock bolt, usually rectangular in shape, that projects into a hole provided in the strike and is operated by a key or turnknob, rather than a spring action.

Deadlatch: A latchbolt having a beveled end that incorporates a spring-activated feature, called a guardbolt, which automatically locks the projected latchbolt against return by end pressure and prevents ‘jimmying’ of the latchbolt. The latchbolt and guardbolt retract together when the inside door lever is turned.

Deadlock: A lock equipped with a deadbolt.

Dogging Device: A mechanism on an exit device, which holds the crash bar in a fully depressed (unlocked) position.

Door Closer: A device either attached on the surface or mortised into the top of a door to regulate and control its closing action.

Door Holder: A device that secures a door in selected open positions.

Design Intent Drawing Review Guide | 30

Door Jamb: The vertical (side) sections of a door frame onto which a door is secured with hinges and where the strike for the closing hardware is located.

Door Pull: A handle or grip, usually mounted on a plate, attached to a door to facilitate opening and closing.

Door Stop: A device to limit the opening swing of a door. May also refer to the projections along the top and sides of a doorframe against which the door closes.

Double door system: An entrance or exit with two doors in one door frame. One is considered active, where normal passage and the lockset is expected and the other is called idle or inactive and is normally secured with flush bolts. The inactive side opens when a larger opening is necessary or desired.

Dummy Trim: Trim only, without a lock. Usually used on the inactive leaf of a double door.

Electric Hinge: A hinge designed to pass electric wires from the frame to the door for use in an electric-controlled lock.

Electric Strike: An electrically operated device that replaces a conventional lock strike plate and allows the door to be opened from a remote location or by special access equipment (e.g. card reader, push-button release switch).

Escutcheon Plate: A protective or ornamental, surface-mounted cover plate with opening for the lever handle, core, cylinder and key, etc.

Exit Device: Also known as Panic Hardware. A door-locking device always operable from the inside of a building or space by pressing on a crash bar, which releases the locking bolt or latch.

Flush Bolt(s): A door bolt installed so the operating handle is flush with the edge of the door; usually installed at the top and bottom of an inactive leaf of a double door.

Gasket: A material or mechanical seal that fills the space around the perimeter, head, and jamb of a door.

Used for sound control, light infiltration, smoke and fire-stopping, etc.

Hand: See Swing.

Hinge: Two metal plates that each have loops formed along one edge that engage together and rotate around a common pivot rod or ‘pin.’ Serves to suspend or ‘hang’ a door, allowing it to swing or move.

Hollow Core Door: A door constructed with space between two exterior facing sheets. The spacing and material used to separate the sheets may vary.

Hollow Metal: Generally refers to doors or door frames, fabricated from cold formed metal sheets (usually steel), without other solid materials.

Inactive Leaf: Also known as idle leaf. The leaf of a pair of doors (also called a double door) that opens only after the active leaf is opened (or is sometimes kept stationary) and to which the lock strike is fastened to receive the latch of the active door.

Jamb: See Door Jamb

Design Intent Drawing Review Guide | 31

Kick Plate: A protective plate applied on the lower part of a door to protect the door from being marred.

Latchbolt: A beveled, spring-activated bolt that retracts when it engages the lip of the strike plate, and then automatically extends into a hole provided in the strike once the door is fully closed. A latchbolt typically retracts when the door lever is turned and may or may not include a dead-locking feature.

Leaf (in a pair of doors or double door): One of the two doors forming a double door.

Lever Handle: A horizontal, bar-like grip on a lockset or auxiliary lock.

Lockset: A complete lock assembly that includes the lock or latch mechanism, strike plate, and trim (levers, rose, escutcheons).

Master Key: A single key that operates multiple locks, each of which will also operate with its own individual key.

Mortised: An opening or cutout made to receive a lock or other hardware.

Non-Removable Hinge: In DID hardware descriptions, this refers to a high-security type of hinge with a hinge pin constructed so that it cannot be removed like a regular hinge pin. They are often used on doors that swing out into public spaces.

Panic Hardware: See Exit Device.

Rail: The horizontal framing member of a door which extends fully between the stiles.

Rose: Also known as a rosette. An ornament or bearing surface for a door handle; usually mounted against the surface of the door.

Silencer: A small piece of resilient material attached to the door stop on a doorframe to cushion the door when it closes against it.

Stile: One of the two vertical framing members of a door.

Strike: A metal plate or box attached or mortised into a door jamb to receive a door latch or bolt in order to secure the door closed; sometimes called a ‘keeper.’

Swing: Also known as hand of a door. The opening direction of a swinging door. A door hinged on the right that opens inward is a right-handed door. If it opened outward, it would be a right-handed reverse door.

Similarly, a door hinged on the left that opens inward or outward is a left-handed or left-hand reverse door, respectively.

Throw: The distance that a deadbolt or latchbolt projects out from the door edge when in the locked position.

Trim: A decorative member applied to the face of a door jamb. Often used to cover or hide the joint between a doorframe and the adjacent wall surface. Also refers to decorative and/or functional components of a lockset (e.g. lever, rose, escutcheon), or decorative and/or functional components applied to a door to assist in its operation (e.g. push plate, pull plate, pull, kickplate).

Design Intent Drawing Review Guide | 32

DID Checklists

DID Level 1 Checklist

Click DID Level 1 Checklist to download.

DID Level 2 Checklist

Click DID Level 2 Checklist to download.

Note: During a DID review, the DID Checklist should always be used in conjunction with the tenant agency’s design/ construction requirements document (e.g. a Program of Requirements or Agency Specific Requirements).

Design Intent Drawing Review Guide | 33

DID Glossary of Terms Access Door: A hinged or removable panel that when opened provides access to an area such as a mechanical shaft, allowing for the inspection and servicing of its internal components. (Also called an access panel)

A/E: Refers to the Architectural and Engineering design services.

Agency Specific Requirements (ASR): Also known as Program of Requirements (POR). A document that defines an agency’s specific space requirements for size and number of enclosed and open spaces, IT requirements, security requirements, floor and wall finishes, column spacing, door types, and sound mitigation requirements. Other more specific requirements may be included depending upon agency and complexity of project.

Alteration: Any action that will change the configuration of existing space, including minor items such as: add or replace a lock, install electrical outlets or re-paint and re-carpet the space during the term of occupancy.

ANSI-BOMA Office Area (ABOA): Also known as Usable Square Feet (USF).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .