This solicitation is for the construction of a new parking garage at the Wilkes-Barre VA Medical Center campus. The project includes providing all labor, materials, tools, equipment, permits, testing and reports to construct a structure accommodating approximately 435 vehicles, according to the drawings and specifications. The magnitude of the VA project is between $10-20 million. This procurement is set aside for Service-Disabled Veteran-Owned Small Businesses utilizing tiered evaluation procedures down to the large business tier. The contractor shall be responsible for proper worker classification and wage/hour law compliance. Pricing shall be in whole dollars only. The solicitation may be canceled before award but after closing if in the government's best interest. The Department of Veterans Affairs Veterans Health Administration VISN 4 is the agency.

View the file

Other files for this federal contract opportunity

Other files attached to Y1LZ--693-222 | Parking Structure Solicitation Amendment 2, newest first.
File Type Posted
015000TempFacilitiesControls.pdf PDF
084113 Aluminum Storefront Systems.pdf PDF
097753 Living Wall System.pdf PDF
074515 Composite Wall Panel.pdf PDF
VMAC_Sketch_SKE-1.pdf PDF
S02 Solicitation 36C24420R0075 AMD 0001.pdf PDF
P03 JA Tyco SimplexGrinnell.pdf PDF
P03 JA Johnson Controls.pdf PDF
36C24420R0075_4.docx DOCX document
2903 312000 Earthwork 02.pdf PDF
280800.pdf PDF
262726.pdf PDF
230800.pdf PDF
221400.pdf PDF
221300.pdf PDF
220523.pdf PDF
210800.pdf PDF
210512.pdf PDF
111200 Parking Control Equipment.pdf PDF
099600 High Performance Coatings.pdf PDF
079020 Garage Waterproofing Systems.tha.pdf PDF
078410 Through Penetration Firestop Systems.pdf PDF
071113 Bituminous Dampproofing.pdf PDF
061000 Rough Carpentry.pdf PDF
055000 Metal Fabrications.pdf PDF
051200 Structural Steel Framing.pdf PDF
034500 Precast Architectural Concrete.pdf PDF
017900 Warranties_Single Prime.pdf PDF
017823 Operation and Maintenance Data_Single Prime.pdf PDF
015000 Temporary Facilities _ Controls_Single Prime.pdf PDF
014535.docx DOCX document
013100 Project Coordination_Single Prime.pdf PDF
012800 Field Engineering_Single Prime.pdf PDF
012600 Modification Procedures_Single Prime.pdf PDF
000000 Table of Contents_Single Prime 02.docx DOCX document
Arch Dwg 11-16.pdf PDF
S02 Dwg C2-E2.pdf PDF
S02 Parking Structure List of Dwgs.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
EXHIBIT A - Past Performance Relevancy Questionnaire.docx DOCX document
334000 Storm Sewer Utilities.pdf PDF
316326 Drilled Caissons.pdf PDF
312319 Dewatering.pdf PDF
280526.pdf PDF
264313.pdf PDF
280500.pdf PDF
260533.pdf PDF
260519.pdf PDF
260511.pdf PDF
230711.pdf PDF
Show all 50

Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Parking Garage Project Number 693-222 Department of Veterans Affairs Wilkes-Barre, Pennsylvania

099123-1

SECTION 099123 – PAINTING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes surface preparation and field painting of exposed exterior and interior items and surfaces.

1. Surface preparation, priming, and finish coats specified in this Section are in addition to shop priming and surface treatment specified in other Sections.

B. Paint exposed surfaces, except where these Specifications indicate that the surface or material is not to be painted or is to remain natural. If an item or a surface is not specifically mentioned, paint the item or surface the same as similar adjacent materials or surfaces. If a color of finish is not indicated, Architect will supply a color selection.

1. Painting includes field painting of exposed bare and covered pipes and ducts (including color coding), hangers, exposed steel and iron supports, and surfaces of mechanical and electrical equipment that do not have a factory-applied final finish.

