The document is a scope of work for the installation of resilient tile flooring as part of the Chicopee Armory Rehabilitation project in Chicopee, Massachusetts. The project requires the installation of vinyl composition floor tile, including product submittals, qualification data for the installer, and closeout documentation. The scope specifies requirements for product standards, installation methods, substrate preparation, and project conditions. The project is being bid by the Massachusetts state government, with bids due on 05/20/11.
The scope requires the contractor to furnish extra materials, maintain appropriate temperature and humidity levels during installation, and comply with FloorScore and low-VOC requirements. Pricing information is not provided, nor are any details on set-asides, incumbent contractors, funding sources, or other commercial terms. The scope focuses exclusively on the technical specifications and execution requirements for the resilient tile flooring portion of the larger Chicopee Armory Rehabilitation project.
View the file
Other files
Show 40 more
Latest 50 of 185 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985101
CHICOPEE, MASSACHUSETTS ISSUED FOR BID - 05/20/11
10090 RESILIENT TILE FLOORING 096519 - 1
SECTION 096519
RESILIENT TILE FLOORING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Vinyl composition floor tile.
B. Related Sections:
1. Section 096513 "Resilient Base and Accessories" for resilient base, reducer strips, and other accessories installed with resilient floor coverings.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
B. Samples for Initial Selection: For each type of floor tile indicated.
C. Samples for Verification: Full-size units of each color and pattern of floor tile required.
D. Product Schedule: For floor tile.
1.4 INFORMATIONAL SUBMITTALS
A. Qualification Data: For qualified Installer.
1.5 CLOSEOUT SUBMITTALS
A. Maintenance Data: For each type of floor tile to include in maintenance manuals.
1.6 MATERIALS MAINTENANCE SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
10090 RESILIENT TILE FLOORING 096519 - 2
1. Floor Tile: Furnish 1 box for every 50] boxes or fraction thereof, of each type, color, and pattern of floor tile installed.
1.7 QUALITY ASSURANCE
A. Installer Qualifications: A qualified installer who employs workers for this Project who are competent in techniques required by manufacturer for floor tile installation indicated.
1. Engage an installer who employs workers for this Project who are trained or certified by manufacturer for installation techniques required.
B. Fire-Test-Response Characteristics: As determined by testing identical products according to
ASTM E 648 or NFPA 253 by a qualified testing agency.
1. Critical Radiant Flux Classification: Class I, not less than 0.45 W/sq. cm.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Store floor tile and installation materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturer, but not less than 50 deg F or more than 90 deg F. Store floor tiles on flat surfaces.
1.9 PROJECT CONDITIONS
A. Maintain ambient temperatures within range recommended by manufacturer, but not less than
70 deg F or more than 95 deg F , in spaces to receive floor tile during the following time periods:
1. 48 hours before installation.
2. During installation.
3. 48 hours after installation.
B. Until Substantial Completion, maintain ambient temperatures within range recommended by manufacturer, but not less than 55 deg F] or more than 95 deg F .
C. Close spaces to traffic during floor tile installation.
D. Close spaces to traffic for 48 hours after floor tile installation.
E. Install floor tile after other finishing operations, including painting, have been completed.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. FloorScore Compliance: Resilient tile flooring shall comply with requirements of FloorScore
Standard.
10090 RESILIENT TILE FLOORING 096519 - 3
B. Low-Emitting Materials: Flooring system shall comply with the testing and product requirements of the California Department of Health Services' "Standard Practice for the
Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental
Chambers."
2.2 VINYL COMPOSITION FLOOR TILE <Insert drawing designation>
A. Products: Subject to compliance with requirements available products that may be incorporated into the Work include, but are not limited to, the following:
1. Armstrong World Industries, Inc.; .
2. Congoleum Corporation; .
3. Mannington Mills, Inc.; Tarkett, Inc.; .
B. Tile Standard: ASTM F 1066, Class 2, through-pattern tile .
C. Wearing Surface: Smooth .
D. Thickness: [0.125 inch] .
E. Size: 12 by 12 inches.
F. Colors and Patterns: As selected by Architect from full range of industry colors.
2.3 INSTALLATION MATERIALS
A. Trowelable Leveling and Patching Compounds: Latex-modified, portland cement based or blended hydraulic-cement-based formulation provided or approved by manufacturer for applications indicated.