C. Do not paint prefinished items, concealed surfaces, finished metal surfaces, operating parts, and labels.

1. Prefinished items include the following factory-finished components:

a. Architectural woodwork, if applicable.

b. Elevator entrance doors and frames.

c. Elevator equipment.

d. Louvers and Vents.

e. Parking control equipment.

f. Light fixtures.

2. Concealed surfaces include walls or ceilings in the following generally inaccessible spaces:

a. Foundation spaces.

b. Furred areas.

c. Ceiling plenums.

d. Utility tunnels.

e. Pipe spaces.

f. Duct shafts.

099123-2

g. Elevator shafts.

3. Finished metal surfaces include the following:

a. Anodized aluminum.

b. Stainless steel.

c. Chromium plate.

d. Copper and copper alloys.

e. Bronze and brass.

4. Operating parts include moving parts of operating equipment and the following:

a. Valve and damper operators.

b. Linkages.

c. Sensing devices.

d. Motor and fan shafts.

5. Labels: Do not paint over UL, FMG, or other code-required labels or equipment name, identification, performance rating, or nomenclature plates.

D. Related Sections include the following:

1. Division 5 Sections for shop priming of metal substrates with primers specified in this Section.

2. Division 5 Section "Structural Steel" for shop priming structural steel.

3. Division 5 Section "Metal Fabrications" for shop priming ferrous metal.

4. Division 8 Section "Steel Doors and Frames" for factory priming steel doors and frames.

5. Division 9 Section “High Performance Coatings” for steel and/or metals exposed to the exterior.

6. Division 32 Section "Pavement Markings" for traffic-marking paint.

1.3 DEFINITIONS

A. General: Standard coating terms defined in ASTM D 16 apply to this Section.

1. Flat refers to a lusterless or matte finish with a gloss range below 15 when measured at an 85-degree meter.

2. Eggshell refers to low-sheen finish with a gloss range between 20 and 35 when measured at a 60-degree meter.

3. Semigloss refers to medium-sheen finish with a gloss range between 35 and 70 when measured at a 60-degree meter.

4. Full gloss refers to high-sheen finish with a gloss range more than 70 when measured at a 60-degree meter.

1.4 SUBMITTALS

A. Product Data: For each paint system indicated. Include porous fillers and primers.

1. Material List: An inclusive list of required coating materials. Indicate each material and cross-reference specific coating, finish system, and application.

099123-3

Identify each material by manufacturer's catalog number and general classification. Submit in same format as specification.

2. Manufacturer's Information: Manufacturer's technical information, including label analysis and instructions for handling, storing, and applying each coating material.

3. Certification by the manufacturer that products supplied comply with local regulations controlling use of volatile organic compounds (VOC’s).

B. Colors: Match Architect’s color selections.

C. Samples for Verification: For each color and material to be applied, with texture to simulate actual conditions, on representative Samples of the actual substrate.

1. Submit 4 sets of samples of each final color and finish.

D. Qualification Data: For firms and persons specified in the “Quality Assurance” Article to be demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.

E. Certifications:

1. Furnish a letter from the paint manufacturer or their factory representative certifying that the paint system proposed for this project are equal to or better than the specified systems in appearance and performance levels. Submit proof of equivalency for approval including generic type, descriptive information, VOC content, performance data, solids by volume, and recommended film thickness.

Submittals not accompanied by this certification will be returned, “REJECTED.”

F. Coating Maintenance Manual: Upon conclusion of the project, the Contractor or paint manufacturer/supplier shall furnish a coating maintenance manual, such as Sherwin- Williams “Custodian Project Color and Product Information” report or equal. Manual shall include an Area Summary with finish schedule, Area Detail designating where each product/color/finish was used, product data pages, Material Safety Data Sheets, care and cleaning instructions, touch-up procedures, and color samples of each color and finish used.

1.5 QUALITY ASSURANCE

A. Applicator Qualifications: A firm or individual experienced in applying paints and coatings similar in material, design, and extent to those indicated for this Project, whose work has resulted in applications with a record of successful in-service performance.

B. Source Limitations: Obtain block fillers and primers for each coating system from the same manufacturer as the finish coats.

C. Benchmark Samples (Mockups): Provide a full-coat benchmark finish sample for each type of coating and substrate required. Comply with procedures specified in PDCA P5. Duplicate finish of approved sample Submittals.

1. Architect will select one room or surface to represent surfaces and conditions for application of each type of coating and substrate.

099123-4

a. Provide mock up of first and second coats of block filler or primer for approval of application.

b. Wall Surfaces: Provide samples on at least 100 sq. ft.

c. Small Areas and Items: Architect will designate items or areas required.

D. Apply benchmark samples, according to requirements for the completed Work, after permanent lighting and other environmental services have been activated. Provide required sheen, color, and texture on each surface. Where materials are being applied over previously painted surfaces, apply mock up samples and perform field testing to check for compatibility, adhesion, and film integrity of the new materials to existing painted surfaces. Report in writing any condition that may affect application, appearance, or performance of the specified coating system.

a. After finishes are accepted, Architect will use the room or surface to evaluate coating systems of a similar nature.

2. Final approval of colors will be from benchmark samples.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to Project site in manufacturer's original, unopened packages and containers bearing manufacturer's name and label and the following information:

1. Product name or title of material.

2. Product description (generic classification or binder type).

3. Manufacturer's stock number and date of manufacture.

4. Contents by volume, for pigment and vehicle constituents.

5. Thinning instructions.

6. Application instructions.

7. Color name and number.

8. VOC content.

B. Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45 deg F. Maintain storage containers in a clean condition, free of foreign materials and residue.

1. Protect from freezing. Keep storage area neat and orderly. Remove oily rags and waste daily.

C. Take necessary measures to ensure that workers and work areas are protected from fire and health hazards resulting from handling, mixing, and application.

1.7 PROJECT CONDITIONS

A. Apply waterborne paints only when temperatures of surfaces to be painted and surrounding air are between 50 and 90 deg F.

B. Apply solvent-thinned paints only when temperatures of surfaces to be painted and surrounding air are between 45 and 95 deg F.

099123-5

C. Do not apply paint in snow, rain, fog, or mist; or when relative humidity exceeds 85 percent; or at temperatures less than 5 deg F above the dew point; or to damp or wet surfaces.

1. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by manufacturer during application and drying periods.

1.8 EXTRA MATERIALS

A. Furnish extra paint materials from the same production run as the materials applied and in the quantities described below. Package with protective covering for storage and identify with labels describing contents. Deliver left-over paint materials to Owner.

1. Quantity: Furnish Owner with extra paint materials in quantities indicated below:

a. Exterior: 2 gallons of each color applied.

b. Interior: 1 case of each color applied.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Available Products: Subject to compliance with requirements, provide products from one of the following manufacturers. Sherwin-Williams is the basis of design and establishes the standard of quality required.

B. Manufacturers' Names:

1. Sherwin Williams. (SW)

2. Duron

3. MAB

4. Glidden

2.2 PAINT MATERIALS, GENERAL

A. Material Compatibility: Provide block fillers, primers, and finish-coat materials that are compatible with one another and with the substrates indicated under conditions of service and application, as demonstrated by manufacturer based on testing and field experience. Each system should be from the same manufacturer.

B. Material Quality: Provide manufacturer's best-quality paint material of the various coating types specified that are factory formulated and recommended by manufacturer for application indicated. Paint-material containers not displaying manufacturer's product identification will not be acceptable.

099123-6

1. Proprietary Names: Use of manufacturer's proprietary product names to designate colors or materials is not intended to imply that products named are required to be used to the exclusion of equivalent products of other manufacturers. Furnish manufacturer's material data and certificates of performance for proposed substitutions.

C. Colors: Match Architect's samples.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Applicator present, for compliance with requirements for paint application. Comply with procedures specified in

PDCA P4.

1. Proceed with paint application only after unsatisfactory conditions have been corrected and surfaces receiving paint are thoroughly dry.