B. Adhesives: Water-resistant type recommended by manufacturer to suit floor tile and substrate conditions indicated.
1. Adhesives shall comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24):
a. VCT and Asphalt Tile Adhesives: Not more than 50 g/L.
2. Adhesives shall comply with the testing and product requirements of the California
Department of Health Services' "Standard Practice for the Testing of Volatile Organic
Emissions from Various Sources Using Small-Scale Environmental Chambers."
C. Floor Polish: Provide protective liquid floor polish products as recommended by manufacturer.
http://www.specagent.com/LookUp/?ulid=484&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456789500&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456789503&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456789505&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456793038&mf=04&src=wd
10090 RESILIENT TILE FLOORING 096519 - 4
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.
B. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of floor tile.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Prepare substrates according to manufacturer's written instructions to ensure adhesion of resilient products.
B. Concrete Substrates: Prepare according to ASTM F 710.
1. Verify that substrates are dry and free of curing compounds, sealers, and hardeners.
2. Remove substrate coatings and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, using mechanical methods recommended by manufacturer. Do not use solvents.
3. Alkalinity and Adhesion Testing: Perform tests recommended by manufacturer. Proceed with installation only after substrates pass testing.
4. Moisture Testing: Perform tests recommended by manufacturer. Proceed with installation only after substrates pass testing.
a. Perform anhydrous calcium chloride test, ASTM F 1869. Proceed with installation only after substrates have maximum moisture-vapor-emission rate of [3 lb of water/1000 sq. ft.] <Insert emission> in 24 hours.
b. Perform relative humidity test using in situ probes, ASTM F 2170. Proceed with installation only after substrates have a maximum [75%] relative humidity level measurement.
C. Access Flooring Panels: Remove protective film of oil or other coating using method recommended by access flooring manufacturer.
D. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound and remove bumps and ridges to produce a uniform and smooth substrate.
E. Do not install floor tiles until they are same temperature as space where they are to be installed.
1. Move resilient products and installation materials into spaces where they will be installed at least 48 hours in advance of installation.
F. Sweep and vacuum clean substrates to be covered by resilient products immediately before installation.
10090 RESILIENT TILE FLOORING 096519 - 5
3.3 FLOOR TILE INSTALLATION
A. Comply with manufacturer's written instructions for installing floor tile.
B. Lay out floor tiles from center marks established with principal walls, discounting minor offsets, so tiles at opposite edges of room are of equal width. Adjust as necessary to avoid using cut widths that equal less than one-half tile at perimeter.
1. Lay tiles square with room axis] .
C. Match floor tiles for color and pattern by selecting tiles from cartons in the same sequence as manufactured and packaged, if so numbered. Discard broken, cracked, chipped, or deformed tiles.
1. Lay tiles with grain direction alternating in adjacent tiles (basket-weave pattern) .
D. Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames.
E. Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles to center of door openings.
F. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on floor tiles as marked on substrates. Use chalk or other nonpermanent, nonstaining marking device.
G. Install floor tiles on covers for telephone and electrical ducts, building expansion-joint covers, and similar items in finished floor areas. Maintain overall continuity of color and pattern between pieces of tile installed on covers and adjoining tiles. Tightly adhere tile edges to substrates that abut covers and to cover perimeters.
H. Adhere floor tiles to flooring substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections.
3.4 CLEANING AND PROTECTION
A. Comply with manufacturer's written instructions for cleaning and protection of floor tile.
B. Perform the following operations immediately after completing floor tile installation:
1. Remove adhesive and other blemishes from exposed surfaces.
2. Sweep and vacuum surfaces thoroughly.
3. Damp-mop surfaces to remove marks and soil.
C. Protect floor tile products from mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period.
D. Floor Polish: Remove soil, visible adhesive, and surface blemishes from floor tile surfaces before applying liquid floor polish.
10090 RESILIENT TILE FLOORING 096519 - 6
1. Apply [two] [three] coat(s).
E. Cover floor tile until Substantial Completion.
END OF SECTION 096519