2. Start of painting will be construed as Applicator's acceptance of surfaces and conditions within a particular area.

B. Coordination of Work: Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers.

1. Notify Architect about anticipated problems when using the materials specified over substrates primed by others.

C. Where materials are being applied over previously painted surfaces, apply mock up samples and perform field testing to check for compatibility, adhesion, and film integrity of the new materials to existing painted surfaces. Report in writing any condition that may affect application, appearance, or performance of the specified coating system.

3.2 PREPARATION

A. General: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to be painted. If removal is impractical or impossible because of size or weight of the item, provide surface-applied protection before surface preparation and painting.

1. After completing painting operations in each space or area, reinstall items removed using workers skilled in the trades involved.

B. Cleaning: Before applying paint or other surface treatments, clean substrates of substances that could impair bond of the various coatings. Remove oil and grease before cleaning. All surfaces must be clean, dry, and free of all oil, grease, surface contaminants, and substances that could impair adhesion.

099123-7

1. Schedule cleaning and painting so dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces.

C. Surface Preparation: Clean and prepare surfaces to be painted according to manufacturer's written instructions for each particular substrate condition and as specified.

1. Provide barrier coats over incompatible primers or remove and reprime.

2. Cementitious Materials: Prepare concrete, concrete unit masonry, cement plaster, and mineral-fiber-reinforced cement panel surfaces to be painted.

Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents.

Roughen as required to remove glaze. If hardeners or sealers have been used to improve curing, use mechanical methods of surface preparation.

a. Use abrasive blast-cleaning methods if recommended by paint manufacturer.

b. Determine alkalinity and moisture content of surfaces by performing appropriate tests. If surfaces are sufficiently alkaline to cause the finish paint to blister and burn, correct this condition before application. Do not paint surfaces if moisture content exceeds that permitted in manufacturer's written instructions.

3. For Concrete Floors:

a. Surface must be clean, dry, and in sound condition. Remove stains, oil, dust, grease, dirt, rust, release agents, curing compounds and hardeners, salts, efflorescence, laitance, and other contaminants and foreign material to ensure adequate adhesion.

b. Follow recommendations as listed in the Sherwin Williams / General Polymers G-1 Surface Preparation Guide and ICRI Guideline #310-2-1997 for surface preparation.

c. Provide Concrete Surface Profile (CSP) as recommended by manufacturer for specified systems.

d. Determine alkalinity and moisture content of surfaces by performing appropriate tests. Document results in writing to GC and architect.

4. Wood: Clean surfaces of dirt, oil, and other foreign substances with scrapers, mineral spirits, and sandpaper, as required. Sand surfaces exposed to view smooth and dust off.

a. Scrape and clean small, dry, seasoned knots, and apply a thin coat of white shellac or other recommended knot sealer before applying primer.

After priming, fill holes and imperfections in finish surfaces with putty or plastic wood filler. Sand smooth when dried.

b. Prime, stain, or seal wood to be painted immediately on delivery. Prime edges, ends, faces, undersides, and back sides of wood, including cabinets, counters, cases, and paneling.

c. If transparent finish is required, backprime with spar varnish.

d. Backprime paneling on interior partitions where masonry, plaster, or other wet wall construction occurs on back side.

e. Seal tops, bottoms, and cutouts of unprimed wood doors with a heavy coat of varnish or sealer immediately on delivery.

5. Ferrous Metals: Clean ungalvanized ferrous-metal surfaces that have not been shop coated; remove oil, grease, dirt, loose mill scale, and other foreign

099123-8 substances. Use solvent or mechanical cleaning methods that comply with SSPC's recommendations.

a. Power Tool Clean surfaces clean as recommended by paint system manufacturer and according to SSPC-SP3.

b. Treat bare and sandblasted or pickled clean metal with a metal treatment wash coat before priming.

c. Touch up bare areas and shop-applied prime coats that have been damaged. Wire-brush, clean with solvents recommended by paint manufacturer, and touch up with same primer as the shop coat.

6. Galvanized Surfaces: Clean galvanized surfaces with nonpetroleum-based solvents so surface is free of oil and surface contaminants. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical methods.

7. Interior Grilles, Louvers and Sprinkler Escutcheons shall be painted in the field to match adjacent material color. Contractor shall prep and prime factory finished items to receive new paint finish in the field.

D. Material Preparation: Mix and prepare paint materials according to manufacturer's written instructions.

1. Maintain containers used in mixing and applying paint in a clean condition, free of foreign materials and residue.

2. Stir material before application to produce a mixture of uniform density. Stir as required during application. Do not stir surface film into material. If necessary, remove surface film and strain material before using.

3. Use only thinners approved by paint manufacturer and only within recommended limits.

E. Tinting: Tint each undercoat a lighter shade to simplify identification of each coat when multiple coats of same material are applied. Tint undercoats to match the color of the finish coat, but provide sufficient differences in shade of undercoats to distinguish each separate coat.

3.3 APPLICATION

A. General: Apply paint according to manufacturer's written instructions. Use applicators and techniques best suited for substrate and type of material being applied.

1. Paint colors, surface treatments, and finishes are indicated in the paint schedules.

2. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film.

3. Provide finish coats that are compatible with primers used.

4. The term "exposed surfaces" includes areas visible when permanent or built-in fixtures, grilles, convector covers, covers for finned-tube radiation, and similar components are in place. Extend coatings in these areas, as required, to maintain system integrity and provide desired protection.

099123-9

5. Paint surfaces behind movable equipment and furniture the same as similar exposed surfaces. Before final installation of equipment, paint surfaces behind permanently fixed equipment or furniture with prime coat only.

6. Paint interior surfaces of ducts with a flat, nonspecular black paint where visible through registers or grilles.

7. Paint back sides of access panels and removable or hinged covers to match exposed surfaces.

8. Finish exterior doors on tops, bottoms, and side edges the same as exterior faces.

9. Finish interior of wall and base cabinets and similar field-finished casework to match exterior.

10. Sand lightly between each succeeding enamel or varnish coat.

B. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration.

1. The number of coats and film thickness required are the same regardless of application method. Do not apply succeeding coats until previous coat has cured as recommended by manufacturer. If sanding is required to produce a smooth, even surface according to manufacturer's written instructions, sand between applications.

2. Omit primer over metal surfaces that have been shop primed and touchup painted.

3. If undercoats, stains, or other conditions show through final coat of paint, apply additional coats until paint film is of uniform finish, color, and appearance. Give special attention to ensure that edges, corners, crevices, welds, and exposed fasteners receive a dry film thickness equivalent to that of flat surfaces.

4. Allow sufficient time between successive coats to permit proper drying. Do not recoat surfaces until paint has dried to where it feels firm, and does not deform or feel sticky under moderate thumb pressure, and until application of another coat of paint does not cause undercoat to lift or lose adhesion.

C. Application Procedures: Apply paints and coatings by brush, roller, spray, or other applicators according to manufacturer's written instructions.

1. Brushes: Use brushes best suited for type of material applied. Use brush of appropriate size for surface or item being painted.

2. Rollers: Use rollers of carpet, velvet-back, or high-pile sheep's wool as recommended by manufacturer for material and texture required.

3. Spray Equipment: Use airless spray equipment with orifice size as recommended by manufacturer for material and texture required.

D. Minimum Coating Thickness: Apply paint materials no thinner than manufacturer's recommended spreading rate to achieve dry film thickness indicated. Provide total dry film thickness of the entire system as recommended by manufacturer.

E. Mechanical and Electrical Work: Painting of mechanical and electrical work is limited to items exposed in equipment rooms and occupied spaces.

F. Mechanical items to be painted include, but are not limited to, the following:

099123-10

1. Exposed uninsulated metal piping.

2. Exposed uninsulated plastic piping.

3. Exposed pipe hangers and supports.

4. Tanks that do not have factory-applied final finishes.

5. Visible portions of internal surfaces of metal ducts, without liner, behind air inlets and outlets.

6. Duct, equipment, and pipe insulation having "all-service jacket" or other paintable jacket material.

7. Mechanical equipment that is indicated to have a factory-primed finish for field painting.

G. Electrical items to be painted include, but are not limited to, the following:

1. Switchgear.

2. Panelboards.

3. Electrical equipment that is indicated to have a factory-primed finish for field painting.

H. All interior and exterior exposed gypsum wallboard, including any bulkheads and soffits to be painted.

I. All interior and exterior ferrous metal to be painted including any lintels, railings, grilles, and louvers (does not include factory or pre-finished items).

J. All hollow metal doors and frames, interior and exterior, to be painted.

K. Block Fillers: Apply block fillers to concrete masonry block at a rate to ensure complete coverage with pores filled.

L. Prime Coats: Before applying finish coats, apply a prime coat, as recommended by manufacturer, to material that is required to be painted or finished and that has not been prime coated by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears, to ensure a finish coat with no burn-through or other defects due to insufficient sealing.

M. Pigmented (Opaque) Finishes: Completely cover surfaces as necessary to provide a smooth, opaque surface of uniform finish, color, appearance, and coverage.

Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections will not be acceptable.

N. Transparent (Clear) Finishes: Use multiple coats to produce a glass-smooth surface film of even luster. Provide a finish free of laps, runs, cloudiness, color irregularity, brush marks, orange peel, nail holes, or other surface imperfections.

1. Provide satin finish for final coats.

O. Completed Work: Match approved samples for color, texture, and coverage.

Remove, refinish, or repaint work not complying with requirements.

P. Marking and Identification: Fire walls, fire barriers, fire partitions, smoke barriers and smoke partitions or any other wall required to have protected openings or

099123-11 penetrations shall be effectively and permanently identified with signs or stenciling.

Such identification shall:

1. Be located in accessible concealed floor, floor-ceiling or attic spaces;

2. Be repeated at intervals not exceeding 30 feet measured horizontally along the wall or partition; and

3. Include lettering not less than 0.5 inch in height, incorporating the suggested wording: "FIRE AND/OR SMOKE BARRIER-PROTECT ALL OPENINGS," or other wording.

a. Exception: Walls in Group R-2 occupancies that do not have a removable decorative ceiling allowing access to the concealed space.

3.4 FIELD QUALITY CONTROL

A. Owner reserves the right to invoke the following test procedure at any time and as often as Owner deems necessary during the period when paint is being applied:

1. Owner will engage a qualified independent testing agency to sample paint material being used. Samples of material delivered to Project will be taken, identified, sealed, and certified in the presence of Contractor.

2. Testing agency will perform appropriate tests for the following characteristics as required by Owner:

a. Quantitative material analysis.

b. Abrasion resistance.

c. Apparent reflectivity.

d. Flexibility.

e. Washability.

f. Absorption.

g. Accelerated weathering.

h. Dry opacity.

i. Accelerated yellowness.

j. Recoating.

k. Skinning.

l. Color retention.

m. Alkali and mildew resistance.

3. Owner may direct Contractor to stop painting if test results show material being used does not comply with specified requirements. Contractor shall remove noncomplying paint from Project site, pay for testing, and repaint surfaces previously coated with the noncomplying paint. If necessary, Contractor may be required to remove noncomplying paint from previously painted surfaces if, on repainting with specified paint, the two coatings are incompatible.

B. Pre-installation Meetings:

1. Schedule a conference and inspection to be held on-site before field application of coating systems begins.

2. Conference shall be attended by Contractor, Owner's representative, Engineer, Construction Manager, coating applicators, and a representative of coating material manufacturer.

3. Topics to be discussed at meeting shall include:

099123-12

a. A review of Contract Documents and accepted shop drawings shall be made and deviations or differences shall be resolved.

b. Review items such as environmental conditions, surface conditions, surface preparation, application procedures, and protection following application.

c. Establish which areas on-site will be available for use as storage areas and working area

4. Pre-construction conference and inspection shall serve to clarify Contract

Documents, application requirements and what work should be completed before coating application can begin.

5. Prepare and submit, to parties in attendance, a written report of pre-installation conference report shall be submitted with 3 days following conference.

6. Field Samples:

a. Provide a full coating system to the required sheen, color, texture, and recommended coverage rates. Simulate finished lighting conditions for reviewing in-place work.

7. The Architect, Construction Manager or Owners Representative will select one room, area, or combination of areas and surfaces and conditions for each type of coating and substrate to be coated. Apply coatings in this room, area, combination of areas and surfaces according to the schedule, or as specified.

After finishes are accepted, this room, area or combination of areas and surfaces will serve as the standard of quality and for evaluation of coating systems of similar nature.

8. A manufacturer’s representative shall be available upon request by the General Contractor or Painting subcontractor, to advise applicator on proper application technique and procedures.

3.5 CLEANING

A. Cleanup: At the end of each workday, remove empty cans, rags, rubbish, and other discarded paint materials from Project site.

1. After completing painting, clean glass and paint-spattered surfaces. Remove spattered paint by washing and scraping without scratching or damaging adjacent finished surfaces.

3.6 PROTECTION

A. Protect work of other trades, whether being painted or not, against damage from painting. Correct damage by cleaning, repairing or replacing, and repainting, as approved by Architect.

B. Provide "Wet Paint" signs to protect newly painted finishes. After completing painting operations, remove temporary protective wrappings provided by others to protect their work.

1. After work of other trades is complete, touch up and restore damaged or defaced painted surfaces. Comply with procedures specified in PDCA P1.

099123-13

3.7 EXTERIOR PAINT SCHEDULE

A. Ferrous Metal: Provide the following finish systems over exterior ferrous metal. Primer is not required on shop-primed items.

1. Semi-Gloss Acrylic-Enamel Finish: two finish coats over a rust-inhibitive primer.

a. Primer: Pro Industrial Pro-Cryl Universal Metal Primer, B66-310 series

b. 1st Coat: Waterbased Acrolon 100 Waterbased Urethane Gloss

c. 2nd Coat: Waterbased Acrolon 100 Waterbased Urethane Gloss

B. Galvanized Metal: Provide the following finish systems over exterior ferrous metal.

Primer is not required on shop-primed items.

1. Semi-Gloss Acrylic-Enamel Finish: two finish coats over a rust-inhibitive primer.

a. Primer: Pro Industrial Pro-Cryl Universal Metal Primer, B66-310 series

C. Poured Concrete/Masonry: Provide the following finish systems over exterior concrete/masonry.

1. Semi-Gloss Acrylic-Enamel Finish: two finish coats over a masonry primer.

a. Primer: Loxon Concrete & Masonry Primer, A24W8300

b. 1st Coat: A-100 Exterior 100% Acrylic Gloss, A8 series

c. 2nd Coat: A-100 Exterior 100% Acrylic Gloss, A8 series

3.8 INTERIOR PAINT SCHEDULE

A. Ferrous Metal: Provide the following finish systems over ferrous metal:

1. Semi-Gloss Finish: two finish coats over a primer.

a. Primer: Pro Industrial Pro-Cryl Universal Metal Primer, B66-310 series

B. Galvanized Metal: Provide the following finish systems over galvanized metal:

1. Semi-Gloss Finish: two finish coats over a primer.

099123-14

a. Primer: Pro Industrial Pro-Cryl Universal Metal Primer, B66-310 series

C. Poured Concrete/Masonry: Provide the following finish systems over interior concrete/masonry.

1. Semi-Gloss Acrylic-Enamel Finish: two finish coats over a masonry primer.

a. Primer: Loxon Concrete & Masonry Primer, A24W8300

b. 1st Coat: A-100 Exterior 100% Acrylic Gloss, A8 series

c. 2nd Coat: A-100 Exterior 100% Acrylic Gloss, A8 series

END OF SECTION 099123